ELEMENT/TRADE/WORK CATEGORY
ITEM OUTPUT
A Material
4.48
B Plant
Included in Preliminaries
C Labour
D Overhead
5% @ RM RM 0.36
E Profit
10% @ RM RM 0.73
RM 8.39 / m2
ITEM OUTPUT
A Material
2.15
B Plant
Included in Preliminaries
C Labour
D Overhead
5% @ RM RM 0.25
E Profit
10% @ RM RM 0.50
RM 5.71 / m2
ITEM OUTPUT
A Material
1.43
B Plant
Included in Preliminaries
C Labour
D Overhead
5% @ RM RM 0.21
E Profit
10% @ RM RM 0.42
RM 4.88 / m2
ITEM OUTPUT
A Material
1.43
B Plant
Included in Preliminaries
C Labour
D Overhead
5% @ RM RM 0.21
E Profit
10% @ RM RM 0.42
RM 4.88 / m2
ITEM OUTPUT
A Material
Supply
5.00 litre
RM 193.60
RM 38.72 /litre
*1 litre = 5 m2
RM /m3 RM 0.00 / m3
0.00 / m3
B Plant
Included in Preliminaries
C Labour
D Overhead
5% @ RM RM 0.33
E Profit
15% @ RM RM 1.00
RM 8.00 / m3
ITEM OUTPUT
A Material
Supply
5.00 litre
RM 193.60
RM 38.72 /litre
*1 litre = 5 m2
RM /m3 RM 0.00 / m3
0.00 / m3
B Plant
Included in Preliminaries
C Labour
D Overhead
5% @ RM RM 1.00
E Profit
15% @ RM RM 3.00
RM 24.00 / m3
ITEM OUTPUT
A Material
Supply
5.00 litre
RM 193.60
RM 38.72 /litre
*1 litre = 5 m2
RM /m3 RM 0.00 / m3
0.00 / m3
B Plant
Included in Preliminaries
C Labour
D Overhead
5% @ RM RM 1.50
E Profit
15% @ RM RM 4.50
RM 36.00 / m3