H1AC1 Installation Guide
H1AC1 Installation Guide
H1AC1 Installation Guide
Packing List
A B C D E
F G H I J
K L M N O
P
Object Quantity Description Object Quantity Description
A 1 Inverter I 1 Earth terminal
B 1 Bracket J 1 Communication connector
PV connectors (for Hybrid only)
C 4 K 1 Product manual
(2*positive, 2*negative)
PV pin contacts (for Hybrid only)
D 4 L 1 Quick installation guide
(2*positive, 2*negative)
E 2 AC connectors M 1 CT (with 10m cable)
Battery connectors
F 2 N 1 WiFi/LAN/GPRS (Optional)
(1*positive, 1*negative)
Battery pin contacts
G 2 O 1 Meter (Optional)
(1*positive, 1*negative)
H 5 Expansion tubes& Expansion screws P 1 CT extension connector
1
Inverter Installation
Please make sure the inverter will be installed with a proper distance
as shown below.
2
Insert the expansion tubes into the holes and tighten them. Install the
bracket with the expansion screws.
3
Serial Port Connections
PIN
1 2 3 4 5 6 7 8
Port
CT/
Meter Meter
Meter/ 485B 485A CT2+ CT2- CT1- CT1+
485A 485B
485
BMS- BMS- BMS- BMS-
BMS / GND / /
485B CANL CANH 485A
DRM DRM DRM DRM
DRM GND GND DRM0 +3.3V
4/8 3/7 2/6 1/5
Note:
CT1: For Hybrid/AC, CT2: Grid tied inverter (if have).
Compatible Meter type: DDSU666 (CHINT), SDM230 (EASTRON).
4
Wiring Steps
· Insert striped cable into pin contact and ensure all conductor strands
are captured in the pin contact.
5
· Unlock the DC connector:
Battery Wring
· Turn off the DC switch.
· Choose 10 AWG wire to connect the battery.
· Trim 6mm of insulation from the wire end.
10AWG
· Insert striped cable into pin contact and ensure all conductor strands
are captured in the pin contact.
6
· Crimp pin contact by using a crimping plier. Put the pin
contact with striped cable into the corresponding
crimping pliers and crimp the contact.
·➢ Insert pin contact through the cable nut to assemble into back of the
male or female plug. When you feel or hear a “click” the pin contact
assembly is seated correctly.
Grid Wiring
Cable dimensions
Model (kW) 3.0 3.7 4.6 5.0 6.0
7
- Trim all the wires to 52.5mm and the PE wire to 55mm.
- Use the crimping pliers to trim 12mm of insulation from all wire ends
as shown in the picture.
L: Brown/Red Wire
N: Blue/Black Wire
PE: Yellow & Green Wire
Note: Please refer to local cable type and color for actual installation.
A. BACK-UP Wiring
8
· Push the threaded sleeve to connection terminal until both are locked
tightly on the inverter.
· Loosen the cap on the terminal, pull the threaded sleeve out of the
socket.
B. AC Wiring
· Separate the AC plug into three parts as below.
1. Hold the middle part of the female insert, rotate the back shell to
loosen it, and detach it from female inset.
2. Remove the cable nut (with rubber insert) from the back shell.
9
· Push the threaded sleeve into the socket,
tighten up the cap on the terminal.
· Push the threaded sleeve to connection terminal until both are locked
tightly on the inverter.
Grounding Wiring
Use the crimping pliers to press the ground cable into the ground terminal,
screw the ground screw with screwdriver as shown below.
10
BMS Connection
Step 1: Prepare a standard network cable and cable connector, then insert
the network cable through the cable connector.
Step 2: Crimp the cable with a Rj45 plug which is inside of the cable
connector.
Step 3: Insert the cable connector into BMS port at the bottom of inverter.
11
Inverter Start-Up
12