Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

MP-01 - Condotel

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

DON HONORIO VENTURA TECHNOLOGICAL STATE UNIVESITY

Bacolor, Pampanga
COLLEGE OF ENGINEERING AND ARCHITECTURE
DEPARTMENT OF ARCHITECTURE

Major Plate No. 02


Design 08

High Rise Condominium – Hotel Complex


(minimum 25 Floors)
AREA REQUIREMENTS*
A. Condominium –

Lobby * Studio Type Unit


Reception Area 1 Bedroom Unit
Waiting Lounge 2 Bedroom Unit
Elevator Lobby 3 Bedroom Unit
Mailing Room (Condo Only) Penthouse Units
Public Restrooms (Ref.: Plumbing Code)
CCTV/Security Room B. Hotel -5 star*
Admin Room/Area/Compound* (Shared Spaces) Refer to your Research
Leasing
Accounting C. Amenity Areas
Advertising Indoor Basketball Court
Human Resource Office Daycare Room
Conference Rm/Training Rm Function Rooms
Waiting Lounge Gym
Employees Lounge Dance Studio
Managers Office Outdoor Swimming Pool
CEO Office Tennis Court
Engineering Office* Casino/Game Area*
Storages* Commercial Strips/Promenade
Utilities* Food Establishments
Metering Rooms
Generator Rooms D. Site*
AHU
Pump Rooms Indoor/Outdoor Parking Areas (See PD 1096
Electrical Room Reqts.)
Telcos (Condo Only) Walking Strip
Drivers Lounge Park Security Post/Guard Houses
Garbage Room/MRF* Signages
Fire Exits (See PD 1096)
Units
*- listed area requirements are just the minimum and may not be complete, it’s the designers duty to review and
suggest some of the missing area reqts. that the project need.
Drawing Requirements – Full Details Linen Paper (30”x20”)
1. Concept Board NTS
2. Site Development Plan ACS (Manual)
3. Floor Plans 1:100 mts. (Manual)
4. Elevations (2) 1:100 mts (Digital)
5. Sections(2) 1:100 mts (Digital)
6. Blow Up Plans w/ Perspective (Condo) 1:20 mts (Manual)
7. Normal View Perspective NTS (Digital)
8. Aerial View Perspective NTS (Digital)
9. Interior Perspectives NTS (Manual)
a. Hotel rms. (3)
b. Lobby
c. Amenity Area (Choose 4)
10. Report – (Short Bond Paper)
a. Proposed Name of Project w/ Explanation
b. List of Areas
c. Brief Architectural Explanation/Description of the Project
11. Walkthrough Presentation- Optional

You might also like