PT BJ SERVICES INDONESIA

CEMENTING JOB CALCULATIONS

Subject : 13 3/8" Casing Cementing Job BP Rep : Mr. Kelly / Mr. Sunaryo
Client : BP WEST JAVA Ltd. BJ Rep : Andy S / Ridwan S
Well : FG-7 Date : April 29, 2023
Rig Name : JT ANGEL

A. WELL DIAGRAM B. VOLUME AND CAPACITY


ID Capacity
Descriptions Descriptions Length Unit
Stick Up (Inch) Cuft/Ft Bbls/Ft
0 Ft 30 28.000 4.2759 0.7615 Lead at Casing 350 Ft
Casing
13 3/8 12.515 0.8542 0.1521 Lead at Annulus 270 Ft
TOC OH 17 1/2 - 1.6703 0.2975 Tail at Annulus 300 Ft
0 Ft 30 - 13 3/8 - 3.3003 0.5878
Annulus
OH - 13 3/8 - 0.6946 0.1237

Casing Excess 50% Excess 50%


30 In LEAD TAIL TOTAL
Descriptions
310 # Cuft Bbl Cuft Bbl Cuft Bbl
30 - 13 3/8 1155.09 205.72 - - 1155.09 205.72
Annulus
Casing OH - 13 3/8 187.55 33.40 208.39 37.11 395.93 70.52
13 3/8 In Shoe Track - - 68.34 12.17 68.34 12.17
61 # Rat Hole - - - - - -
Excess 93.77 16.70 104.19 18.56 197.97 35.26
Shoe TOTAL 1436.41 255.83 380.92 67.84 1817.33 323.67
350 Ft
C. SLURRY COMPOSITIONS

Top of TAIL Slurry Unit Lead Slurry Unit Tail


620 Ft Density ppg 12.50 Density ppg 15.80
Yield Cuft/Sxs 1.95 Yield Cuft/Sxs 1.20
Fresh Water gps 5.35 Sea Water gps 3.94
OH Mix Water gps 11.00 Mix Water gps 5.42
17 1/2 In
Lab Test Result Lead Conditions Tail
Thickening Time (70 BC) 02 : 50 at 70 BC 02:51
Fluid Loss @ BHCT 39cc /30 min/1000 psi 33 cc
Free Water @ BHCT 0% by Volume 0%
CS @ BHST 906 psi after 12 hrs 1784 psi
F/C
840 Ft D. MATERIAL REQUIREMENTS

Descriptions Unit Lead Tail TOTAL


CEMENT Sxs 737 317 1054
Shoe Track Slurry Bbls 256 68 324
80 Ft FreshWater(Lead) Bbls 94 - 94
Sea Water (Tail) Bbls - 30 30
Mix Water Bbls 193 41 234

Casing Shoe LEAD SLURRY TAIL SLURRY GRAND


Descriptions UNIT
920 Ft Unit Conc Unit Total Unit Conc Unit Total TOTAL
LW-6 % bwoc 23% Lbs 15,926 % bwoc - Lbs - 15,926 Lbs
Bentonite % bwoc 1% Lbs 692 % bwoc - Lbs - 692 Lbs
AEF-100L gps - gall - gps 0.030 gall 10 10 gall
FL-45LS gps 1.000 gall 737 gps 0.800 gall 254 991 gall
MD : 920 Ft CD-31LS gps 0.150 gall 110 gps 0.120 gall 38 149 gall
TVD : 920 Ft A-7L gps 0.080 gall 59 gps - gall - 59 gall
Rat Hole : 0 Ft BA58L gps 0.850 gall 626 gps 0.500 gall 159 785 gall
FP-9LS gps 0.030 gall 22 gps 0.030 gall 10 32 gall

SPACER MCS - Spacer 80 Bbl

DISPLACEMENT VOLUME 127.8 Bbls


J SERVICES INDONESIA
NG JOB CALCULATIONS

Mr. Kelly / Mr. Sunaryo


Andy S / Ridwan S
April 29, 2023

S
PT BJ SERVICES INDONESIA
CEMENTING JOB CALCULATIONS

Subject : 9 5/8" Casing Cementing Job BP Rep : Mr. Kelly / Mr. Sunaryo
Client : BP WEST JAVA Ltd. BJ Rep : Andy S / Ridwan S
Well : FG-7 Date : April 29, 2023
Rig Name : JT ANGEL

A. WELL DIAGRAM B. VOLUME AND CAPACITY


ID Capacity
Descriptions Descriptions Length Unit
Stick Up (Inch) Cuft/Ft Bbls/Ft
0 Ft 13 3/8 12.515 0.8542 0.1521 Lead at Casing 920 Ft
Casing
9 5/8 8.681 0.4110 0.0732 Lead at Annulus 590 Ft
TOC OH 12 1/4 - 0.8184 0.1458 Tail at Annulus 300 Ft
0 Ft 13 3/8 - 9 5/8 - 0.3490 0.0622
Annulus
OH - 9 5/8 - 0.3132 0.0558

Casing Excess 50% Excess 50%


13 3/8 In LEAD TAIL TOTAL
Descriptions
61 # Cuft Bbl Cuft Bbl Cuft Bbl
13 3/8 - 9 5/8 321.05 57.18 - - 321.05 57.18
Annulus
Casing OH - 9 5/8 184.78 32.91 93.95 16.73 278.73 49.64
9 5/8 In Shoe Track - - 32.88 5.86 32.88 5.86
47 # Rat Hole - - - - - -
Excess 92.39 16.45 46.98 8.37 139.36 24.82
Shoe TOTAL 598.22 106.54 173.81 30.96 772.03 137.50
920 Ft
C. SLURRY COMPOSITIONS

Top of TAIL Slurry Unit Lead Slurry Unit Tail


1510 Ft Density ppg 12.50 Density ppg 15.80
Yield Cuft/Sxs 1.86 Yield Cuft/Sxs 1.18
Fresh Water gps 6.22 Sea Water gps 4.67
OH Mix Water gps 10.34 Mix Water gps 5.27
12 1/4 In
Lab Test Result Lead Conditions Tail
Thickening Time (70 BC) 02 : 50 at 70 BC 02:51
Fluid Loss @ BHCT 39cc /30 min/1000 psi 33 cc
Free Water @ BHCT 0% by Volume 0%
CS @ BHST 906 psi after 12 hrs 1784 psi
F/C
1730 Ft D. MATERIAL REQUIREMENTS

Descriptions Unit Lead Tail TOTAL


CEMENT Sxs 322 147 469
Shoe Track Slurry Bbls 107 31 137
80 Ft FreshWater(Lead) Bbls 48 - 48
Sea Water (Tail) Bbls - 16 16
Mix Water Bbls 79 18 98

Casing Shoe LEAD SLURRY TAIL SLURRY GRAND


Descriptions UNIT
1810 Ft Unit Conc Unit Total Unit Conc Unit Total TOTAL
LW-6 % bwoc 23% Lbs 6,953 % bwoc - Lbs - 6,953 Lbs
Bentonite % bwoc 1% Lbs 302 % bwoc - Lbs - 302 Lbs
FL-45LS gps 0.450 gall 145 gps 0.500 gall 74 218 gall
CD-31LS gps 0.080 gall 26 gps 0.060 gall 9 35 gall
MD : 1810 Ft R-21L gps 0.005 gall 2 gps 0.010 gall 1 3 gall
TVD : 1517 Ft FP-9LS gps 0.030 gall 10 gps 0.030 gall 4 14 gall
Rat Hole : 0 Ft - gps - gall - gps - gall - - gall
- gps - gall - gps - gall - - gall

SPACER MCS - Spacer 80 Bbl

DISPLACEMENT VOLUME 126.6 Bbls


PT BJ SERVICES INDONESIA
CEMENTING JOB CALCULATIONS

Subject : 7" Casing Cementing Job BP Rep : Mr. Kelly / Mr. Sunaryo
Client : BP WEST JAVA Ltd. BJ Rep : Andy S / Ridwan S
Well : FG-7 Date : April 29, 2023
Rig Name : JT ANGEL

A. WELL DIAGRAM B. VOLUME AND CAPACITY


ID Capacity
Descriptions Descriptions Length Unit
Stick Up (Inch) Cuft/Ft Bbls/Ft
0 Ft 9 5/8 8.681 0.4110 0.0732 Lead at Casing 1810 Ft
Casing
7 6.276 0.2148 0.0383 Lead at Annulus 1929 Ft
TOC OH 8 1/2 - 0.3941 0.0702 Tail at Annulus 300 Ft
0 Ft 9 5/8 - 7 - 0.1438 0.0256
Annulus
OH - 7 - 0.1268 0.0226

Casing Excess 50% Excess 50%


9 5/8 In LEAD TAIL TOTAL
Descriptions
47 # Cuft Bbl Cuft Bbl Cuft Bbl
9 5/8 - 7 260.22 46.34 - - 260.22 46.34
Annulus
Casing OH - 7 244.61 43.56 38.04 6.78 282.65 50.34
7 In Shoe Track - - 17.19 3.06 17.19 3.06
26 # Rat Hole - - - - - -
Excess 122.30 21.78 19.02 3.39 141.32 25.17
Shoe TOTAL 627.13 111.69 74.25 13.22 701.38 124.92
1810 Ft
C. SLURRY COMPOSITIONS

Top of TAIL Slurry Unit Lead Slurry Unit Tail


3739 Ft Density ppg 12.50 Density ppg 15.80
Yield Cuft/Sxs 1.86 Yield Cuft/Sxs 1.21
Fresh Water gps 5.70 Sea Water gps 3.75
OH Mix Water gps 10.40 Mix Water gps 5.51
8 1/2 In
Lab Test Result Lead Conditions Tail
Thickening Time (70 BC) 02 : 50 at 70 BC 02:51
Fluid Loss @ BHCT 39cc /30 min/1000 psi 33 cc
Free Water @ BHCT 0% by Volume 0%
CS @ BHST 906 psi after 12 hrs 1784 psi
F/C
3959 Ft D. MATERIAL REQUIREMENTS

Descriptions Unit Lead Tail TOTAL


CEMENT Sxs 337 61 399
Shoe Track Slurry Bbls 112 13 125
80 Ft FreshWater(Lead) Bbls 46 - 46
Sea Water (Tail) Bbls - 5 5
Mix Water Bbls 83 8 92

Casing Shoe LEAD SLURRY TAIL SLURRY GRAND


Descriptions UNIT
4039 Ft Unit Conc Unit Total Unit Conc Unit Total TOTAL
LW-6 % bwoc 23% Lbs 7,290 % bwoc - Lbs - 7,290 Lbs
Bentonite % bwoc 1% Lbs 317 % bwoc - Lbs - 317 Lbs
FL-45LS gps 0.950 gall 320 gps 1.000 gall 61 382 gall
CD-31LS gps 0.130 gall 44 gps 0.150 gall 9 53 gall
MD : 4039 Ft R-21L gps 0.050 gall 17 gps 0.080 gall 5 22 gall
TVD : 3523 Ft BA-58L gps - gall - gps 0.500 gall 31 31 gall
Rat Hole : 0 Ft FP-9LS gps 0.030 gall 10 gps 0.030 gall 2 12 gall
- gps - gall - gps - gall - - gall

SPACER MCS - Spacer 80 Bbl

DISPLACEMENT VOLUME 151.5 Bbls


PT BJ SERVICES INDONESIA
CEMENTING JOB CALCULATIONS

Subject : 7" Liner Casing Cementing Job BP Rep : Mr. Kelly / Mr. Sunaryo
Client : BP WEST JAVA Ltd. BJ Rep : Andy S / Ridwan S
Well : FG-7 Date : April 29, 2023
Rig Name : JT ANGEL

A. WELL DIAGRAM B. VOLUME AND CAPACITY

ID Capacity
Descriptions Descriptions Length Unit
Stick Up (Inch) Cuft/Ft Bbls/Ft
0 Ft DP 5 4.276 0.0997 0.0178 Lead at Casing 200 Ft
9 5/8 8.681 0.4110 0.0732 Lead at Annulus 1929 Ft
Casing
Casing 7 6.276 0.2148 0.0383 Tail at Annulus 300 Ft
9 5/8 In OH 8 1/2 - 0.3941 0.0702
47 # 9 5/8 - 7 - 0.1438 0.0256
Annulus
OH - 7 - 0.1268 0.0226
DP
5 In Excess 50% Excess 50%
19.5 # LEAD TAIL TOTAL
Descriptions
Cuft Bbl Cuft Bbl Cuft Bbl
9 5/8 - 7 28.75 5.12 - - 28.75 5.12
Annulus
TOC / LINER OH - 7 244.61 43.56 38.04 6.78 282.65 50.34
1610 Ft Shoe Track - - 17.19 3.06 17.19 3.06
Rat Hole - - - - - -
Shoe Excess 122.30 21.78 19.02 3.39 141.32 25.17
1810 Ft TOTAL 395.66 70.47 74.25 13.22 469.91 83.69

C. SLURRY COMPOSITIONS
Top of TAIL
3739 Ft Slurry Unit Lead Slurry Unit Tail
Density ppg 12.50 Density ppg 15.80
Yield Cuft/Sxs 1.86 Yield Cuft/Sxs 1.21
OH Fresh Water gps 5.70 Sea Water gps 3.75
8 1/2 In Mix Water gps 10.40 Mix Water gps 5.51

Casing Lab Test Result Lead Conditions Tail


7 In Thickening Time (70 BC) 02 : 50 at 70 BC 02:51
26 # Fluid Loss @ BHCT 39cc /30 min/1000 psi 33 cc
Free Water @ BHCT 0% by Volume 0%
F/C CS @ BHST 906 psi after 12 hrs 1784 psi
3959 Ft
D. MATERIAL REQUIREMENTS

Descriptions Unit Lead Tail TOTAL


Shoe Track CEMENT Sxs 213 61 274
80 Ft Slurry Bbls 70 13 84
FreshWater(Lead) Bbls 29 - 29
Sea Water (Tail) Bbls - 5 5
Mix Water Bbls 53 8 61
7" Liner Shoe
4039 Ft LEAD SLURRY TAIL SLURRY GRAND
Descriptions UNIT
Unit Conc Unit Total Unit Conc Unit Total TOTAL
LW-6 % bwoc 23% Lbs 4,599 % bwoc - Lbs - 4,599 Lbs
Bentonite % bwoc 1% Lbs 200 % bwoc - Lbs - 200 Lbs
FL-45LS gps 0.950 gall 202 gps 1.000 gall 61 263 gall
MD : 4039 Ft CD-31LS gps 0.130 gall 28 gps 0.150 gall 9 37 gall
TVD : 3523 Ft R-21L gps 0.050 gall 11 gps 0.080 gall 5 16 gall
Rat Hole : 0 Ft BA-58L gps - gall - gps 0.500 gall 31 31 gall
FP-9LS gps 0.030 gall 6 gps 0.030 gall 2 8 gall
- gps - gall - gps - gall - - gall

SPACER MCS - Spacer 80 Bbl

DISPLACEMENT VOLUME 118.5 Bbls


PT BJ SERVICES INDONESIA
CEMENTING JOB CALCULATIONS

Subject : 3.5" Liner Casing Cementing Job BP Rep : Mr. Kelly / Mr. Sunaryo
Client : BP WEST JAVA Ltd. BJ Rep : Andy S / Ridwan S
Well : FG-7 Date : April 29, 2023
Rig Name : JT ANGEL

A. WELL DIAGRAM B. VOLUME AND CAPACITY

ID Capacity
Descriptions Descriptions Length Unit
Stick Up (Inch) Cuft/Ft Bbls/Ft
20.17 Ft DP 3 1/2 2.764 0.0417 0.0074 Tail at Casing 127 Ft
7 6.276 0.2148 0.0383 Tail at Annulus 1437 Ft
Casing
Casing 3 1/2 2.992 0.0488 0.0087
7 In OH 6 8/9 - 0.2597 0.0462
26 # 7 - 3 1/2 - 0.1480 0.0264
Annulus
OH - 3 1/2 - 0.1929 0.0343
DP
3 1/2 In Excess 10%
13.3 # TAIL TOTAL
Descriptions
Cuft Bbl Cuft Bbl
7 - 3 1/2 18.80 3.35 18.80 3.35
Annulus
TOC / LINER OH - 3 1/2 277.13 49.36 277.13 49.36
5216 Ft Shoe Track 3.57 0.64 3.57 0.64
Rat Hole - - - -
Shoe Excess 27.71 4.94 27.71 4.94
5343 Ft TOTAL 327.21 58.28 327.21 58.28

C. SLURRY COMPOSITIONS

Slurry Unit Tail


OH Density ppg 15.80
6.9 In Yield Cuft/Sxs 1.20
Sea Water gps 3.70
Mix Water gps 5.42

Casing Lab Test Result Lead Conditions Tail


3 1/2 In Thickening Time (70 BC) 02 : 50 at 70 BC 02:51
9.3 # Fluid Loss @ BHCT 39cc /30 min/1000 psi 33 cc
Free Water @ BHCT 0% by Volume 0%
F/C CS @ BHST 906 psi after 12 hrs 1784 psi
6707 Ft
D. MATERIAL REQUIREMENTS

Descriptions Unit Tail TOTAL


Shoe Track CEMENT Sxs 273 273
73.06 Ft Slurry Bbls 58 58
Sea Water Bbls 24 24
Mix Water Bbls 35 35

3.5" Liner Shoe TAIL SLURRY


Descriptions
6780 Ft Unit Conc Unit Total
FL-45LS gps 0.950 gall 259
CD-31LS gps 0.160 gall 44
BA-58LS gps 0.500 gall 136
R-21L gps 0.085 gall 23
MD : 6780 Ft FP-9LS gps 0.030 gall 8
TVD : 2891 Ft
Rat Hole : 0 Ft SPACER MCS - Spacer 80 Bbl

DISPLACEMENT VOLUME 51.8 Bbls