Name of work:

(Revasa Village Construction of 4-lane NH-29


km 818.00 of NH-2) as apart tofBypass
connecting NH-29 (near Sandaha Village km. 11.170 of NH-29) with NH-2
Bypassto Varanasi (Phase-ll, Package-2) from Design chainage km 30.600 to
NHA km
57.320=26.720km (Total Length 27.270km includingi interchange loop at NH-2) in the State of Uttar Pradesh under |GAMMON
NHDP Phase-Vll on EPC mode.
GMN-0104-QAC-F100-00
CLIENT
NATIONAL HIGHWAY AUTHORITY OF INDIA
AUTHORITY ENGINEER L.N. MALVIYA INFRA PVT. LTD
EPC CONTRACTOR GAMMON ENGINEERS AND CONTRACTORS PRIVATE LIMITED
REQUEST FOR INSEPECTION

Date of Submission: 922 Date of Inspection: 29l22


RFI NO:0,¬CPL]vws w2BS64 Time of Inspection : ooQM

ITEM:

Chainagel
Location: 31+828 (RHS)

Work

Description:
|oyer
Ton Ah Cne)

Previous layerl lift approved at above chainage: Yes No

Enclosures : 1Level Sheet


Requested By
Aaula

2 Field Density Test

4 For theEPC Contractor


Inspected and recommended for:

Approval Not Approval Stretch Not Ready

Do the Remedial works as stated below but no further approvalrequired.


Remedial works required as below re-inspection and Apprival required.

Comments if any:
Pdd Che Che found
Date AUTHORITY ENGINEER's
hame of work: Construction of 4-lane NH-29 Bypass connecing NH.29 (near Sandaha Village km. 11.170 of NH-29) with Nh
vdge km 818.00 of NH-2) as a part of Bypass to Varanasi (Phase-lI, Package-2) from Design chainage km 30.600 to
under
HAI
n 0F2D.120km(Total Length 27.270km including interchange loop at NH-2) in the State of Uttar Pradesh GAMMON
NHDP Phase-Vllon EPC mode.
GMN-0104-QAC-F100-00

CLIENT NATIONAL HIGHWAY AUTHORITY OF INDIA

AUTHORITY ENGINEER LN. MALVIYA INFRA PVT. LTD


EPC CONTRACTOR GAMMON ENGINEERS AND CONTRACTORS PRIVATE LIMITED
FIELD COMPACTION TEST BY SAND REPLACEMENT METHOD
AS PER (IS :2720 Part-28)
Chainage Fom .3t.82....o.39S.RMC Date of Testing 2)9/2
Type of Work: Paaash MDD (gm/cc): |370
Laver No. OMC(%): 21-60
Source of Matenal. TPC Specified % of MDD :90% /95% /97% / 98%
CALIBRATION OF SAND
Mean weight of sand of cone of pouring cylinder (gm) W2
<

volume of calibrating container (cc) 3I)4


Weight of Sand +Cylinder before pouring (gm) Wi|SO
Weight of Sand + Cylinder after pouring in the calibrating cintainer (gm) W3 qyQ
Weight of Sand +calibrating container (gm)=W:-W:W3 Wa 331
Bulk Density of sand (gm/cc)=WaN BDA|340
FIELD COMPLECTION
2 3 4 5 6
Description
Spot Chainage of Test (Random)
Distance from edge (M) 29S 4 | | 9
Weight of wet material from hole (gm)Ww S229S266sIL9S724 4q s4S36
Weight of sand + Cyt. before pouring (gm)Wi
Weight of sand + Cyt. after pouring (gm)W3 434)42 S 8 G4o0 442qSE33
Weight of sand in hole (gm) Ws=W1-W2-Ws
Volume of pithole (gm)V;= Ws/BDA 3226328S3I84 3SI3306337
Density of wet Soil (gm/cc) BDB =Ww/Wi G2 604G24/6 29|613Co
Corrected M.C. by RMM, + % FMC 1:1G19: 87 2621:7920:98 2043
Field Dry Density. (gm/cc) FDD =(100xBDBY(100+FMC)-338|337339 ):338||337|337
Relative compaction (%) = FDD*100/MDD 97: 6647- 6o97:73 47:6G47 G/la7:
Mean Density (gm/cc) 97: 74/
Standard Deviation (gm/cc)
Note: If considerable variations are observed between individual density result then the nos. of test are increased and acceptance criteria is subject
othe condition that the Mean density is not less then the specified density plus t1.65 { 1.65/ (No. of Samples ") times the standard deviation.
Remark: YES /No. confirms to MORTH Rev 2015specifications.

EPC CONTRACTOR A.E.


NH-29) with NH-2
connecting NH.29 (near Sandaha Vilage km. 11.170 of
Name of wWork: Construction of 4-lane NH.29 Aunacs Design chainage km 30.600to
Varanasi(Phase-ll, Package-2) from
(Kevasa Village km 818.00 of NH-2) as apart of Bypass to interchange loop at NH-2) in the State of Uttar Pradesh under |GAMMON
including
NHAL Km 57.320=26.720km (Total Length 27 270km NHDP Phase-Vl on EPC mode.
GMN-0104-QAC-F100-00

INDIA
CLIENT NATIONAL HIGHWAY AUTHORITY OF
LTD
AUTHORITY ENGINEER L.N. MALVIYA INFRA PVT.
CONTRACTORS PRIVATE LIMITED
EPC CONTRACTOR GAMMON ENGINEERS AND
REPLACEMENT METHOD
FIELD COMPACTION TEST BY SAND
AS PER (IS:2720 Part-28)
:.3.tS..o..3....ASO..KMCWDate of Testing 2/9/22
Chainage Form MDD (gm/cc): 370
Type of Work :Pela OMC(%): 2) 60
Layer No. Specified % of MDD :90% /95% /97% /98%
Source of Material: N1 PC
CALIBRATION OF SAND
Wz D7S
Mean weight of sand of cone of pouringcylinder (gm)
V
volume of calibrating container (cc)
Weight of Sand + Cylinder before pouring (gm) WiSO
(gm) W3
Weight of Sand + Cylinder after pouring in the calibrating cintainer
Weight of Sand + calibrating container (gm)=Wi-WaWs
WAH337
Bulk Density of sand (gm/cc)=WN BDA370
FIELD COMPLECTION
4 5 6
2 3
Description
Spot Chainage of Test (Random)
tq12| q04436+44E
Distance from edge (M)
32
Weight of wet material from hole (gm)Ww S327c4G9 36 q47
Weight of sand + Cyt. before pouring (gm)Wi
Weight of sand + Cyt. after pouring (gm)W3 |4226 GL6I qG 43 9S27
Weight of sand in hole (gm) Wa=W1-VW2-W3
Volume of pit/hole (gm)V1= Wa/BDA 330433SS7009302
Density of wet Soil (gm/cc) BDB = Ww/Ni |61030||607|/600
Corrected M.C. by RMM, + % FMC 19:982):7 ||4:7614
Field Dry Density.(gm/cc) FDD =(100xBDB)(100+FMC) 342 :339|342||3 40
Relative compaction (%) = FDD*100/MDD 97:95 47: 7697:47 T7 Jo
Mean Density (gm/cc) q774 .
Standard Deviation (gm/cc)
Note : lf considerable variations are observed between individual density result then the nos. of test are increased and acceptance criteria is subject
to the condition that the Mean densily is not les then the specified density plus t1.65-( 1.65/ (No. of Samples ") times the standard deviation.
Remark: YES / No. confirms to MORTH Rev 2015 specifications.

EPC CONTRACTOR A.E.