Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Ignment: Found

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

AlNE Or Work:

(Revasa VillageConstruction of 4-lane


km 818.00 of NH-2) asNH-29 Bypass connecting NH-29 (near Sandaha Village km. 11.170of NH-29) with NH-2
HAL
km apartof Bypass to Varanasi(Phase-ll, Package-2) from Design chainage km 30.600to
57.320=26.720km(Total ILength 27.270kmNHDPincluding interchange loop at NH-2)in the State of Uttar Pradesh under
Phase-Vll on EPC mode. GAMMON

CLIENT GMN-0104-QAC-F100-00
NATIONAL HIGHWAY AUTHORITY OF INDIA
AUTHORTY ENGINEER L.N, MALVIYA INFRAPVT. LTD
EPC CONTRACTOR GAMMONENGINEERS AND CONTRACTORS PRIVATE LIMITED
REQUEST FOR INSEPECTION

Date of Submission:
T4)22 Date of Inspection : 219/22
RI NO: ECP uNs y|28S66 Time of Inspection :

ITEM : RE-Poney

Chainage/
Location: to

Work
Description: Re Ponel
ignment

Previous layer/ lift approved at above chainage: Yes / No

Enclosures: 1Level Sheet Requested By

2 Field Density Test


3

4 For tne/EPC Contractor


Inspected and recommended for:

Approval Not Approval Stretch Not Ready

Do the Remedial works as stated below but no further approval required.

Remedial works required as below re-inspection and Apprival required.

Comments if any:
Checke found
ate:
AUTHORITY ENGINEER's