Hello again, it seemed like I might never get to the end of configuring the service order, but it finally
happened. And since I’ve been a roll, I figured I’d roll right inot the next logical piece, the completion
confirmation. This series will be much shorter than the service order, but no less important. This first piece is
typically the biggest piece to get in place… so let’s get to it.
Here’s where to find it in SPRO.
Once you select the option, you get the full list of service orders (and every other order type as well), by plant.
So this means that you can define your parameters by plant, by order type. I’ve picked one of the orders above
to show you what you have to choose from.
Now, the fun of this screen is that there is a lot going on within this single piece of configuration, so I’ll walk
you through each part of it.
Default Values:
Now, whenever you open up something like IW41 or IW42, there will always be a set of selections in here.
This gives you a first pass at anything you want defaulted. You get the following options:
Final Confirmation
Post Open Reservations – if you set final confirmation along with this, it sets the final issue for the
components that are not backflushed.
Propose dates – propose start and end dates based on the lead time scheduling.
Propose activities – this will calculate the amount of time left. If the total is 100, you’ve previous
confirmed 70, 30 units will be proposed.
Milestone automatic.- transfer the dates to the milestone automatically
Material Movements
All components – if you don’t check this, only shows backflushed components. If you check it, all
components will be shown.
Selection
By default, both of these are checked. If you don’t want confirmed operations, simple uncheck the box.
Checks
This area comprises the checks that should occur whenever you confirm an operation.
HR Update
No HR update – stops the automatic data availability to the HR module, like CATS for example.
no Date update – don’t update actual date in the operation.
Logs/Error handling
Control Data
Process Control – controls the execution of the confirmation. The out of the box option available is
Backflushing/automated goods issue
Mass Confirmation
Rough Reversal – means that the reversal doesn’t look at the individual confirmations in mass. You’d
only do this for performance reasons.
o Rough reversal frm counter stats – allows you to set a status for when it’s allowed
o simplified forecast work cancellation – for forecasting, forecast work will equal planned
work. (actual work if final confirmed)
execute milestone functions – this only applies to PS, so ignore this.
In general, most of the settings, except for the default rarely need to be touched. Regardless, this is the basis
for the settings of your service order confirmations.