Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Compro PPA 2023

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

C O M P A N Y

PROFILE
PT PUTRA PERKASA ABADI

www.ppa.co.id Putra Perkasa Abadi


pt.ppa.official PT Putra Perkasa Abadi 202
3
CEO SPEECH

2 Company Profile PT Putra Perkasa Abadi


PUTRA PERKASA ABADI (PPA), founded in 2002, is a mining contractor specializing in heavy
equipment rental, earthmoving & mining services provider. During our first years, we quickly learnt and
assimilated the corporate culture of our world-class customers & partners, and continue to strive for
excellence.

All of PPA’s customers are mining companies which operate efficiently and sustainably even
during low coal prices environment. PPA implements lean organization and best surface mining
practices, which translate into lower overhead costs.

PPA has acquired ISO 9001:2015 for quality management system, ISO 14000:2018 for
environmental management system, ISO 45001:2018 for occupational health and safety with gold
category and safety management system (SMK3 and SMKP). Through customer satisfaction and
earned trust, PPA shall continue to increase production in existing projects in the coming years.

Our mining clients recognize the advantages of employing PPA as their mining contractor,
allowing them to focus on mining exploration and marketing instead. In addition, our extensive
knowledge in local working conditions and legislation, whether negotiating with local residents
or government bodies, is a distinct advantage. This allows for smooth, efficient workflow that
ensures successful and timely completion of projects.

In the pages that follow, we share with you our mission and corporate culture, our strategic
vision and keen dynamism.

Yours Truly,
CHRISTIANTO SETYO
President Director
BOARD OF DIRECTOR
MARCHING FORWARD

Initially established as a heavy equipment rental


provider for Pama Persada. PPA believed that it could
better implement its profound understanding of fleet
management, fuel efficiency, and equipment productivity
for the nation’s coal industry if it were allowed to handle
coal mining activities, resulting in its decision to embark
on the coal mining contractor business in 2005. CHRISTIANTO SETYO ARDI TIRTA TJOA

Joined the Company as Joined the company in 2005,


Today, Putra Perkasa Abadi is the third biggest mineral shareholder in 2010, when the company started its
and served as the Vice first mining services project
and coal mining contractor in Indonesia with more than
President. at PT Kadya Caraka Mulya,
12.000 personnel, managing the operation of at least 11 He was appointed as South Kalimantan. He was
major mineral and coal mining companies throughout the President Director of appointed Director in 2008-
the Company in 2017. 2019, and now as appointed
nation and confident that its ‘customer delight’ principle
Vice President Director.
will respectfully put it to be the 2nd biggest mineral and
coal mining service company in Indonesia.

JOKO TRIRAHARJO SUJOKO MARTIN R TEGUH MUHAMMAD AFFAN


SAPTOSUBROTO
Joined the company in Appointed as an Has nearly 20 years
Joined company in 2009, he
2005, he has held various independent director experience in several
has held various positions in
positions in PPA, namely since 2018, he started advanced positions such
PPA, namely Deputy Project
Project Manager (2005- his career in the astra as supply chain, operation,
Manager (2009-2010),
2008), Operation group and had served and business development
Project Manager (2010-
Manager (2008-2011) for more than 18 years. in leading mining services.
2012), People & mining
and subsequently He previously served as He serves as Director in
Development Manager
appointed Director as finance director of PT PPA since 2021.
(2012-2016), General
well as shareholder of Bukit Makmur Mandiri
Manager (2016-2019), and
the company. Utama.
now as appointed Director.
VISION & MISSION

VISION
To become the second biggest mineral and coal mining service company
in Indonesia in 2023 that is diversified, operates safely, has minimal
environmental footprint, and delivers sustainable benefits for stakeholders.

MISSION
1. To provide added value services to customers by implementing proper
mining principles in an effort to address climate challenges, minimize
environmental impacts and take advantage of natural resources responsibly
2. Generate maximum economic added value to all shareholders and
stakeholders interests (all related parties)
3. To become a holding company in the field of mineral and coal mining
services that grows sustainably, high value, leading in mastery of technology,
digitization, and innovation
4. Building the character and competence of human resources as equal and
inclusive partners in accordance with with the Company's core values
5. Empowering communities based on potential, adhering to the values ​​and
traditions in which we operate
6. Strengthening integrity, compliance, and implementation of standards on an
ongoing basis in line with creation of benefits for all stakeholders

6 Company Profile PT Putra Perkasa Abadi


1
CORE VALUES
DEVOTION
DEVOTION TO GOD ALMIGHTY TO GOD
ALMIGHTY
To believe in God Almighty in accordance with each
6 2
of our respective religions and beliefs, evident by
WORK
carrying out all his commandments and staying PERFECTION INTEGRITY
away from all his prohibitions
CORE
INTEGRITY VALUES
To be honest and committed towards our customers
and shareholders in carrying out our duties, as well SPIRIT
TO TEAMWORK
as motivating our surrounding WIN
5 3
TEAMWORK
CREATIVITY
Able to work together, trust each other, valuing the
opinions of others and able to find win-win solutions
for our problems, resolving them with good
4
teamwork and the support of each other to attain
optimal results

CREATIVITY
Able to encourage new ideas, facilitate external COMMITMENT
comparisons and find better ways to do the work
• To conform with the law of
SPIRIT TO WIN Republic Indonesia.
Able to develop a learning culture, proactive, never • To comply strictly with
give up attitude as well as committed to meet the international mining safety
expected results in completing the tasks, aiming for & environmental standards.
optimal results • To create jobs & other
intrinsic development for
WORK PERFECTION the local community.
Able to work properly, be globally competitive, in line • To observe the shared
with the K3PLM program, have a sense of pride and values and traditions of the
high enthusiasm, excellent communication skills, local residents where we
discipline and able to be role models in completing operate.
tasks with optimal results.
COMPANY
MILESTONES
PROFIT SAFETY
WE ARE SHARING FIRST
STARTING Introducing profit Acquired Zero Accident
PPA was established as a sharing policy, where Award for consecutive 3
heavy equipment rental. employees become million work hours without
company stockholders, accident in Kaltim Jaya Bara.
giving them sense of
ownership and solidarity.

2002 2005 2008 2014 2017


BIG
FIRST MINING CONTRACT
CONTRACT Acquiring high value
contract from a mining
Acquired first working company with Coal
contract as mining Contract of Work from
services provider, shifts its the government, PT
core business from rental Borneo Indobara.
to mining contractor.
PUTRA PERKASA ABADI, founded in 2002, started as
a mining contractor specializing in heavy equipment
rental, earthmoving & mining services. During our
first years, we quickly learnt and assimilated the
corporate culture of our world-class customers &
partners, and continue to strive for excellence.

NICKEL ORE THE CHAMP STRIVE FOR


+100
Continues to grow, Safety is priority
PPA is awarded its first at PPA, and our EXCELLENCE
contract outside the coal Emergency Response Putra Perkasa Abadi aims to
MILLION BCM industry, by acquired a Team proved their be the nation’s 2nd biggest
nickel ore mining contract worth by winning the mineral & coal mining
Achieved the from PT Makmur Lestari overall championship
milestone of more service company.
Primatama in Sulawesi. at the 7th IFRC 2021.
than 100 million BCM
OverBurden Removal.

2018 2019 2021 2022 NEXT


SYSTEM NEW
MANAGEMENT CONTRACT
Marked first major system PPA acquiring four
overhaul and consolidation, high value contract
including for man power from PT Bukit asam,
development process, the Adaro Group &
addition of SAP human Halmahera Sukses
capital management and Mineral.
SAP success factor.
OUR PHILOSOPHY
Specializing in heavy equipment rental and
mining services for more than a decade and
growing, PPA is marching forward with its
excellent level of services in Overburden
Removal, mineral and Coal Mining, Hauling
Road Maintenance and Coal Crushing Plant.

PPA is also committed to provide excellence


through not just close partnership with client
companies, but also with the embedded
application of internal principle of Safe and
Strong, where it take pride in always providing
additional ten percent capacity ready for
dispatch beyond the 100 percent of customers’
demand. The result is Customers’ Delight,
one step ahead of Customer’s Satisfaction, it
is driven with the simple principle of working
together to not just meet its customers’ target,
but also one step further in all aspects.
PRODUCT & SERVICE

OUR As one of the largest coal and


mineral mining contractors in
SERVICES Indonesia, PPA has extensive
competence and in-depth
understanding in terms of mining
developments and operations
which covers:

COAL & MINERAL


MINING

OVER BURDEN COAL / ORE


REMOVAL HAULING & ROAD
MAINTENANCE

PORT
MANAGEMENT
OVER BURDEN COAL & MINERAL
REMOVAL MINING
Overburden removal is a primary activity Coal / Ore getting is the core activity
in open-pit mining system, which normally in mining operation, which is the
determined by coal production target continuation of overburden removal.
in the production plan. It also follows a After the topsoil and subsoil layers are
certain ratio according to mine design, successfully removed, the product to
in which the Client will optimize various be mined are identified and cleaned
aspects such as reserve, sequence, costs accordingly, and then extracted using
and efficiency. PPA’s main services in truck and shovel to be sent to the
Overburden removal includes survey stockpile.
activities, land clearing, top soil removal,
drilling and blasting, overburden removal
and disposal management.

PORT MANAGEMENT COAL / ORE HAULING &


PPA has experience operating coal
ROAD MAINTENANCE
crushing plant (CCP), barge loading
In many areas, coal is commonly
conveyor (BLC), and other supporting
transported from the mine to the
services in port management such as to
stockpiling location using either conveyor
coal handling and stockpiling at run-of-
or trucks. PPA specialize transporting coal
mine (ROM) as well as riverside load port.
and other minerals using 20 ton, 30 ton
trucks even 100 ton off-highway dump
trucks via hauling road. PPA also provides
Hauling Road Maintenance services,
which includes grading, water spraying
and compacting.
PROJECTS

PROJECTS

Among the existing coal mining contractors operating in Indonesia, PPA 12.325
HIGHLY DEDICATED
is one of the fastest growing company with higher rate of expansion EMPLOYEES
in terms of employees, heavy equipment units as well as overburden
removal. PPA delivers more than excellent capabilities in all operating
sectors, at the same time ensuring its relationships with local government 2.087
and surrounding communities to sustain its efficient operation. This, in UNITS OF HEAVY
turns, allows PPA’s respective clients to not be bothered by coal mining EQUIPMENT IN
production target and able to focus on sales instead. OPERATION

COAL PRODUCTION OVERBURDEN PRODUCTION


IN MILLION TON IN MILLION BCM
46.45 2022* 282
36.14 2021* 173.7
39.50 2020* 145.5
41.93 2019* 191.4
22.32 2018 139.6
13.63 2017 88.8
7.64 2016 38.1
5.31 2015 27.5
3.03 2014 15.2
6.13 2013 27.8
4.04 2012 22
3.15 2011 16.1
2.01 2010 6.5
* PPA group production
2087

1954
HEAVY 1200
EQUIPMENT 1025
908
691
89 186 401

2014 2015 2016 2017 2018 2019 2020 2021 2022


2023 Projects
*
*

Heavy Equipment Heavy Equipment Heavy Equipment Heavy Equipment Heavy Equipment
Deployed: 565 Units Deployed: 483 Units Deployed: 305 Units Deployed: 108 Units Deployed: 81 Units

Production: Production: Production: Production: Production**:


• 108,6 Million BCM OB • 81,4 Million BCM OB • 35,8 Million BCM OB • 26,1 Million BCM OB • 6 Million BCM OB
• 30,9 Million Ton Coal • 6,2 Million Ton Coal • 3,1 Million Ton Coal • 1,2 Million Ton Coal • 1,8 Million Ton Coal

MLP

Heavy Equipment Heavy Equipment Heavy Equipment Heavy Equipment


Deployed: 87 Units Deployed: 58 Units Deployed: 101 Units Deployed: 186 Units

Production**: Production: Production**: Production:


• 8,6 Million BCM OB • 5,9 Million BCM OB • 1,1 Million BCM OB • 6,6 Million BCM OB
* 2022 Production
• 1,9 Million Ton Coal • 0,9 Million Ton Coal • 0,4 Million Ton Nickel Ore • 3,8 Million Ton Nickel Ore *Adaro Mineral & KPC New Project 2023
** Q3 2022 Start of Production
SUSTAINABLE DEVELOPMENT

SAFETY FIRST PPA PROFESSIONAL


CERTIFICATION AGENCY
PPA’s outstanding performance cannot be separated
from how serious the company deals with safety. The PPA Professional Certification Agency (LSP)
While it continuously deploys its expertise in
was established as a form of the management’s
meeting its client’s production target, PPA places
commitment to further elevate the capacity of its
high emphasis on the quality of its manpower,
human resources, mainly focusing on operators
consequently affecting their attitude towards safety.
and mechanics in coal mining activities. Backed
This is proven with the awarding of three certificates
up by 48 expert assessors, 5 partners and 23
of appreciation from the Minister of Employment
quality auditors, the agency is also licensed by the
of the Republic of Indonesia, with gold certification
National Professional Certification Agency (BNSP)
for three different mines consistently between 2016
to provide certifications in six subject matters,
and 2019. PPA continues to improve the quality of
namely Large Excavator Maintenance Periodic
our own in-house emergency response team (ERT),
Clusters, Periodic Maintenance of Light Dump
and subsequently achieved as overall winner at the
Truck and Heavy Dump Truck, Operation of Light
Kalimantan Fire Rescue Challenge 2020, and finally
Dump Truck and Heavy Dump Truck, as well as
becoming the overall champion at the 7th Indonesia
Excavator Operation and Material Loading.
Fire and Rescue Competition (IFRC) in 2021. This is
only few of highlights of PPA’s continued commitment
for occupational safety and health management
system.
CORPORATE SOCIAL
PPA ACADEMY RESPONSIBILITY
Independently, PPA has established an education- Although PPA’s nature business as a coal mining
focused CSR program called PPA Academy, a body contractor does not oblige it to focus on territorial
which tasked with enriching local youth’s education. based CSR, the company remains vigil in its effort to
Although open for public, the academy annually help relieving the life of those living in its surrounding
provides high quality education to at least 350 students area, through social activities such as the providing of
from the Tier 1 areas, areas located around PPA’s basic needs for less fortunate families residing within
operation sites, with the rest of the 800 seats occupied its operation areas, free school equipment for local
by a few select students from all over Indonesia. PPA schools, work training for those in rural areas, as well
Academy graduate also ensured a well paid position as sharing responsibility with its client companies to
within the company. support their CSR programs related to land reclamation
and local community development programs.

16 Company Profile PT Putra Perkasa Abadi


SUBSIDIARY
COMPANY
AMM In addition to better manage the distribution of labors, PPA established PT. Antareja
Mahada Makmur (AMM), at the end of 2017, as an effort to support the welfare of
PPA’s employees, as they are listed as AMM’s stakeholders.

As it stands, AMM remains strong in providing support for PPA’s key business, while
at the same time giving additional values for its stakeholders, providing emotional
motivation to do their best, raising ownership awareness, and naturally building
loyalty. It also provides additional services such as Road Constructions and Pit Service.

4.032 SERVICES
HIGHLY DEDICATED
EMPLOYEES
• OVER BURDEN REMOVAL
• COAL HAULING

726 •

HAULING ROAD MAINTENANCE
ROAD CONTRUCTION
UNITS OF HEAVY
EQUIPMENT IN
• PIT SERVICE
OPERATION • RENTAL EQUIPMENT
GALLERY
Office 8 Building, 8th Floor
SCBD Lot 28 / Senopati Raya 8B
Jl. Jend. Sudirman Kav 52-53, Jakarta 12190, Indonesia
Telp: 021 5790 3456 / 57, email: corcom@ppa.co.id
www.ppa.co.id pt.ppa.official

You might also like