HALFAYA PROJECT SURFACE FACILITY

PHASE FOUR
CPF1&CPF2
PAGE 1 OF
DETAIL DESIGN DOC.NO.: HFY4-5070-01-VED-001-ELE-DWG-6001 REV.: 0
3

HFY-CON/F&C0992-1015

EPCC For Power Supply For ESP Around CPF1 & CPF2

RTU System Diagram


PetroChina Halfaya

Approval Code 0 Remarks


Here

Code A Approved.

Revise & resubmit. Work may proceed subject


Code B to the incorporation of changes indicated.

Rejected. To be revised & resubmitted.


Codec
Work may not proceed.

Code D Reference and information only.

Adam Malik
28.12.2020
Approval Authority Signature Date

Any comments made do not relieve the contractor/ vendor and/ or their
sub-<:ontractors of their responsibilities to meet the requirements of the
Contract.

0 Issued for Construction 22.12.2020 Yousif Hashim Hassan Ahmad Siddig Margani Babiker

REV. DESCRIPTION DATE PREP’D CHK’D REV’D APP’D


Halfaya project
Provision of (EPCC ) for power supply to
the well pads around CPF1 , CPF2 in 2019

DETAIL DESIGN DOC. NO.: HFY4-5070-01-VED-001-ELE-DWG-6001 REV.: 0 PAGE 1 OF 2

HFY-CON/F&C0992-1015

EPCC for Power Supply for ESP around CPF1 & CPF2

RTU System Diagram

Halfaya project- Provision of (EPCC ) for power


supply to the well pads around CPF1 , CPF2 in 2019


A APPROVED AND SIGNED B PROCEED. REVISE AS NOTED
AND RESUBMIT
DO NOT PROCEED. REVISE
C AS NOTED AND RESUBMIT D DATA ACCEPTED. FOR
INFORMATION ONLY

Note: Authorization on proceed does not relieve VENDOR of their


responsibility or liability under the CONTRACT

Elec:…………… Civ&Str:……… Tel:………… Inst:………

BY:………………… DATE:………………

0 ISSUED FOR APPROVAL 12.18.2020 Deng Xin Bill Wang Xu pengbo James Wang