INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 3 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
PTS-19WN322, Appendix-XXII B
SEC-B HVAC Control System
Supply of HVAC control system by a company specializing in HVAC controls
1 Comply
is acceptable instead of from PACU manufacturer.
2 Controls shall be D.D.C. (Direct Digital Controls) type. Comply
Interlock controls shall be provided with SCADA / ECC to remotely monitor
3 Comply
status of the air conditioning units, modification of set points & parameters.
Interlock controls shall be provided to receive an input signal from FPSP to
shut down the air conditioning unit in case of smoke / fire detection and also
4 Comply
to close the motorized fire / smoke dampers associated with the operation of
the Clean Agent Fire Suppression System.
5 The Air conditioning units shall not trip up on manual checking of alarm. Comply
HVAC Control Schematic Diagram shall be as per attached tender drawing
6 Comply
WT-922658 sheet 01 to 06
HVAC Alarms Logic Diagram shall be as per attached tender drawing WT-
7 Comply
922659 sheet 01 of 01
Control wiring diagram shall be submitted for review and approval; prior to
8 Comply
fabrication by control specialist
HVAC panel shall be equipped with a 7-day / 24-hour timer switch to
alternate the operation of the duty and standby units. An automatic transfer
9 Comply
switch, with an adjustable time delay, 0 - 300 seconds (5 minutes), shall be
provided to start the standby unit in case the duty unit trips or fails to start.
Page 4 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 5 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 7 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 8 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 9 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 10 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 12 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 14 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 15 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 17 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Page 18 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
The finish of all ferrules shall be such that the color does not change
c. considerably with age and they shall be resistant to the accumulation of COMPLY
dust.
Page 20 of 21
INSTALLATION OF STATCOM AT SHARORAH (SHR) 380/132KV BSP
Each panel shall bear a nameplate of stainless steel, fastened to the panel by
stainless steel screws, rivets or solidly fixed. The nameplates shall be
permanently and legibly marked in English with the following information:
a. Manufacturer’s name or trademark
4.9.1 COMPLY
b. Year and place of manufacture
c. Panel Type Designation or Identification reference
d. Purchase Order No. or Contract No. or J.O. No.
e. Latest revision of 31-TMSS-01
Page 21 of 21