ENG’G

SUBSECTION INDEX

Part 1 - General
DESCRIPTION

1.01 Description
1.02 Related Work
1.03 Quality Assurance
1.04 Reference Standards
1.05 Submittals

Part 2 - Products
DATE JOB/EWO

2.01 Joint Compounds


2.02 Bond Breaker for Joint Compounds
2.03 Pre-molded Joint Filler
REV.
NO.

Part 3 - Execution
DISCIPLINE
ENGINEER 3.01 Construction Joints
__ ________ _
3.02 Expansion Joints
 DATE: ________ 3.03 Contraction Joints 
PROJECT 3.04 Isolation Joints in Slabs on Ground
ENGINEER
3.05 Pre-molded Joint Filler
____________
DATE ______ 3.06 Joint Compound
CERTIFIED
PART 1 - GENERAL
_ __________
DATE: ________
1.01 Description
CONSTRUCTION
AGENCY
________________
A. Work in this Section includes, but is not limited to; furnishing and
DATE: _________ placing construction joints and expansion joints as indicated on the
OPERATIONS Drawings and as specified.
______________
DATE:_________ 1.02 Related Work
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

A. Section 03300 - Cast-in-Place Concrete


EDSD

B. Section 01352 – LEED Requirements


Date:
By:

1.03 Quality Assurance


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

A. General:
REVISION CERTIFICATION

1. Construction and expansion joints shown on Drawings


shall not be omitted.
Section 03251

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 1
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 6
15-May-10 
Saudi Aramco 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

2. Construction and expansion joints shall not be added or


CERT

relocated without written approval of Saudi Aramco.


ENG’G

3. Comply with the provisions of the references indicated


under Sub-section 1.04 "Reference Standards", except as
otherwise shown or specified.

1.04 Reference Standards


DESCRIPTION

A. American Concrete Institute (ACI):

1. ACI-504-R-90, Guide to Joint Sealants for Concrete


Structures.

B. American Society for Testing and Materials (ASTM):


DATE JOB/EWO

1. ASTM C 920, Specification for Elastomeric Joint Sealants.

2. ASTM C 1193, Guide for Use of Joint Sealants.


REV.
NO.

3. ASTM D 1751, Specification for Preformed Expansion


Joint Filler for Concrete Paving and Structural Construction
DISCIPLINE
ENGINEER (Non-extruding and Resilient Bituminous types).
__ ________ _
 DATE: ________ 1.05 Submittals 
PROJECT
ENGINEER
A. Submit the following to the Saudi Aramco Representative for
____________
DATE ______ approval prior to ordering of materials:
CERTIFIED
1. Product data for all materials stating the location where
_ __________ product to be used.
DATE: ________

CONSTRUCTION
AGENCY
2. Certification that materials meet the Specifications.
________________
DATE: _________ 3. Manufacturer's application and installation instructions.
OPERATIONS

______________ 4. Samples of joint fillers and sealants.


DATE:_________

5. Color samples or charts for joint compounds for selection.


APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

B. Product Data for Credit EQ 4.1: For sealants and sealant


primers used inside the weatherproofing system, including
Date:
By:

printed statement of VOC content.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________


REVISION CERTIFICATION

PART 2 - PRODUCTS
Section 03251

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 2
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 6
15-May-10 
Saudi Aramco 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

2.01 Joint Compounds


CERT

A. General: Compounds abutting each other are to be compatible.


ENG’G

B. Horizontal Joints: Joint compound for joints in horizontal or nearly


horizontal surfaces conform to ASTM C 920, Type S or M, Grade
P, Class 25. Use T (traffic sealant) in pedestrian and vehicular
traffic areas, and Use NT (non-traffic) sealant in non-vehicular
areas.
DESCRIPTION

C. Wall Joints: Joint compound for joints in walls conform to ASTM C


920, Type S or M, Grade NS, Class 25.

2.02 Bond Breaker For Joint Compounds

A. Polyethylene tape, coated paper, metal foil or similar type


materials.
DATE JOB/EWO

2.03 Pre-molded Joint Filler

A. Shall comply with requirements of ASTM D 1751.


REV.
NO.

B. Furnish joint filler with thickness equivalent to joint width indicated


DISCIPLINE
ENGINEER and of suitable length and width.
__ ________ _
 DATE: ________ C. Furnish sheets of correct width, as far as practicable, so no 
PROJECT longitudinal field cutting will be required.
ENGINEER
____________
DATE ______

CERTIFIED
2.04 VOC Content of Interior Sealants: Provide sealants and sealant primers for
use inside the weatherproofing system that comply with the following limits for
_ __________ VOC content when calculated according to 40 CFR 59, Subpart D (EPA
DATE: ________
Method 24):
CONSTRUCTION A. Architectural Sealants: Not more than 250 g/L.
AGENCY
B. Nonmembrane Roof Sealants: 300 g/L.
________________
DATE: _________ C. Single-Ply Roof Membrane Sealants: 450 g/L.
OPERATIONS D. Sealant Primers for Nonporous Substrates: Not more than 250
______________
g/L.
DATE:_________ E. Sealant Primers for Porous Substrates: Not more than 775 g/L.
F. Modified Bituminous Sealant Primers: 500 g/L.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

PART 3 - EXECUTION
Date:
By:

3.01 Construction Joints


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

A. General: Locate and install construction joints, which are not


REVISION CERTIFICATION

shown on the Drawings, so as not to impair strength and


Section 03251

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 3
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 6
15-May-10 
Saudi Aramco 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

appearance of the structure, as acceptable to the Saudi Aramco


Representative.
CERT

B. Provide keyways at least 38 mm deep in all construction joints.


ENG’G

Place construction joints perpendicular to the main reinforcement.


Continue all reinforcement across construction joints.

C. Forms: Use slightly tapered key groove forms to permit form


removal without damage to groove after concrete is cured.
DESCRIPTION

D. Concrete Placement: Consolidate concrete during placement in


vicinity of key and key groove. Do not remove key or key groove
forms until after concrete has cured.

E. Concrete Cleaning and Protection: Clean key or key groove of


laitance, curing compound, foreign materials, protrusions of
hardened concrete and blow out debris and dust with oil-free
DATE JOB/EWO

compressed air. Protect exposed key and key groove from


damage.
REV.
NO.

3.02 Expansion Joints


DISCIPLINE
ENGINEER

__ ________ _
A. General: Provide expansion joints as indicated on Drawings.
 DATE: ________ 
PROJECT B. Sidewalk and Curb:
ENGINEER
____________
DATE ______ 1. Provide 10 mm thick expansion joints as shown on
CERTIFIED
Drawings, between sidewalks and curb and gutter and
around all structures in sidewalks. In addition, expansion
_ __________ joints shall be provided at not more than 6.0 m maximum
DATE: ________
intervals in curbs, gutters, and valley gutters. Sidewalk
CONSTRUCTION
AGENCY
shall be as detailed.
________________
DATE: _________ 2. Install the joint filler strips vertically and to the full depth
OPERATIONS and width of the concrete being placed. Place strips
______________ perpendicular to straight curb or sidewalks and radially to
DATE:_________
the line of curb or sidewalks on a curve and to the top of
any surface of the concrete. Trim off excess filler strip in a
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

neat manner. Before placing and vibrating the concrete,


EDSD

fix the filler strip rigidly and securely in the proper position.
Date:
By:

3.03 Contraction Joints


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

A. General: Make 3 mm deep weakened plane joints straight and


constructed in accordance with the following, unless shown
REVISION CERTIFICATION

otherwise in the Drawings.


Section 03251

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 4
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 6
15-May-10 
Saudi Aramco 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

1. Sidewalks: Joints transverse to the line of work and at


regular intervals not exceeding 1.5 m apart, with joints
CERT

radial to the line of work on curves. The surface of the


sidewalk shall contain score lines at intervals not
ENG’G

exceeding 0.75 m and of a minimum depth of 3 mm.


Score lines shall be parallel to, or concentric with the lines
of work. Sidewalks two meters or more in width shall have
a longitudinal center scoring line. All work shall be done
with a steel scoring trowel. Match the longitudinal and
DESCRIPTION

transverse scoring lines with the adjacent sidewalks.

2. Curb: Joints at regular intervals not exceeding 1.5 m.


After preliminary trowelling, part the concrete to a depth of
4 cm with a straight edge to create a division in the course
aggregate. Refloat the concrete to fill the parted joint with
mortar. Make the division in order to locate the weakened
plane for final joint finishing with a jointer tool having a
DATE JOB/EWO

depth of 3 cm and a radius of 3 cm. Finished joint is not to


be wider than 3 mm.
REV.
NO.

3.04 Isolation Joints in Slabs on Grade


DISCIPLINE
ENGINEER

__ ________ _
A. Provide isolation joints in foundation slab on grade as indicated.
 DATE: ________ 
PROJECT 3.05 Pre-molded Joint Filler
ENGINEER
____________
DATE ______ A. General: Treat cut surface as recommended by manufacturer,
CERTIFIED
when filler strips are cut.

_ __________ B. Placement:
DATE: ________

CONSTRUCTION
AGENCY
1. Place filler against the bulkhead form and fasten to the
________________
inside of the form with non-corrodible fasteners.
DATE: _________

OPERATIONS 2. Prevent disturbance of or damage to joint filler.


______________
DATE:_________ 3. Fill expansion joint completely.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

C. Wood Strips and Placement:


EDSD

1. Secure wood strips to surfaces which are to receive joint


Date:
By:

compound.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

2. Use slightly tapered wood strips of the same width as the


expansion joint and of the depth necessary to install the
REVISION CERTIFICATION

joint compound.
Section 03251

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 5
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 6
15-May-10 
Saudi Aramco 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

3. Use materials to secure joint filler and wood strips which


will not harm concrete or affect the joint compound bond to
CERT

concrete.
ENG’G

4. Do not remove wood strips until after the concrete curing


period.

D. Cleaning and Protection: Clean groove of laitance, curing


compound, foreign materials, protrusions of hardened concrete,
DESCRIPTION

blow out dust with oil-free compressed air.

3.06 Joint Compound

A. General: Clean and dry concrete to be sealed in accordance with


manufacturer's printed instruction.

B. Compound Placement:
DATE JOB/EWO

1. Prime concrete, fill flush with joint compound of required


thickness, tool to concave joint and seal, if required, all in
accordance with the manufacturer's instructions, and
REV.
NO.

ASTM C1193.
DISCIPLINE
ENGINEER 2. Prevent spilling compound over adjoining surfaces. Use
__ ________ _
tape adjacent to joint if required. Remove all tape
 DATE: ________ completely from concrete surface. 
PROJECT
ENGINEER
3. Do not seal when compound, air, or concrete temperature
____________
DATE ______ is less than 4.5 degrees C (40 degrees F).
CERTIFIED
END OF SECTION
_ __________
DATE: ________

CONSTRUCTION
AGENCY
________________
DATE: _________

OPERATIONS

______________
DATE:_________
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

Date:
By:
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________


REVISION CERTIFICATION

Section 03251

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 6
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 6
15-May-10 

You might also like