SECTION 08100
CERT
METAL DOORS
ENG’G
PART 1 - GENERAL
A. Non-rated and fire rated thermally insulated steel doors and panels.
C. Louvers.
__ ________ _
D. Section 09900 Painting
DATE: ________
PROJECT E. Section 01352 LEED Requirements
ENGINEER
____________
DATE ______ F. Section 01524 – Construction Waste Management
CERTIFIED
CONSTRUCTION
AGENCY
A. SSD - 7 Security and Emergency Exit Doors.
________________
SSD - 8 Min. standard for locks used on security doors.
DATE: _________
a Guarded Hot-Box.
OF THIS DRAWING IS COVERED, FOR ALL
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
N. Green Seal Standard GS-11 – for Commercial Flat and Non-flat Paints
DISCIPLINE
ENGINEER
__ ________ _
O. Green Seal Standard GC-03 – for Anti-corrosive and Anti-rust Paints.
DATE: ________
PROJECT P. South Coast Air Quality Management District (SCAQMD) Rule 1113 –
ENGINEER
Architectural Coatings.
____________
DATE ______
CERTIFIED
1.04 SUBMITTALS
CONSTRUCTION
AGENCY
B. Shop Drawings: Indicate door elevations, internal reinforcement,
________________
closure method, and cut-outs for glazing and louvers and finish.
DATE: _________
instructions.
OF THIS DRAWING IS COVERED, FOR ALL
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
H. A tabulation of each material used on the project that is being tracked for
CERT
2. Material manufacturer
3. Product cost
4. Pre-consumer and/or post-consumer recycled content percentage,
5. Source of the recycled content data.
DESCRIPTION
I. A tabulation of each material used on the project that is being tracked for
regional content. The following information to be included:
1. Product name for each tracked material;
2. Material manufacturer;
3. Total product cost for each tracked material;
4. Percentage of product, by weight, that meets both the extraction
and manufacture criteria;
5. Distance between the project site and extraction/harvest/recovery
DATE JOB/EWO
site;
6. Distance between the project site and the final manufacturing
location.
REV.
NO.
CERTIFIED K. Provide a listing of each indoor paint and coating used on the project.
Include the following information:
_ __________ 1. Manufacturer’s name,
DATE: ________
2. Product name,
CONSTRUCTION
AGENCY
3. Specific VOC data (in g/L, less water) for each product,
________________
4. Corresponding allowable VOC from the referenced standard.
DATE: _________
OPERATIONS
______________ M. Product Data for Credit EQ 4.1: For adhesives and sealants used inside
DATE:_________
of the weatherproofing system, including printed statement of VOC
content.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
1.06 QUALIFICATIONS
REVISION CERTIFICATION
SECTION 08100
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
experience.
ENG’G
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
B. Core: Polyurethane.
B. Core: Polyurethane.
DATE JOB/EWO
D. Frames to be covering wall thickness and shall not be less than 115mm
x 75mm x 10mm mild steel angles.
DISCIPLINE
ENGINEER
__ ________ _
E. Frames to be secured to the jambs with four 230mm flanged building-in
DATE: ________ lugs welded to each side of the frame. The frame to be properly
PROJECT grouted after fixing.
ENGINEER
____________
DATE ______ F. The hinges to be continuously welded to the door frame and the door
CERTIFIED
and their construction to be such as to prevent removal of the hinge
pins.
_ __________
DATE: ________
G. On an outward opening single leaf door any clearance between the
CONSTRUCTION
AGENCY
locking stile and the door frame to be covered by an external mild steel
________________
plate 150mm x 230mm x 10mm positioned to cover the lock bolt in the
DATE: _________ thrown position.
OPERATIONS
______________ H. On double leaf unrebated doors external and internal covering strips
DATE:_________
extending the full length of the meeting stiles are to be fitted.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
K. All security doors are to be fitted with a stout hasp and staple of the
OF THIS DRAWING IS COVERED, FOR ALL
REVOBAR type.
REVISION CERTIFICATION
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
Where required by the drawings, doors are to be ready for installation the
required type of glass and/or louvers including the steel glazing frames and/or
steel framed louvers.
__ ________ _
C. Attach fire rated label to each door unit as applicable.
DATE: ________
PROJECT D. Close top and bottom edge of exterior doors with flush end closure.
ENGINEER
Seal joints watertight.
____________
DATE ______
CERTIFIED
E. Configure exterior doors with profile to receive weather-stripping.
CONSTRUCTION
AGENCY
After fabrication provide doors thoroughly cleaned and sprayed (to assure
________________
proper adhesion) and sprayed with a coat of Zinc Chromate primer. Finish
DATE: _________ paint to be applied at the building site after installation.
OPERATIONS
Provide doors with fire ratings in accordance with the door schedule shown on
drawings.
Date:
By:
Fire doors shall have permanent fire labels attached by the manufacturer.
OF THIS DRAWING IS COVERED, FOR ALL
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
PART 3 - EXECUTION
3.01 EXAMINATION
DESCRIPTION
A. Use materials with recycled content such that the sum of post-consumer
Date:
By:
the project.
REVISION CERTIFICATION
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
for a total of at least 20%, based on cost, of the total materials value.
ENG’G
All adhesives and sealants used on the interior of the building (defined as inside
of the weatherproofing system and applied on-site) shall comply with the
DESCRIPTION
Paints and coatings used on the interior of the building (defined as inside of the
weatherproofing system and applied on-site) shall comply with the following
REV.
NO.
criteria:
DISCIPLINE
ENGINEER A. Architectural paints, coatings and primers applied to interior walls and
__ ________ _
ceilings: Do not exceed the VOC content limits established in Green Seal
DATE: ________ Standard GS-11, Paints, First Edition, May 20, 1993.
PROJECT – Flats: 50 g/L
ENGINEER
– Non-Flats: 150 g/L
____________
DATE ______
– Sealers: waterproofing sealers 250 g/L; sanding sealers 275 g/L; all
EDSD
END OF SECTION