Saudi Aramco Oil Company: SECTION 05520 Handrails Railings & Bollard Part 1 General
Saudi Aramco Oil Company: SECTION 05520 Handrails Railings & Bollard Part 1 General
Saudi Aramco Oil Company: SECTION 05520 Handrails Railings & Bollard Part 1 General
OPERNS.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
SECTION 05520
HANDRAILS RAILINGS & BOLLARD
CERT
PART 1 GENERAL
ENG’G
A. Interior and exterior handrails, balustrades and railings including but not
limited to the following:-
DESCRIPTION
1. Disabled Fittings.
3. Balustrades as shown.
__ ________ _
C. Section 08415 Interior Glass Wall Systems.
DATE: ________
PROJECT D. Section 08800 Glass and Glazing.
ENGINEER
____________
DATE ______ E. Section 09900 Paints and Coatings: Paint finish.
CERTIFIED
F. Section 01352 LEED Requirements
_ __________
DATE: ________
G. Section 01524 Construction Waste Management
CONSTRUCTION
AGENCY
________________
DATE: _________
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
Process.
DISCIPLINE
ENGINEER 10. ASTM E 935 Test Methods for Performance of
__ ________ _
Permanent Metal Railing Systems and Rails for
DATE: ________ Buildings.
PROJECT
ENGINEER
11. ASTM E 985 Permanent Metal Railing Systems and
____________
DATE ______ Rails for Buildings.
CERTIFIED
D. The Society for Protective Coatings (SSPC):
_ __________
DATE: ________
1. SSPC Steel Structures Painting Manual.
CONSTRUCTION
AGENCY
________________
2. SSPC Paint 20 Zinc – Rich Primers (Type I – Inorganic
DATE: _________ and Type II – Organic).
OPERATIONS
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
1.06 SUBMITTALS
DATE JOB/EWO
Date:
3. Product Data for Credit MR 5.2: For products regionally (500 miles or
By:
point of raw material extraction and distance from the project site; and
REVISION CERTIFICATION
SECTION 05520
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
1.08 MOCKUP
PART 2 PRODUCTS
DISCIPLINE
ENGINEER
__ ________ _
2.01 MANUFACTURERS
DATE: ________
PROJECT A. Available Manufacturers: Subject to compliance with requirements,
ENGINEER
manufacturers offering products that may be incorporated into the Work
____________
DATE ______ include, but are not limited to, the following:
CERTIFIED
1. Aluminum Pipe and Tube Railings:
_ __________
DATE: ________
Alumaguard or approved and equal under Project
CONSTRUCTION
AGENCY
Manufacturers List..
________________
Aluminum Tube Railings, Inc. or approved and equal
DATE: _________ under Project Manufacturers List.
OPERATIONS
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
Manufacturers List.
Stainless Fabricators, Inc. or approved and equal under
Project Manufacturers List.
Substitution: Under provisions of Section 01630.
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
steel.
ENG’G
stainless steel.
DISCIPLINE
ENGINEER N. Bollard: 100 mm diameter epoxy coated steel.
__ ________ _
DATE: ________ O. Fixings: To manufacturer's detail, polished stainless steel covering where
PROJECT exposed.
ENGINEER
____________
DATE ______ P. Bridge railing components: As per design submitted and approved by the
CERTIFIED
Engineer.
CONSTRUCTION
AGENCY
A. Fit and shop assemble components in largest practical sizes for delivery
________________
to site.
DATE: _________
OPERATIONS B. Fabricate components with joints tightly fitted and secured. Provide
______________ spigots and sleeves to accommodate site assembly and installation.
DATE:_________
structure.
EDSD
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
intrusion.
H. Grind exposed joints flush and smooth with adjacent finish surface. Make
exposed joints butt tight, flush, and hairline. Ease exposed edges to
small uniform radius.
I. Accurately form components to suit stairs and landings, to each other and
to building structure.
K. Use factory formed bends and elbows free from necking and distortions.
REV.
NO.
2.04 FINISHES
DISCIPLINE
ENGINEER A. GENERAL
__ ________ _
DATE: ________ 1. Comply with NAAMM's "Metal Finishes Manual for Architectural
PROJECT and Metal Products" for recommendations for applying and
ENGINEER
designating finishes.
____________
DATE ______
CERTIFIED
2. Protect mechanical finishes on exposed surfaces from damage
by applying a strippable, temporary protective covering before
_ __________ shipping.
DATE: ________
3. All paintings and Coatings shall be compliant with the VOC limits
CONSTRUCTION
AGENCY
as establhished on Section 01352 – LEED Requirements.
________________
DATE: _________ B. ALUMINUM FINISHES
OPERATIONS
______________
DATE:_________ 1. Finish designations prefixed by AA comply with system
established by the Aluminum Association for designating
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
aluminum finishes.
EDSD
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
C. STAINLESS-STEEL FINISHES
1. Remove or blend tool and die marks and stretch lines into finish.
2. Grind and polish surfaces to produce uniform, directionally
DATE JOB/EWO
__ ________ _
D. STEEL FINISHES
DATE: ________
PROJECT 1. Galvanized Handrails and Railings: Hot-dip galvanize steel and
ENGINEER
iron handrails and railings to comply with ASTM A 123. Hot-dip
____________
DATE ______ galvanize hardware for exterior steel and iron handrails and
CERTIFIED railings to comply with ASTM A 153/A 153M.
2. Galvanizing: Hot-dip galvanize items as indicated to comply
_ __________ with applicable standard listed below:
DATE: ________
CONSTRUCTION
AGENCY
a. ASTM A 123, for galvanizing steel and iron products.
________________
b. ASTM A 153/A 153M, for galvanizing steel and iron
DATE: _________ hardware.
OPERATIONS
______________ 3. Fill vent and drain holes that will be exposed in finished Work,
DATE:_________
unless indicated to remain as weep holes, by plugging with zinc
solder and filing off smooth.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
clean handrails and railings of grease, dirt, oil, flux, and other
foreign matter, and treat with metallic-phosphate process.
OF THIS DRAWING IS COVERED, FOR ALL
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
No. 1," for shop painting. Primer need not be applied to surfaces
to be embedded in concrete or masonry.
CERT
PART 3 EXECUTION
3.01 EXAMINATION
REV.
NO.
_ __________ B. Perform cutting, drilling, and fitting required to install handrails and
DATE: ________
railings. Set handrails and railings accurately in location, alignment,
CONSTRUCTION
AGENCY
and elevation; measured from established lines and levels and free from
________________
rack.
DATE: _________
from parallel with rake of steps and ramps for sloping members
do not exceed 1/4 inch in 12 feet (5 mm in 3 m).
REVISION CERTIFICATION
SECTION 05520
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
fasteners where necessary for securing handrails and railings and for
properly transferring loads to in-place construction.
CONSTRUCTION
AGENCY
A. Use steel pipe sleeves preset and anchored into concrete for installing
________________
posts. After posts have been inserted into sleeves, fill annular space
DATE: _________ between post and sleeve with the following anchoring material, mixed
OPERATIONS and placed to comply with anchoring material manufacturer's written
______________ instructions:
DATE:_________
2. By set screws.
OF THIS DRAWING IS COVERED, FOR ALL
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
Anchor posts to metal surfaces with oval flanges, angle type, or floor
type as required by conditions, connected to posts and to metal
CERT
supporting surfaces.
A. Anchor railing ends into concrete and masonry with round flanges
DATE JOB/EWO
surfaces.
DISCIPLINE
ENGINEER 4. Connect flanges to railing ends using nonwelded connections.
__ ________ _
DATE: ________ 3.06 ATTACHING HANDRAILS TO WALLS
PROJECT
ENGINEER
____________
DATE ______ A. Attach handrails to wall with wall brackets. Provide bracket with 1-1/2-
CERTIFIED
inch (38-mm) clearance from inside face of handrail and finished wall
surface.
_ __________
DATE: ________
B. Locate brackets as indicated or, if not indicated, at spacing required to
CONSTRUCTION support structural loads.
AGENCY
________________
DATE: _________ D. Secure wall brackets to building construction as follows:
OPERATIONS
______________
1. For concrete and solid masonry anchorage, use drilled-in
DATE:_________ expansion shields and hanger or lag bolts.
2. For hollow masonry anchorage, use toggle bolts.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
3. For wood stud partitions, use hanger or lag bolts set into wood
EDSD
3.07 CLEANING
SECTION 05520
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
connections, and abraded areas of shop paint, and paint exposed areas
with same material.
3.08 PROTECTION
__ ________ _
DATE: ________
PROJECT
ENGINEER
____________
DATE ______
CERTIFIED
_ __________
DATE: ________
CONSTRUCTION
AGENCY
________________
DATE: _________
OPERATIONS
______________
DATE:_________
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
Date:
By:
OF THIS DRAWING IS COVERED, FOR ALL
SECTION 05520
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.