Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Saudi Aramco Oil Company: SECTION 08111 Metal Frames Part 1 - General 1.01 Section Includes

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Saudi Aramco 2616-ENG (3/99) 

OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

SECTION 08111
CERT

METAL FRAMES
ENG’G

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Non-rated and fire rated steel frames.


DESCRIPTION

B. Fire rated SSD doors steel frames

C. Interior glazed light frames.

1.02 RELATED SECTIONS

A. Section 08100 Metal Doors.


DATE JOB/EWO

B. Section 08211 Flush Wood Doors.

C. Section 08710 Door Hardware.


REV.
NO.

D. Section 08800 Glazing.


DISCIPLINE
ENGINEER

__ ________ _
E. Section 09900 Painting: Field painting of frames.
 DATE: ________ 
PROJECT F. Section 01352 LEED Requirements
ENGINEER
____________
DATE ______ G. Section 01524 – Construction Waste Management
CERTIFIED

_ __________ 1.03 REFERENCES


DATE: ________

CONSTRUCTION
AGENCY
A. ANSI/SDI-100 Standard Steel Doors and Frames.
________________
DATE: _________ B. ASTM A525 Steel Sheet, Zinc-Coated Galvanized by the
OPERATIONS Hot-Dip Process.
______________
DATE:_________
C. ASTM E152 Methods of Fire Tests of Door Assemblies.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

D. DHI Door Hardware Institute: The Installation of


EDSD

Commercial Steel Doors and Steel Frames,


Insulated Steel Doors in Wood Frames and
Date:
By:

Builder's Hardware.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

E. NFPA 80 Fire Doors and Windows.


REVISION CERTIFICATION

F. NFPA 100 Life Safety Code.


SECTION 08111

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 1
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 7
15-May-10 
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

G. NFPA 252 Fire Tests for Door Assemblies.


CERT

H. UL 10B Fire Tests of Door Assemblies.


I. SSD-7 Security and Emergency Exit Doors.
ENG’G

J. SAES-O-107 Security and Emergency Exit Doors.

K. The International Organization for Standardization document, ISO 14021


– Environmental Labels and Declarations – Self-declared Environmental
DESCRIPTION

Claims (Type II Environmental Labeling).

L. South Coast Air Quality Management District (SCAQMD) Rule 1168,


2005 – Adhesives, Sealants and Sealants Primes VOC limits.

M. Green Seal Standard for Commercial Adhesives (GS-36), 2000 – Aerosol


Adhesives VOC limits.
DATE JOB/EWO

N. Green Seal Standard GS-11 – for Commercial Flat and Non-flat Paints

O. Green Seal Standard GC-03 – for Anti-corrosive and Anti-rust Paints.


REV.
NO.

P. South Coast Air Quality Management District (SCAQMD) Rule 1113 –


Architectural Coatings.
DISCIPLINE
ENGINEER

__ ________ _
1.04 SUBMITTALS
 DATE: ________ 
PROJECT A. Submit under provisions of Saudi Aramco Contract Documents.
ENGINEER
____________
DATE ______ B. Shop Drawings: Indicate frame elevations, reinforcement, and finish.
CERTIFIED
C. Product Data: Indicate frame configuration, anchor types and spacing,
_ __________ location of cut-outs for hardware, reinforcement.
DATE: ________

CONSTRUCTION
AGENCY
D. Samples: Submit two samples of frame, 300mm x width of frame,
________________
illustrating factory finished frame thickness and quality.
DATE: _________

OPERATIONS E. Manufacturer's Installation Instructions: Indicate special installation


______________ instructions.
DATE:_________

F. The total project building materials cost.


APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

G. A tabulation of each material used on the project that is being tracked for
recycled content. The tabulation must include the following:
Date:
By:

1. Description of the material,


2. Material manufacturer
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

3. Product cost
4. Pre-consumer and/or post-consumer recycled content percentage,
REVISION CERTIFICATION

5. Source of the recycled content data.


SECTION 08111

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 2
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 7
15-May-10 
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

H. A tabulation of each material used on the project that is being tracked for
regional content. The following information to be included:
CERT

1. Product name for each tracked material;


2. Material manufacturer;
ENG’G

3. Total product cost for each tracked material;


4. Percentage of product, by weight, that meets both the extraction
and manufacture criteria;
5. Distance between the project site and extraction/harvest/recovery
site;
DESCRIPTION

6. Distance between the project site and the final manufacturing


location.

I. Provide a listing of each indoor adhesive, sealant, sealant primer and


aerosol adhesive product used on the project. Include the following
information:
1. Manufacturer’s name,
2. Product name,
DATE JOB/EWO

3. Specific VOC data (in g/L, less water) for each product,
4. Corresponding allowable VOC from the referenced standard.

J. Provide a listing of each indoor paint and coating used on the project.
REV.
NO.

Include the following information:


1. Manufacturer’s name,
DISCIPLINE
ENGINEER 2. Product name,
__ ________ _
3. Specific VOC data (in g/L, less water) for each product,
 DATE: ________ 4. Corresponding allowable VOC from the referenced standard. 
PROJECT
ENGINEER
L. Product Data for Credit EQ 4.1: For adhesives and sealants used inside
____________
DATE ______ of the weatherproofing system, including printed statement of VOC
CERTIFIED content.

_ __________ 1.05 QUALITY ASSURANCE


DATE: ________

CONSTRUCTION
AGENCY
A. Conform to requirements of ANSI/SDI-100 and ANSI A117.1.
________________
DATE: _________ 1.06 QUALIFICATIONS
OPERATIONS

______________ A. Manufacturer: Company specializing in manufacturing the Products


DATE:_________
specified in this section with minimum three years experience.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

1.07 REGULATORY REQUIREMENTS


EDSD

A. Fire Rated Frame Construction: Conform to ASTM E152, NFPA 252,


Date:
By:

and UL 10B.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

B. Installed Frame Assembly: Conform to NFPA 80 for fire rated class


same as fire door.
REVISION CERTIFICATION

SECTION 08111

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 3
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 7
15-May-10 
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

C. Fire rated frames should have permanent fire rating labels attached by
the manufacturer.
CERT

D. SSD door frames shall conform to requirements of NFPA 80 & NFPA-


ENG’G

101.

1.08 DELIVERY, STORAGE AND HANDLING

A. Deliver, store, protect, and handle products to site under provisions of


DESCRIPTION

Contract Documents.

B. Accept frames on site in manufacturer's packaging. Inspect for


damage.

1.09 FIELD MEASUREMENTS

A. Verify that field measurements are as indicated on shop drawings.


DATE JOB/EWO

1.10 COORDINATION

A. Coordinate the work with frame opening construction, door and


REV.
NO.

hardware installation (wall clear opening should be coordinated with the


door leaf size & the doors frames & other accessories).
DISCIPLINE
ENGINEER

__ ________ _
PART 2 - PRODUCTS
 DATE: ________ 
PROJECT 2.01 FRAME MANUFACTURERS
ENGINEER
____________
DATE ______ A. 1. Fenestra Corp; AICS Al Dress Dammam.
CERTIFIED Tel: 03 857 6468/857 8288
Fax: 03 857 0356
_ __________
DATE: ________
2. Al Kuhaimi Metal Industries Ltd., Dammam
CONSTRUCTION
AGENCY
Tel: 03 857 2777
________________
Fax: 03 857 2591
DATE: _________

OPERATIONS B. Substitutions: Under provisions of Saudi Aramco Contract Documents.


______________
DATE:_________ 2.02 FRAME CONSTRUCTION
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

2.02.1 Typical Door Frames


EDSD

A. Masonry Wall Frame Construction: Provide frames for 44mm (1-3/4")


Date:
By:

thick doors fabricated from 1.5mm (16 gauge) hot dipped galvanized
steel sheet. All bends shall be brake formed with a ture, sharp radi.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

Frame design shall have single return and double rabbet.


B. Drywall Frame Construction: Provide all drywall frames for 44mm (1-
REVISION CERTIFICATION

3/4") thick door fabricated from 1.5mm (16 gauge) hot dipped
galvanized steel sheet. All bends shall be formed from a ture, sharp
SECTION 08111

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 4
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 7
15-May-10 
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

radi. Frame design shall have a double rabbet and double return for
installation flush with wall surface as shown on drawing. Base
CERT

anchorage shall be provided for dry wall frames.


ENG’G

2.02.2 SSD Door Frames

Refer to requirement indicated in Section 08100 para 2.02.2 D, E, G & H.

2.03 ASSEMBLIES
DESCRIPTION

A. Masonry Frame Assembly: Provide all frames assembled, face welded


and ground smooth.

B. Drywall Frame Assembly: Provide all drywall frames assembled, face


welded and ground smooth.

Note: All welded frames shall be provided with a removable shipping


DATE JOB/EWO

strut- welded across the jambs at the base.

C. Attach fire rated label to each frame as applicable.


REV.
NO.

2.04 FINISH
DISCIPLINE
ENGINEER A. Steel Sheet: Galvanized to ASTM A525.
__ ________ _
 DATE: ________ B. Primer: Specified under section 09900. 
PROJECT
ENGINEER
C. Coat inside of frame profile with one layer bituminous coating to a
____________
DATE ______ thickness of manufacturer recommendation.
CERTIFIED
2.05 FRAMING SYSTEMS
_ __________
DATE: ________
A. Framing System Gaskets and Sealants:
CONSTRUCTION
AGENCY
________________
1. Provide sealants for use inside of the weatherproofing system
DATE: _________ that have a VOC content of 250 g/L or less when calculated
OPERATIONS according to 40 CFR 59, Subpart D (EPA Method 24).
______________
DATE:_________
2.06 ACCESSORY MATERIALS
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

A. Joint Sealants: For installation at perimeter of aluminum-framed


EDSD

systems, as specified in Division 7 Section "Joint Sealants."


Date:
By:

1. Provide sealants for use inside of the weatherproofing system


that have a VOC content of 250 g/L or less when calculated
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

according to 40 CFR 59, Subpart D (EPA Method 24).


PART 3 - EXECUTION
REVISION CERTIFICATION

3.01 EXAMINATION
SECTION 08111

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 5
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 7
15-May-10 
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

A. Verify that opening sizes and tolerances are acceptable.


CERT

3.02 INSTALLATION
ENG’G

A. Install frames in accordance with ANSI/SDI-100 and DHI.

B. Coordinate with wall construction for anchor placement.


DESCRIPTION

C. Coordinate installation of frames with installation of hardware specified


in Section 08710 and Metal Doors in Section 08100.

D. All CMU frames to be grouted solid after installation.

3.03 ERECTION TOLERANCES

A. Maximum Diagonal Distortion: 1/8 inch 3 mm measured with straight


DATE JOB/EWO

edges, crossed corner to corner.

3.04 SCHEDULE
REV.
NO.

A Refer to Architectural Drawings.


DISCIPLINE
ENGINEER 3.05 RECYCLED CONTENT
__ ________ _
 DATE: ________ A. Use materials with recycled content such that the sum of post-consumer 
PROJECT recycled content plus one-half of the pre-consumer content constitutes a
ENGINEER
total of at least 20%, based on cost, of the total value of the materials in
____________
DATE ______ the project.
CERTIFIED
3.06 REGIONAL MATERIALS
_ __________
DATE: ________
A. Use building materials or products that have been extracted, harvested or
CONSTRUCTION
AGENCY
recovered, as well as manufactured, within 500 miles of the project site
________________
for a total of at least 20%, based on cost, of the total materials value.
DATE: _________

OPERATIONS

______________ 3.07 ADHESIVES & SEALANTS


DATE:_________

All adhesives and sealants used on the interior of the building (defined as inside
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

of the weatherproofing system and applied on-site) shall comply with the
EDSD

requirements of the following reference standards:


Date:
By:

A. South Coast Air Quality Management District Rule 1168, 2005 –


Adhesives, Sealants and Sealants Primes VOC limits.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

B. Green Seal Standard for Commercial Adhesives (GS-36), 2000 – Aerosol


REVISION CERTIFICATION

Adhesives VOC limits.


SECTION 08111

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 6
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 7
15-May-10 
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

3.08 PAINTS & COATINGS


CERT

Paints and coatings used on the interior of the building (defined as inside of the
weatherproofing system and applied on-site) shall comply with the following
ENG’G

criteria:

A. Architectural paints, coatings and primers applied to interior walls and


ceilings: Do not exceed the VOC content limits established in Green Seal
Standard GS-11, Paints, First Edition, May 20, 1993.
DESCRIPTION

– Flats: 50 g/L
– Non-Flats: 150 g/L

B. Anti-corrosive and anti-rust paints applied to interior ferrous metal


substrates: Do not exceed the VOC content limit of 250 g/L established in
Green Seal Standard GC-03, Anti-Corrosive Paints, Second Edition,
January 7, 1997.
DATE JOB/EWO

C. Clear wood finishes, floor coatings, stains, sealers, and shellacs applied
to interior elements: Do not exceed the VOC content limits established in
South Coast Air Quality Management District (SCAQMD) Rule 1113,
Architectural Coatings, rules in effect on January 1, 2004.
REV.
NO.

– Clear wood finishes: varnish 350 g/L; lacquer 550 g/L


– Floor coatings: 100 g/L
DISCIPLINE
ENGINEER – Sealers: waterproofing sealers 250 g/L; sanding sealers 275 g/L; all
__ ________ _
other sealers 200 g/L
 DATE: ________ – Shellac: clear 730 g/L; pigmented 550 g/L 
PROJECT – Stains: 250 g/L
ENGINEER
____________
DATE ______

CERTIFIED
END OF SECTION

_ __________
DATE: ________

CONSTRUCTION
AGENCY
________________
DATE: _________

OPERATIONS

______________
DATE:_________
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

Date:
By:
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________


REVISION CERTIFICATION

SECTION 08111

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 7
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 7
15-May-10 

You might also like