Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Cath Basin: Detailed of

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A B C D E F

A A1 A2 A3 A4 E F A A1 A5 E F
12000
2500 2000 2500 2000 3000 12000 12000
1502 998 3500 2000 2300 1200 3000 3500 2750 2750 3000

1 1 1 100 300 (min.) 100

1500
1500

1500
1446

50Ø
50Ø
50Ø 50Ø 50Ø

2000
50Ø

100Ø x 50Ø
50Ø

100
4000
50Ø
1a 50Ø

2000
50Ø 50Ø 50Ø

1200
50Ø

4000
100Ø

300 (min.)
3600
5440

1b

2300
7440

50Ø

100
4649
3

2723

12815
P L A N

4950
2000

8690
50Ø
2 50Ø

2
50Ø

4 50Ø
LIFTING HANDLE L-25x25x6 FRAME
50Ø

2a R.C. COVER

20870
3000
50Ø
20869

20870
50Ø 50Ø

FFL FFL

1500
5450
50Ø
6000

50Ø
2e 50Ø

50 (min). CONC. DRAIN PIPE

600 MIN.
50Ø

3000
(VERIFY DIAMETER)
2500 50Ø

2b
5

6670

1000
100Ø
100mm THK.
CB AD CHB WALL W/

3825
100 HOR. & VERT.

100
50 (min.)
BARS @ 200mm O.C.
4000

5625
5575
5071

100Ø

125
4000
SEPTIC TANK 2c
2f
6 1500 50Ø 50Ø

1330
S E C T I O N
±1984

2d 2d

984
984

WM TAP TO WATER LINE


3043 3500 2500 3017 2043
1500 4000
7000
1500
3017 2043 2250 2250 2500 3017
DETAILED OF
12060 12060 12060
CATH BASIN
GROUND FLOOR LAYOUT FOR SECOND FLOOR LAYOUT FOR THIRD FLOOR LAYOUT FOR
SEWER & AREA DRAIN SEWER & AREA DRAIN SEWER & AREA DRAIN
20mm

305mm

COLD WATER SUPPLY


(TWO WAY ANGLE VALVE)

TO BIDET
PLUMBING GENERAL NOTES

VARIES
SEPTIC VAULT SHALL BE CONSTRUCTED WATERTIGHT/WATERPROOF
TO ELIMINATE SEEPAGE. WC
ALL SOIL PIPE AND WASTE PIPE LINE SHALL BE PVC PIPE UNION PATENT

VARIES
50Ø WATER METER
AND SHALL BE PROPERLY JOINTED WITH PVC SOLVENT CEMENT. TEE HOSE BIB
OVERFLOW FROM SV SHALL BE DISCHARGED DIRECTLY TO STREET

210
DRAINAGE. DRAIN PIPE AND CATCH BASINS DISCHARGING OUTFLOW
WASTE PIPE SHALL BE 100MMDIA. PVC PIPE FOR MAIN PIPE AND
FROM THE SEPTIC VAULT SHALL ALSO BE CONSTRUCTED FFL
50MMDIA. PVC PIPE FOR LAVATORY, FLOOR DRAIN, MAIN VENT 50MMDIA.
WATERTIGHT/WATERPROOF TO PREVENT LEAKAGE TO PERCOLATE TO
AND BRANCH VENT 50MMDIA.. MASTIC FILLER PIPE SLEEVE (TYP)
THE GROUND.
PIPE SLEEVE
WATER SUPPLY LINES SHALL BE POLYPROPYLENE (PPR) WHITE PIPE 50mmØ VP
AS STATED ON PD 1096 OTHERWISE KNOWN AS THE BUILDING CODE OF
AND PROVIDE INDIVIDUAL SHUT-OFF VALVE FOR EVERY BRANCH
THE PHILIPPINES, SECTION 902. WATER SUPPLY SYSTEM; (A)
FIXTURE. 100mmØ SP
WHENEVER AVAILABLE, THE POTABLE
WATER REQUIREMENTS FOR A BUILDING USED FOR HUMAN HABITATION
VENT STOCK THRU ROOF SHALL BE EXTENDED AT 0.30M ABOVE THE
SHALL BE SUPPLIED FROM EXISTING MUNICIPAL OR CITY WATER
ROOFLINE.
WORKS SYSTEM.
WATER LINES FROM SOURCE SHALL BE 25MMDIA. PVC AND 20 MMDIA.
ALL OTHER REQUIREMENTS SHOULD FOLLOW THE PROVISIONS OF THE WATER METER
PVC FOR BUILDING CONNECTION.
NATIONAL PLUMBING CODE OF THE PHILIPPINES AND R.A. 1378.
DETAIL OF
THE SLOPE OF HOUSE AND SEWER LINE DRAIN SHALL BE 2% TO THE
PLUMBING WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION
DIRECTION OF FLOW.
OF A DULY LICENSED WATER CLOSET
MASTER PLUMBER.

PRC No.
PROJECT TITLE REVISION DATE SHEET CONTENTS R.A 9266 SEC. 33 APPROVED BY: SHEET NO.
IAPOA No.

PTR No. CONSTRUCTION OF A 3-STOREY


PLACE ISS.
RESIDENTIAL BUILDING (W/ STOCK ROOM) AS SHOWN
PRESIDENTIAL DECREE NO. 49
DATE ISS.
CADD BY: CIMA~HDE
ARCHITECT TIN NO. LOCATION: OWNER
CHECKED BY:

You might also like