PROJECT REPORT
Prepared For:
Location: RAJASTHAN
Recipients Of Design Products Provided By M.I.C. Industries Shall Be Solely Responsible For Consulting With A Structural
Engineer To Conduct A Review And Validation Of The Analysis. In No Event Shall M.I.C. Industries, Inc. Be Liable For Any
Damages Whatsoever (Including, Without Limitation, Damages For Loss Of Business Profits, Business Interruption, Loss Of
Business Information, Or Other Pecuniary Loss) Arising Out Of The Mathematical Results From The Software Analysis Even If
M.I.C. Industries, Inc. Has Been Advised Of The Possibility Of Such Damages.
Prepared For: ADANI GREEN ENERGY LTD
BUILDINGWORKS_1.XBM
Loading Summary
Snow Load 0 kg/m2
Wind Load 170 km/h
* Values do not include scrap factors
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
Prepared For: ADANI GREEN ENERGY LTD
BUILDINGWORKS_1.XBM
CONCENTRATED LOADS:
None
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
ADANI GREEN ENERGY LTD
Geometry Plot
BUILDINGWORKS_1.XBM
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
Prepared For: ADANI GREEN ENERGY LTD
BUILDINGWORKS_1.XBM
Figure 1
LOADING CONDITIONS
CODE: IBC 2006 International Building Code
STANDARD: ACSE-7-05 Minimum Design Loads for Buildings and Other Structures
Building Category (Table 1-1) Catagory II, Other
Wind Exposure (6.5.6.3) Exposure C, Open Terrain
Snow Exposure (Table 7-2) Fully Exposed, Factor 0.9
Snow Thermal Factor (Table 7-3) Unheated, Factor 1.2
Importance Factor (Table 7-4) Catagory II, Factor 1.0
Wind Speed 170.00 km/h Enclosed Building
Ground Snow Load 0.00 kg/m2
Roof Minimum Live Load (4.9.1) 58.59 kg/m2
Design Wind Pressure (6.5.12.2.2) 100.67 kg/m2
Design Snow Roof Load (7.3) 58.59 kg/m2
Building Panel MIC-240 1.60 mm ASTM-A653 Grade 50
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
Prepared For: ADANI GREEN ENERGY LTD
BUILDINGWORKS_1.XBM
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
Prepared For: ADANI GREEN ENERGY LTD
BUILDINGWORKS_1.XBM
8 +0.60 x Structure Dead & Conc. Loads +1.00 x Wind Normal to Ridge 2 +1.00 x Wind Internal Pressure
Figure 2
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
Prepared For: ADANI GREEN ENERGY LTD
BUILDINGWORKS_1.XBM
Interaction Equations
Specification: AISI North American Specification for the Design of Cold-formed
Steel Structural Members 2007 Edition
Node Location of Maximum Loading = 1 of 46
1.67 * 0.47
= = 0.19 <= 1.00 OK!
4.22 Load Case = 26, Element = 46
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
Prepared For: ADANI GREEN ENERGY LTD
BUILDINGWORKS_1.XBM
STRUCTURAL RESULTS:
Notes: A Normal Panel Type Wall With A Fixed (Concrete) Base Type Was Used To Determine Strength Ratios!
Seismic loadings are not checked in the analysis.
Supporting structures should be checked separately if applicable.
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
Prepared For: ADANI GREEN ENERGY LTD
BUILDINGWORKS_1.XBM
Note: These values are for load cases only. Add individual values to create load
combinations per your local ordinance. All loads are service (un-factored) loads.
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
Prepared For: ADANI GREEN ENERGY LTD
BUILDINGWORKS_1.XBM
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
ADANI GREEN ENERGY LTD
Lifting Planner
BUILDINGWORKS_1.XBM
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
ADANI GREEN ENERGY LTD
Panel Inspection Plot
BUILDINGWORKS_1.XBM
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved
ADANI GREEN ENERGY LTD
Site Plan
BUILDINGWORKS_1.XBM
M.I.C. - BuildingWorks® M.I.C. Industries, Inc. Copyright © 2016-2017 M.I.C. Industries, Inc.
Reston, VA 20190 USA All Rights Reserved