General Data and Information
General Data and Information
General Data and Information
Model No. : T60 No. Of B/I & B/O : 16 I/P & 16 O/P
3- ELECTRICAL TESTS
a) FUNCTION TEST:
b) TRANSFORMER DATA:
Manufacturer : HYUNDAI
Rated Power: 50/67 MVA Vector Group: YNyn0+d
HV Rated Voltage 132 KV LV Rated Voltage 13.8 KV
HV Rated Current 218.7 A LV Rated Current 2092 A
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 2 of 20
c) GLOBAL PROTECTION SETTINGS:
Transformer rating 50MVA
winding “HV” Voltage 132 kV
winding “LV”Voltage 13.8 kV
CT Ratio winding “HV”: 600/1
CT Ratio winding “LV” : 3600/1
Neutral CT Ratio winding “HV”: 600/1 (HV REF)
Neutral CT Ratio winding “LV”: 3600/1 (LV REF)
Neutral CT Ratio winding “LV”: 800/1 (LV SBEF)
VT Nominal secondary : 115 V
% Impedance 22
d) BURDEN TEST:
Relay status Supply Voltage (VDC) Measured Current (mA) Calculated Burden (VA)
Not operated 125 0.195 24.375
Operated 125 0.205 25.625
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 3 of 20
2- INPUTS, OUTPUTS & LEDS CHECKS:
O/P-2 H2 NO SPARE --
O/P-3 H3 NO SPARE --
O/P-7 P3 NO 50/51P 30
O/P-11 U3 NO SPARE --
O/P-13 U5 NO SPARE --
O/P-14 U6 NO SPARE --
O/P-15 U7 NO SPARE --
O/P-16 U8 NO SPARE --
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 4 of 20
LED CHECK
LED No. Allocation (Function Assigned) Result
LED 1 XFMR PCNT DIFF OP
LED 2 XFMR PCNT DIFF OP A
LED 3 XFMR PCNT DIFF OP B
LED 4 XFMR PCNT DIFF OP C
LED 5 XFMR INST DIFF OP
LED 6 XFMR INST DIFF OP A
LED 7 XFMR INST DIFF OP B
LED 8 XFMR INST DIFF OP C
LED 9 XFMR PCNT DIFF 2ND A
LED 10 XFMR PCNT DIFF 2ND B
LED 11 XFMR PCNT DIFF 2ND C
LED 12 XFMR PCNT DIFF 5TH A
LED 13 XFMR PCNT DIFF 5TH B
LED 14 XFMR PCNT DIFF 5TH C
LED 15 RESTD GND FT1 OP
LED 16 RESTD GND FT2 OP
LED 17 PHASE TOC1 OP
LED 18 PHASE TOC1 OP A
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 5 of 20
3- DIFFERENTIAL PROTECTION
3.1 Checking the first section of tripping characteristics: (Zero Sequence Filter Off for All Windings)
Test method: (Zero sequence filtering disabled during this test for all windings, Vec. Group HV, LV=0).
Expected Operating Current = 0.3/M1 = 0.3/1.59 = 0.188A @HV side
=0.3/M2 =0.3/1 = 0.3A @LV side
Pick Up Drop off
Test Winding Expected operating current
current current
1-phase (L1 phase) HV 0.188 0.189 0.176
1-phase (L1 phase) LV 0.300 0.301 0.281
1-phase (L2 phase) HV 0.188 0.190 0.176
1-phase (L2 phase) LV 0.300 0.301 0.281
1-phase (L3 phase) HV 0.188 0.189 0.176
1-phase (L3 phase) LV 0.300 0.301 0.281
* Pick-up: formula ±0.5% of reading or ±1% of rated
* Drop-off: 97% to 98% of pick up (GE-T60 instruction manual page no: 56 of 788)
3.2) Checking the first section of tripping characteristics: (Zero Sequence Filter On for All Windings)
Test method:
(Zero sequence filtering enable during this test for all windings, Vec. Group HV, LV=0).
Expected Operating Current = (0.3/M1) / (2/3) = (0.3/1.59) / 0.67 = 0.281A @HV side
= (0.3/M2) / (2/3) = (0.3/1) / 0.67= 0.447A @LV side
(Factor of 0.67 for zero seq. filtering for single phase injection)
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 7 of 20
Calculations:
Ib measured = Ib= (I1*M1+I2*M2)/2.
Id measured= (I1*M1)-(I2*M2)
First section of characteristics: Id calculated = K1*Ib
Third Section of characteristics: Id calculated = K2*Ib
A- First section of characteristics:
Id calculated = K1*Ib
Ib = 1.5 P.U
at unstable case: Id = 0.3 * 1.5 = 0.45 P.U
at stable case: Id = 0
I1 = (Id-+I2)/M1 I2 = Ib = 1.5A
I1 = (0.0+1.5)/1.59 = 0.943A
Id calculated = K2*Ib
Ib = 3.5 P.U
at unstable case: Id = 0.8 * 3.5 = 2.8 P.U
at stable case: Id = 0
I1 = (Id-+I2)/M1 I2 = Ib = 3.5A
I1 = (0.0+3.5)/1.59 = 2.201A
Note: varied the phase angle of HV or LV current. Keep current magnitude constant for fix the bias constant.
L1-Phase
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 8 of 20
Winding Winding
Section of Restrain current Differential current
“HV” “LV” Measured
tripping ( with respect to Iref) ( with respect to Iref)
Injected Injected %Slope
char. Under
Current Current (Id/Ib)
test Calculated Measured Calculated Measured
A A
min pickup 0.314 0.500 0.5 0.499 0.30 0.301 Min. pick up
First (30%) 0.943 1.500 1.5 1.499 0.45 0.450 30.02 %
Second
1.572 2.500 2.5 2.500 1.430 57.20 %
(30%-80%) 1.5(approx.)
Third (80%) 2.201 3.500 3.5 3.500 2.80 2.807 80.20 %
L2-Phase
Winding Winding
Section of Restrain current Differential current
“HV” “LV” Measured
tripping ( with respect to Iref) ( with respect to Iref)
Injected Injected %Slope
char. Under
Current Current (Id/Ib)
test Calculated Measured Calculated Measured
A A
min pickup 0.314 0.500 0.5 0.499 0.30 0.301 Min. pick up
First (30%) 0.943 1.500 1.5 1.499 0.45 0.449 29.95 %
Second
1.572 2.500 2.5 2.500 1.430 57.2 %
(30%-80%) 1.5(approx.)
Third (80%) 2.201 3.500 3.5 3.501 2.80 2.806 80.14 %
L3-Phase
Winding Winding
Section of Restrain current Differential current
“HV” “LV” Measured
tripping ( with respect to Iref) ( with respect to Iref)
Injected Injected %Slope
char. Under
Current Current (Id/Ib)
test Calculated Measured Calculated Measured
A A
min pickup 0.314 0.500 0.5 0.499 0.30 0.300 Min. pick up
First (30%) 0.943 1.500 1.5 1.499 0.45 0.450 30.02 %
Second
1.572 2.500 2.5 2.500 1.427 57.08 %
(30%-80%) 1.5(approx.)
Third (80%) 2.201 3.500 3.5 3.502 2.80 2.805 80.09 %
* Pick-up: formula ±0.5% of reading or ±1% of rated
* Drop-off: 97% to 98% of pick up (GE-T60 instruction manual page no: 56 of 788)
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 9 of 20
L1 HV 20
L2 HV 19
L3 HV 21
L1 LV 20
L2 LV 19
L3 LV 20
HV Side: 20%
Injected 5th
Applied Phase Injected (I1) Current 5th Harmonic %
Harmonic Current
L1-Phase 1.0 0.199 19.9 %
L2-Phase 1.0 0.199 19.9 %
L3-Phase 1.0 0.199 19.9 %
LV Side: 20%
Injected 5th
Applied Phase Injected (I1) Current 5th Harmonic %
Harmonic Current
L1-Phase 1.0 0.199 19.9 %
L2-Phase 1.0 0.199 19.9 %
L3-Phase 1.0 0.199 19.9 %
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 10 of 20
= (IS/M2) = 5/1 = 5 A @LV side
4.1) HV REF:
Pick up 0.08 A
Slope 40 %
Op.time 0.8 A
Source HV
Slope= Id/Ib
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 11 of 20
Note: varied the phase angle of Phase or Neutral current. Keep current magnitude constant for fix the bias constant.
4.2). LV REF:
Pick up 0.08 A
Slope 40 %
Op.time 0.8 A
Source LV
(m Sec) (m Sec)
R 0 20
Y 0 19
B 0 19
N 0 18
* operating time ≤ 1 power system cycle (GE-T60 instruction manual page no: 57 of 788)
Slope= Id/Ib
Note: varied the phase angle of Phase or Neutral current. Keep current magnitude constant for fix the bias
constant.
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 13 of 20
Timing Test:
Current Time meas. in sec.
IEC TIME Time cal. in sec.
multiple Rph Yph Bph 3ph
DT 2 0.0 0.00 0.016 0.019 0.019 0.015
* operating time ±3% of operating time or ± 1/4 power system cycle (GE-T60 instruction manual page no: 57 of 788)
Timing Test
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 14 of 20
Current
IEC TMS/TIME Time cal. in sec. Time meas. in sec.
multiple
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 15 of 20
2.507 2.579
2 1.069 1.106
INV.A 0.25
5 0.824 0.857
8 3.375 3.490
2 0.843 0.882
INV.B 0.25
5 0.482 0.510
8 6.666 6.905
2 0.833 0.868
INV.C 0.25
5 0.317 0.345
8 0.444 0.484
2 0.188 0.215
ST.INV. 0.25
5 0.144 0.172
8 1.000 1.026
2 1.000 1.024
DFT 1.0
5 1.000 1.019
* operating time ±3.5% of operating time or ± 1/2 power system cycle (GE-T60 instruction manual page no: 57 of 788)
T = (K*Tm) / ((I/I s) ^ α – 1)) sec.
For Inv.A: K=0.14, α=0.02 For Inv.B: K=13.5, α=1 For Inv.C: K=80, α=2 For STI: K=0.05, α=0.04
(GE-T60 instruction manual page no: 365 of 788)
Timing test
Current
IEC TIME Time cal. in sec. Time meas. in sec.
multiple
DT 2 0.00 0.00 0.021
* operating time ±3% of operating time or ± 1/4 power system cycle (GE-T60 instruction manual page no: 57 of 788)
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 16 of 20
Timing Test :
Timing test
Current Time meas. in sec.
IEC TIME Time cal. in sec.
multiple R ph Y ph B ph 3ph
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 17 of 20
Timing test
Current
IEC TMS/TIME Time cal. in sec. Time meas. in sec.
multiple
2 2.530 2.580
5 0.25 1.091 1.109
INV.A
8 0.843 0.852
2 3.397 3.475
5 0.25 0.864 0.880
INV.B
8 0.501 0.510
2 6.678 6.891
5 0.25 0.850 0.875
INV.C
8 0.335 0.344
2 0.444 0.484
5 0.25 0.188 0.215
ST.INV.
8 0.144 0.172
2 1.000 1.027
5 1.0 1.000 1.020
DFT
8 1.000 1.020
* operating time ±3.5% of operating time or ± 1/2 power system cycle (GE-T60 instruction manual page no: 57 of 788)
T = (K*Tm) / ((I/I s) ^ α – 1)) sec.
For Inv.A: K=0.14, α=0.02 For Inv.B: K=13.5, α=1 For Inv.C: K=80, α=2 For STI: K=0.05, α=0.04
(GE-T60 instruction manual page no: 365 of 788)
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 18 of 20
Timing test
Current
IEC TIME Time cal. in sec. Time meas. in sec.
multiple
DT 2 0.00 0.00 0.020
* operating time ±3% of operating time or ± 1/4 power system cycle (GE-T60 instruction manual page no: 57 of 788)
Timing test
Current
IEC TIME Time cal. in sec. Time meas. in sec.
multiple
DT 2 1.0 1.0 1.029
* operating time ±3.5% of operating time or ± 1/2 power system cycle (GE-T60 instruction manual page no: 57 of 788)
Timing test
Current
IEC TIME Time cal. in sec. Time meas. in sec.
multiple
DT 2 0.00 0.00 0.016
* operating time ±3% of operating time or ± 1/4 power system cycle (GE-T60 instruction manual page no: 57 of 788)
Timing test
Current
IEC TIME Time cal. in sec. Time meas. in sec.
multiple
DT 2 5.0 5.0 5.05
* operating time ±3.5% of operating time or ± 1/2 power system cycle (GE-T60 instruction manual page no: 57 of 788)
TIMING TEST:
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017
Commissioning Service Department
Commissioning Standard Test Formats
Description : Pre check – 87T Relay Test Record No. :
Equip. No. : 87T-2 (R02.2) Contract no : GOSI-A-16-1
Contractor : CAPITAL LIGHTS CO. Drawing Ref: CD-814828
Substation No: 8340 Sheet No : Page 20 of 20
TIMING TEST:
Tested by Reviewed by
Name: P Ranjitkumar (PFL-017)
Signature:
Date: 02/08/2017