Schedule of Ceiling Finishes: Ground Floor Plan Second Floor Plan Reflected Ceiling Plan Roof Plan

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SCHEDULE OF CEILING FINISHES

13mm. THK. GYPSUM BOARD OR HARDI FLEX BOARD


CL-1 ON METAL FRAMES, IN FLAT WHITE PAINT LATEX
FINISH

CL-2 CONCRETE SLAB FINISH

LIGHTING FIXTURES
6"x6" SQUARE RECESSED LIGHTING
FIXTURE. (VERIFY TYPE & DESIGN)

INCANDESCENT LIGHTBULB

T5 LIGHTING OR STRIP LIGHTING

A B C A B C A B C

6530
6530 6530 2925 3609

2925 3609 2925 3609

gutter
3 3 3
CL-1

1100
CL-1 DN
2600 2600

2400

2400
2550

CL-1 998 953


2600
1100

1103 CL-1
UP

700

600
1028 3165 2038 2600

2 2 CL-1
2

800
725

2600 CL-1
CL-2 2500
1400

6700

6700
2600

1138 2127 2127 988 700

3500
4300

4300
1250

1920 1920 3240 1820 500


CL-1
2500

2000
2600 CL-1
CL-1 2600
2600
CL-1
2600

1 1 1
300 2125 2805 300

GROUND FLOOR PLAN SECOND FLOOR PLAN

01 REFLECTED CEILING PLAN 02 roof plan


A-05 SCALE: 1:100M A-05 SCALE: 1:100M

PRC PROJECT TITLE SHEET CONTENTS: SHEET NO.


PTR
DATE PROPOSED 2 STOREY RESIDENTIAL BUILDING EXTENSION deodato t. polison
as shown
A
PLACE
REGISTERED AND LICENSED ARCHITECT TIN BIGAJO NORTE, LIBMANAN, CAMARINES SUR OWNER 05 06