Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Final Bill S#4

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

NTPC Limited

ABSTRACT OF COST FOR SES

Name of the Contractor : UTILITY POWER TECH LIMITED (1011806) LOA No. & Date : 4000246093 - 03.09.2020
Location : Korba Super Thermal Power Proj Name of the work : UPL Combined Biennial job
contrac
Service Entry Sheet No. : 1003188318 Period of measurement : 26.12.2022 - 05.01.2023
SES Short Text : FINAL BILL Date of Run : 12.05.2023
Generated By : SHYAM LAL MAHANAND

QUANTITY AMOUNT (In INR)


Item.No. Service Description Unit As in
Upto Since Total Rate (In Eff. Rate Upto Since Total
Code BOQ
Previous Previous Upto INR) (In INR) Previous Previous Upto
Bill Bill Date Bill Bill Date
PO Line Item Number 00150 : Cleaning & Misc shift Assist CHP sec#4
0000000010 Plant Premises (CHP) PDY 824.000 810.000 11.000 821.000 11435.49 11435.49 9262746.90 125790.39 9388537.29
FHPLP02GN10 Cleaning
0
0000000020 Misc Works (<>) UNT 60.000 27.000 0.000 27.000 4065.53 4065.53 109769.31 0.00 109769.31
FHMSW00GN9 UNLOADING
32
0000000030 Bunker/Hopper (<>) OPS 2472.000 2430.000 33.000 2463.000 4632.45 4632.45 11256853.50 152870.85 11409724.35
FHBUH00GN10 Cleaning
0
0000000040 Travelling Tripper (<>) NO 2472.000 2430.000 33.000 2463.000 800.53 800.53 1945287.90 26417.49 1971705.39
FHTTR00GN10 Cleaning
0
0000000050 Misc Works (<>) TRP 380.000 329.500 0.000 329.500 352.60 352.60 116181.70 0.00 116181.70
FHMSW00GN9 TRANSPORTATION
01

Net Amount Payable : 305,078.73 (Three hundred five thousand seventy-eight)


Taxes : 54,914.00 (Fifty-four thousand nine hundred fourteen)
Others : 13,319.74-(Thirteen thousand three hundred nineteen)
Total Amount Payable (incl. taxes) : 346,672.99 (Three hundred forty-six thousand six hundred seventy-two)

PO No. : 4000246093 SES No.:1003188318 Page 1 of 2 12.05.2023 - 10:22:14


CERTIFICATES

1. Work has been done/completed as per specification, scope of work, Drawing and Terms & Conditions of the contract.
2. Method of measurement is as mentioned in the contract
3. It is certified that the works billed in the invoice have been executed and all relevant checks/ inspection and associated tests as per approved FQP and contract technical
specification have been carried out and results are in conformity. Surveillance on all category #C# checks have been carried out and found in conformity. Documentation and
records as per approved FQP have been maintained.
4. Reconciliation Statement for owner issue materials is enclosed/ No owner's materials were issued to the agency.
5. Agency has complied with all statutory requirements including Labour Law Compliance.
6. Applicable Taxes & Duties may be deducted.
7. Retention and net payable amount as per detail below.
8. Details of deduction for Retention, Security deposit, Penalty and recovery of HRR, electricity, Hiring of equipment etc as per details given below.

Signature of Contractor Signature of Site Engineer Signature of EIC


( Name / Sig / Date ) ( Name / Sig / Date ) ( Name / Sig / Date )

SES Created By : SHYAM LAL MAHANAND


Desg. of Creator : SENIOR MANAGER
Mobile Number : 9425534228
Release Status @: 12.05.2023 - 10:22:14
Not Released

PO No. : 4000246093 SES No.:1003188318 Page 2 of 2 12.05.2023 - 10:22:14

You might also like