S.NO MRS 2020-21 Discription of Items No's Length Width Hight/Depth Quantity Unti/Amount
@ Rs 1325 Rs 66154.57
Pcc(1:4:8) in concrete is in road with cuiring compacting etc.
(7.2+5.7)/2
Gul satan 1 67 6.45 0.25 = 108.0375 cft
Amjid 1 62 5 0.25 = 84.475 cft
(6.7+4.2)/2
Amzala 1 22 10 0.25 = 56.1 cft
Amzala 1 28 9.2 0.25 = 64.4 cft
1 36.7 13.65 0.25 = 125.23875 cft
1 53.8 10.05 0.25 = 135.1725 cft
(9.10+11)/2
1 42 5.11 0.25 = 53.655 cft
1 24 9.1 0.25 = 54.6 cft
Yasir 1 124 11.6 0.25 = 359.6 cft
(9+13+12.8)/3
1 82.5 13.1 0.25 = 270.1875 cft
(13.2+13)/2
Ali rehman 1 24.9 13 0.25 = 80.925 cft
Mulazim kor 1 9 6.8 0.25 = 15.3 cft
1 124.8 10.2 0.25 = 318.24 cft
1 15.8 9.5 0.25 = 37.525 cft
1763.45625
1763.45625 / 35.32 = 49.93
@ Rs 6004 Rs 299767.59
Pcc(1:2:4) in concrete is in road with cuiring compacting etc.
(7.2+5.7)/2
Gul satan 1 67 6.45 0.5 = 216.075 cft
Amjid 1 62 5 0.5 = 168.95 cft
(6.7+4.2)/2
Amzala 1 22 10 0.5 = 112.2 cft
Amzala 1 28 9.2 0.5 = 128.8 cft
1 36.7 13.65 0.5 = 250.4775 cft
1 53.8 10.05 0.5 = 270.345 cft
(9.10+11)/2
1 42 5.11 0.5 = 107.31 cft
1 24 9.1 0.5 = 109.2 cft
Yasir 1 124 11.6 0.5 = 719.2 cft
(9+13+12.8)/3
1 82.5 13.1 0.5 = 540.375 cft
(13.2+13)/2
Ali rehman 1 24.9 13 0.5 = 161.85 cft
Mulazim kor 1 9 6.8 0.5 = 30.6 cft
1 124.8 10.2 0.5 = 636.48 cft
1 15.8 9.5 0.5 = 75.05 cft
3526.9125
3526.9125 / 35.32 = 99.86
@ Rs 7783 Rs 777178.94
Total 1149532.14