16 - NCQC 2019 Knowledge Test - Practice Paper

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Ek Pahla Kadam Allied Concept – LQC & Kaizen

NCQC Knowledge Test 2019 _ Practice Paper No. 16


(Please consider ~ 4 numerical & ~ 4 others than LQC & Kaizen questions in same paper. Refer our Sample Papers for same.)

1) In Lean Quality Circle, project is taken:


a. From Problem Bank
b. Given by Management
c. Instant Problem may be taken
d. Any of the above
2) Lean Quality Circle is:
a. Individual Kaizen
b. Group Kaizen
c. Part of Quality Circle
d. All above
3) In Lean Quality Circle Project may be taken to:
a. Reduce Cycle Time
b. Reduce Waste
c. Value Addition
d. All above
4) In suggestion scheme, which one is correct:
a. People are giving suggestions
b. People are implementing suggestions
c. Nominated persons are giving suggestions
d. Nominated persons are implementing suggestions
5) During presentation of LQC Case Study, Facilitator role is:
a. To take part in presentation
b. To take part in answering questions asked by Judges
c. To help in Project preparation
d. All above
6) Running Quality Circle can take project in LQC but ….
a. They may take project given by management
b. They can involve other person also based on project demand
c. Project will not be discussed in QC Meeting
d. All above are correct
7) Problem which can not be solved by the first line employee in LQC, whom will be given to solve?
a. QC Teams
b. QIT of Middle Management
c. Remove from problem bank
d. To outside agency
8) In Lean Quality Circle, minimum number of members including the facilitator will be:
a. 3
b. 4
c. 5
d. 6
9) The concept of Lean management follows the proverb
a. Slow and steady wins the race
b. Fast and steady wins the race
c. Jack of all wins the race
d. Master of one wins the race

10) Lean Quality Circle is a Business Improvement methodology which combines tool & technique of:
a. Lean Manufacturing
b. Quality Circle
c. Problem Solving Steps
d. All above
Ek Pahla Kadam Allied Concept – LQC & Kaizen
11) Lean Quality Circle is a small group consists of
a. First line employee
b. Members helped by his / her immediate boss
c. Co-opt members may be from other areas
d. All above
12) In which case, two facilitators are made for one project
a. When the problem is related with many department
b. Problem is related to two department
c. Management nominates
d. Problem area facilitator nominates
13) In LQC all the tools and techniques have been DIVIDED IN 3 PHASE, which one does not belong to Phase-2
a. Milestone Chart
b. Priority Number / Ranking Method
c. Pareto Analysis
d. Stratification
14) In DMAIC, “Improvement” consists of which step of 12 step of problem-solving sequence
a. 7th & 8th Step
b. 7th, 8th, 9th & 10th Step
c. 8th, 9th, 10th & 11th Step
d. 9th, 10th, 11th & 12th Step
15) Is idea of kaizen are restricted to the area of one’s function or work only?
a. Yes
b. No
c. Sometimes
d. Not at all
16) Whose responsibility is to ensure implement of “INNOVATION” in their organisation?
a. Top Management
b. Middle Officers & Supervisor
c. Workers
d. All above
17) The first recorded SUGGESTION SCHEME was in 1770 in
a. British Military
b. British Navy
c. British Officers
d. British manufacturer
18) Which one is not the part of THREE STAGE OF KAIZEN?
a. Eliminate
b. Reduce
c. Store
d. Change

19) Name the western approach which is based on reward to the suggested
a. Innovation
b. Kaizen
c. Suggestion Scheme
d. All as above

20) A Quality Improvement Team conducted their meeting 3 times a day. Is it possible?
a. Yes
b. No
c. Never
d. Not Possible
Designed by : Dinesh Sharma e-mail : dinesh@ekpahlakadam.com Mobile No. : 9589004005
Date : 12th Dec 2019 Duration : 20 minutes
Ek Pahla Kadam Allied Concept – LQC & Kaizen

NCQC Knowledge Test 2019 _ Practice Paper No. 16

Answer Sheet

Participant Name: Circle Name:


Q. No. Answer Description Marks

10

11

12

13

14

15

16

17

18

19

20

Total Marks