151 G1 GS BC# PR Doc 0063 B1

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

NATIONAL IRANIAN SOUTH OIL COMPANY

 
N.I.S.O.C

PROJECT: GACHSARAN RESERVOIRS BASIC STUDIES PROJECT


Project No.: …………………….
Contract No.: ……………………

EQUIPPING GACHSARAN 1&2 WELLHEAD CLUSTERS


TO SPARE PUMP-
CLUSTER 41

Data Sheet for


NEW VERTICAL CRUDE OIL PUMP

E.Rahmani
B1 Issue for Comment S.Gholami GH.Rahmati 99/05/15
S.Hosseini
E.Rahmani
B0 Issue for Comment S.Gholami GH.Rahmati 99/04/23
S.Hosseini
Prepared by Check by Approved by Date Approved Date
REV. DESCRIPTION
CONSULTING

DOCUMENT NO.: 151-G1-GS-BC#-PR-DOC -0063

TRANSMITTAL NO.: TR-TACE-NISOC-151-PR-068

REV.: B1 PAGE: 1 of 8
Project No.:

Doc. No: 151-G1-GS-BC#-PR-DOC -0063

 N.I.S.O.C Date: 99/05/15

PROJECT: EQUIPPING GACHSARAN 1&2 WELLHEAD CLUSTERS TO SPARE Rev.: B1


PUMP - CLUSTER 41 Page: 2 of 8

Document Title: DATA SHEET For NEW VERTICAL CRUDE OIL PUMP
TABULATION OF REVISED PAGES
REVISION REVISION
SHEET REMARK SHEET REMARK
B0 B1 B2 B3 B0 B1 B2 B3
1 X X 51
2 X X 52
3 X X 53
4 X X 54
5 X X 55
6 X X 56
7 X X 57
8 X X 58
9 59
10 60
11 61
12 62
13 63
14 64
15 65
16 66
17 67
18 68
19 69
20 70
21 71
22 72
23 73
24 74
25 75
26 76
27 77
28 78
29 79
30 80
31 81
32 82
33 83
34 84
35 85
36 86
37 87
38 88
39 89
40 90
41 91
42 92
43 93
44 94
45 95
46 96
47 97
48 98
49 99
50 100
Project No.:

DOC. NO.: 151-G1-GS-BC#-PR-DOC -0063


National Iranian South Oil Company
 N.I.S.O.C
Date: 99/05/15

PROJECT : EQUIPPING GACHSARAN 1&2 WELLHEAD CLUSTERS TO SPARE Rev.:B1


PUMP - CLUSTER 41 Page: 3 of 8
Document Title: DATA SHEET For NEW VERTICAL CRUDE OIL PUMP
1 Note APPLICABLE TO: PROPOSAL APPLICABLE NTL/INTNTL STANDARD: API-610 11th Edition & IPS G-PM-105 Rev
2 FOR P-1017 A UNIT
3 SITE GACHSARAN 1&2 - Cluster 41 SERVICE
4 NO. REQ 1(SPARE) PUMP SIZE TYPE Centrifugal No. STAGES
5 MANUFACTURER MODEL SERIAL NO.
6
7 LIQUID CHARACTERISTICS
8 Units Maximum Minimum Note SERVICE : CONTINUOUS
9 LIQUID TYPE OR NAME : HC Liquid • IF INTERMITTENT NO. OF STARTS :

10 VAPOR PRESSURE : barA 7.91 PUMPS OPERATE IN: PARALLEL


11 RELATIVE DENSITY : 0.925 0.858 CORROSION DUE TO : (6.12.1.9)
12 SPECIFIC HEAT : kJ/(kg-K) EROSION DUE TO : (6.12.1.9)
13 VISCOSITY : cP 27.01 4.53 H2S CONCENTRATION (ppmw) : (6.12.1.12) 220

14 OPERATING CONDITIONS (6.1.2) CHLORIDE CONCENTRATION (ppm) :


15 Units Maximum Rated Normal Minimum PARTICULATE SIZE (DIA IN MICRONS)
16 NPSHa Datum: C.L. Impeller PARTICULATE CONCENTRATION (PPM)
17 PUMPING TEMPERATURE : °C 45.00 24.00 CO2 CONCENTRATION (PPMw) 353
18 FLOW : m3/hr 127.00 102.40 93.09 40.05 B1
19 DISCHARGE PRESSURE : (6.3.2) barg 10.59
20 SUCTION PRESSURE : barg 7.14 B1
21 DIFFERENTIAL PRESSURE : bar 3.45
22 DIFFERENTIAL HEAD : m 38.0
23 NPSHA : m 2.7 B1
24 HYDRAULIC POWER : kW 9.81

25 SITE AND UTILITY DATA

26 LOCATION: ( UNDER SHELTER ) COOLING WATER :


27 OUTDOOR UNHEATED UNDER ROOF INLET RETURN DESIGN

28 MOUNTED AT : l TROPICALISATION REQD TEMP °C MAX


29 ELECTRIC AREA CLASSIFICATION: acc to ZONE PRESS. bar g MIN
30 GROUP TEMP CLASS SOURCE
31 SITE DATA : COOLING WATER CHLORIDE CONCENTRATION: ppm
32 ELEVATION (MSL) : m BAROMETER : 13.7/13.2 PSI INSTRUMENT AIR : MAX bar g MIN bar g
33 RANGE OF AMBIENT TEMPS:MIN / MAX -5 / 55 °C STEAM
34 RELATIVE HUMIDITY: MIN / MAX 11 / 93 % DRIVERS HEATING
35 UNUSUAL CONDITIONS: DUST TEMP °C Max

36 OTHER: Min
37 UTILITY CONDITIONS : PRESS. bar g Max
38 ELECTRICITY : DRIVERS HEATING CONTROL SHUTDOWN Min
39 VOLTAGE 400V
40 PHASE 3PH N2: MAX bar g MIN bar g
41 HERTZ 50HZ

42 PERFORMANCE DRIVER (7.1.5)


43 PROPOSAL CURVE NO. RPM Driver Type MOTOR
44 As Tested Curve No. GEAR (VENDOR TO SPECIFY)
45 RATED MIN. mm VARIABLE SPEED REQUIRED NO
46 RATED POWER kW EFFICIENCY (%) SOURCE OF VARIABLE SPEED
47 RATED CURVE BEP FLOW (at rated impeller dia) m³/h OTHER
48 MIN FLOW : THERMAL m³/h STABLE m³/h MANUFACTURER As per Client's Approved List
49 PREFERRED OPERATING REGION (6.1.11) to m³/h NAMEPLATE POWER kW
50 ALLOWABLE OPERATING REGION to m³/h Nominal RPM
51 MAX HEAD @ RATED IMPELLER m RATED LOAD RPM
52 MAX POWER @ RATED IMPELLER (6.8.9) kW FRAME OR MODEL
53 NPSH3 AT RATED FLOW : m ORIENTATION HORIZONTAL
54 CL PUMP TO U/S BASEPLATE m LUBE
55 NPSH MARGIN AT RATED FLOW : m BEARING TYPE:
56 SPECIFIC SPEED (6.1.9) m3/h, rpm, m 12000 RADIAL /
57 SUCTION SPECIFIC SPEED LIMIT THRUST /
58 SUCTION SPECIFIC SPEED m3/h, rpm, m STARTING METHOD Closed-Valve (Unloaded) Start
59 MAX. ALLOW. SOUND PRESS. LEVEL REQD (6.1.14) 85 (dBA) SEE DRIVER DATA SHEET
60 EST MAX SOUND PRESS. LEVEL (dBA) ENCLOSURE / TERMINAL INGRESS PROTECTION TEFC
61 MAX. SOUND POWER LEVEL REQ'D (6.1.14) 85 @ 1 meter EXPLOSION PROOF TYPE Exd IIB T3
62 EST MAX SOUND POWER LEVEL INSULATION/TEMPERATURE RISE F/B
63
64
65
66 N/A : NOT APPLICABLE
67
68
69
Project No.:

National Iranian South Oil Company DOC. NO.: 151-G1-GS-BC#-PR-DOC -0063


 N.I.S.O.C
Date: 99/05/15

Rev.:B1
PROJECT : EQUIPPING GACHSARAN 1&2 WELLHEAD CLUSTERS TO SPARE
PUMP - CLUSTER 41 Page: 4 of 8

Document Title: DATA SHEET For NEW VERTICAL CRUDE OIL PUMP
1 Note CONSTRUCTION Rev

2 API PUMP TYPE: OH3 [Based on API 610 definitions] CASING MOUNTING: IN-LINE B1

3 GACHSARAN 1&2 - CASING TYPE: (6.3.10) DIFFUSER


4 NOZZLE CONNECTIONS: (6.5.5) OH3 BACKPULLOUT LIFTING DEVICE REQD. (9.1.2.6)
5 Size Facing Rating Position CASE PRESSURE RATING:
6 SUCTION RF IN-LINE MAWP : (6.3.6) 40.00 bar g @ °C
7 DISCHARGE RF IN-LINE HYDROTEST : 1.5 × MAWP bar g @ °C
8 PRESSURE CASING AUX. CONNECTIONS: (6.4.3.2)
9 No. Size Type Facing Rating Posn. HYDROTEST OH PUMP AS ASSEMBLY

10 BALANCE/LEAK OFF SUCT'N PRESS. REGIONS DESIGNED FOR MAWP YES


11 DRAIN RF ROTATION: (VIEWED FROc
12 VENT RF • IMPELLERS INDIVIDUALLY SECURED :
13 PRESSURE GAGE • BOLT OH 3/4/5 PUMP TO PAD / FOUNDATION :
14 TEMP GAGE • PROVIDE SOLEPLATE FOR OH 3/4/5 PUMPS
15 WARM-UP LINE ROTOR:
16 SHAFT FLEXIBILITY INDEX (SFI) (9.1.1.3) (VENDRO TO SPECIFY)
17 Drain Valve Supplied By SUPPLIER First Critical Speed Wet (Multi stage pumps only)
18 DRAINS MANIFOLDED YES COMPONENT BALANCE TO ISO 1940 G1.0 YES
19 VENT Valve Supplied By SUPPLIER SHRINK FIT -LIMITED MOVEMENT IMPELLERS (9.2.2.3)
20 VENTS MANIFOLDED YES
21 THREADED CONS FOR PIPELINE SERVICE & < 50°C (6.4.3.2) NO COUPLING:(7.2.3) (7.2.13.f)
22 SPECIAL FITTINGS FOR TRANSITIONING (6.4.3.3) NO MANUFACTURER
23 CYLINDRICAL THREADS REQUIRED (6.4.3.8) NO MODEL
24 NO RATING (POWER/100 RPM)
25 MACHINED AND STUDDED CONNECTIONS (6.4.3.12) NO SPACER LENGTH mm
26 VS 6 DRAIN N/A SERVICE FACTOR Minimum: 1.5
27 DRAIN TO SKID EDGE YES RIGID NO
28 COUPLING WITH HYDRAULIC FIT (7.2.10) YES
29 MATERIAL (6.12.1.1) COUPLING BALANCED TO ISO 1940-1 G6.3 (7.2.3) YES
30 APPENDIX H CLASS D-1 (VENDRO TO CONFIRM) COUPLING WITH PROPRIETARY CLAMPING DEVICE (7.2.11)
31 MIN DESIGN METAL TEMP (6.12.4.1) acc to -5 °C
32 REDUCED-HARDNESS MATERIALS REQ'D (6.12.1.12.1) NO COUPLING IN COMPLIANCE WITH (7.2.4) API 671
33 Applicable Hardness Standard (6.12.1.12.3) COUPLING GUARD STANDARD PER (7.2.13.a) ISO 14120
34 BARREL : Window on Coupling Guard YES
35 CASE : Duplex
36 DIFFUSERS BASEPLATE

37 IMPELLER : Duplex API BASEPLATE NUMBER :


38 IMPELLER WEAR RING : BASEPLATE CONSTRUCTION (7.3.14)
39 CASE WEAR RING : BASEPLATE DRAINAGE (7.3.1)
40 SHAFT: Duplex MOUNTING :
41 Bowl (if VS-type) NON-GROUT CONSTRUCTION : (7.3.13)
42 Inspection Class Level 2 VERTICAL LEVELING SCREWS :

43 BEARINGS AND LUBRICATION (6.10.1.1) LONGITUDINAL DRIVER POSITIONING SCREWS :


44 BEARING (TYPE / NUMBER): (6.11.4) SUPPLIED WITH : l GROUT AND VENT HOLES
45 RADIAL / l DRAIN CONNECTION
46 THRUST / MOUNTING PADS SIZED FOR BASEPLATE LEVELING (7.3.5)
47 MOUNTING PADS TO BE MACHINED (7.3.6)
48 PROVIDE SPACER PLATE UNDER ALL EQUIPMENT FEET
49 LUBRICATION : (6.10.2.2) (6.11.3) (9.6.1) RING OIL OTHER
50 PRESSURE LUBE SYSTEM TO ISO 10438- (9.2.6.5) N/A
51 ISO 10438 DATA SHEETS ATTACHED
52 Pressurized Lube Oil System mtd on pump baseplate N/A REMARKS :
53 Location of Pressurized Lube Oil System mounted on baseplate :
54
55 INTERCONNECTING PIPING PROVIDED BY Supplier
56
57 OIL VISC. ISO GRADE VG
58 CONSTANT LEVEL OILER : REQUIRED
59
60
61
62
63
64
65
66
67
68
69
70
Project No.:

National Iranian South Oil Company DOC. NO.: 151-G1-GS-BC#-PR-DOC -0063


 N.I.S.O.C
Date: 99/05/15

Rev.:B1
PROJECT : EQUIPPING GACHSARAN 1&2 WELLHEAD CLUSTERS TO SPARE
PUMP - CLUSTER 41 Page: 5 of 8

Document Title: DATA SHEET For NEW VERTICAL CRUDE OIL PUMP
1 Note INSTRUMENTATION SEAL SUPPORT SYSTEM MOUNTING Rev

2 SEE ATTACHED API-670 DATA SHEET SEAL SUPPORT SYSTEM MOUNTED ON PUMP BASEPLATE

3 ACCELEROMETER (7.4.2.1) (7.5.1.4) YES


4 Number of Accelerometers 2 IDENTIFY LOCATION ON BASEPLATE
5 Mounting Location of Accelerometers
6 Beaing Housings (one on each) INTERCONNECTING PIPING BY Supplier
7 PROVISION FOR MTG ONLY (6.10.2.10)
8 Number of Accelerometers MECHANICAL SEAL (6.8.1)

9 Mounting Location of Accelerometers SEE ATTACHED ISO 21049/API 682 DATA SHEET
10 ADDITIONAL CENTRAL FLUSH PORT (6.8.9)
11 FLAT SURFACE REQUIRED (6.10.2.11) HEATING JACKET REQ'D. (6.8.11)
12 Number of Accelerometers MECHANICAL SEAL AS PER API 682
13 Mounting Location of Accelerometers PLAN 31/53B
14
15 HEATING AND COOLING (6.1.17)

16 COOLING REQ'D
17 VIBRATION PROBES (7.4.2.2) COOLING WATER PIPING PLAN
18 PROVISIONS FOR VIB. PROBES COOLING WATER PIPING
19 NUMBER PER RADIAL BEARING FITTINGS
20 NUMBER PER AXIAL BEARING COOLING WATER PIPING MATERIALS
21 COOLING WATER REQUIREMENTS:
22 MONITORS AND CABLES SUPPLIED BY (7.4.2.4) BEARING HOUSING
23 HEAT EXCHANGER
24 TEMPERATURE (7.4.2.3) TOTAL COOLING WATER
25 PROVISIONS FOR TEMP PROBES HEATING MEDIUM
26 RADIAL BEARING TEMP. YES OTHER
27 NUMBER PER RADIAL BEARING 1 HEATING PIPING
28 THRUST BEARING TEMP.
29 NUMBER PER THRUST BEARING ACTIVE SIDE PIPING & APPURTENANCES

30 NUMBER PER THRUST BEARING INACTIVE SIDE MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6)
31 TEMP. GAUGES (WITH THERMOWELLS) (9.1.3.6) VENT
32 PRESSURE GAUGE TYPE DRAIN YES
33 Remarks COOLING WATER YES
34 For each bearing housing, one duplex temprature probe TAG ALL ORIFICES (7.5.2.4)
35 is required. SOCKET WELD CONN ON SEAL GLAND (7.5.2.8)
36 Related transmitters and JBs also is required to be supplied by
37 vendor
38
39
40
41
42

43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
Project No.:

National Iranian South Oil Company DOC. NO.: 151-G1-GS-BC#-PR-DOC -0063


 N.I.S.O.C
Date: 99/05/15

Rev.:B1
PROJECT : EQUIPPING GACHSARAN 1&2 WELLHEAD CLUSTERS TO SPARE
PUMP - CLUSTER 41 Page: 6 of 8

Document Title: DATA SHEET For NEW VERTICAL CRUDE OIL PUMP
1 Note SURFACE PREPARATION AND PAINT TEST Rev

2 MANUFACTURER'S STANDARD YES SHOP INSPECTION (8.1.1) Yes

3 OTHER (SEE BELOW) NO PERFORMANCE CURVE


4 SPECIFICATION NO. & DATA APPROVAL PRIOR TO SHIPMENT. YES
5 TEST WITH SUBSTITUTE SEAL (8.3.3.2.b) NO
6 PUMP: MATERIAL CERTIFICATION REQUIRED CASING YES
7 PUMP SURFACE PREPARATION (6.12.1.8) IMPELLER YES
8 PRIMER SHAFT YES
9 FINISH COAT OTHER (Shaft sleeve & Wear rings) YES
10 CASTING REPAIR WELD PROCEDURE APPR REQD YES
11 BASEPLATE: (6.12.2.5) (6.12.3.1)
12 BASEPLATE SURFACE PREPARATION INSPECTION REQUIRED FOR CONNECTION WELDS (6.12.3.4.d)
13 PRIMER: (6.12.3.4.e) MAG PARTICLE YES
14 FINISH COAT RADIOGRAPHY
15 DETAILS OF LIFTING DEVICES YES LIQUID PENETRANT YES
16 ULTRASONIC
17 SHIPMENT: (8.4.1) EXPORT INSPECTION REQUIRED FOR CASTINGS
18 EXPORT BOXING REQUIRED YES MAG PARTICLE YES
19 OUTDOOR STORAGE MORE THAN 6 MONTHS YES RADIOGRAPHY
20 LIQUID PENETRANT YES
21 SPARE ROTOR ASSEMBLY PACKAGED FOR: ULTRASONIC
22 ROTOR STORAGE ORIENTATION (9.2.8.2) HARDNESS TEST REQUIRED (8.2.2.7) (If Required) YES
23 SHIPPING & STORAGE CONTAINER FOR VERT STORAGE (9.2.8.3) ADDNL SUBSURFACE EXAMINATION (6.12.1.5) (8.2.1.3)
24 FOR
25 N2 PURGE (9.2.8.4) METHOD
26 SPARE PARTS PMI TESTING REQUIRED (8.2.2.8) YES
27 START-UP YES COMPONENTS TO BE TESTED
28 NORMAL MAINTENANCE YES
29 WEIGHTS Mass, small RESIDUAL UNBALANCE TEST (J.4.1.2)
30 21/10/2014
31 ITEM No PUMP DRIVER GEAR BASE TOTAL NOTIFICATION OF SUCCESSFUL SHOP
32 0 PERFORMANCE TEST (8.1.1.c) (8.3.3.5) YES
33 0 BASEPLATE TEST (7.3.21)

34 0 HYDROSTATIC WIT
35 HYDROSTATIC TEST OF BOWLS & COLUMN (9.3.13.2) NON-WIT
36 OTHER PURCHASER REQUIREMENTS PERFORMANCE TEST WIT
37 COORDINATION MEETING REQUIRED (10.1.3) YES TEST IN COMPLIANCE WITH (8.3.3.2)
38 MAXIMUM DISCHARGE PRESSURE TO INCLUDE TEST DATA POINTS TO (8.3.3.3)
39 MAX RELATIVE DENSITY YES TEST TOLERANCES TO (8.3.3.4)
40 OPERATION TO TRIP SPEED NPSH (8.3.4.3.1) (8.3.4.3.4) (If Required) WIT
41 MAX DIA. IMPELLERS AND/OR NO OF STAGES NPSH-1ST STG ONLY (8.3.4.3.2)
42 CONNECTION DESIGN APPROVAL
TORSIONAL ANALYSIS (9.2.1.4)
/ REPORT (6.9.2.10) NPSH TESTING
TEST NPSHA TO HI 1.6
LIMITED TO OR ISOSITE
110% 9906NPSHA
(8.3.4.3.3)
(8.3.3.6)
43 PROGRESS REPORTS YES RETEST ON SEAL LEAKAGE (8.3.3.2.d) OBSERVE
44 OUTLINE OF PROC FOR OPTIONAL TESTS (10.2.5) YES RETEST REQUIRED AFTER FINAL HEAD ADJ (8.3.3.7.b)
45 ADDITIONNAL DATA REQUIRING 20 YEARS RETENTION (8.2.1.1) COMPLETE UNIT TEST (8.3.4.4.1)
46 SOUND LEVEL TEST (8.3.4.5) OBSERVE
47 LATERAL ANALYSIS REQUIRED (9.1.3.4) (9.2.4.1.3) CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6)
48 MODAL ANALYSIS REQUIRED (9.3.9.2) LOCATION OF CLEANLINESS INSPECTION
49 DYNAMIC BALANCE ROTOR (6.9.4.4) YES NOZZLE LOAD TEST
50 INSTALLATION LIST IN PROPOSAL (10.2.3.l) YES CHECK FOR CO-PLANAR MOUNTING PAD SURFACES
51 VFD STEADY STATE DAMPED RESPONSE ANALYSIS (6.9.2.3) MECHANICAL RUN TEST UNTIL OIL TEMP STABLE
52 4 HR. MECH RUN AFTER OIL TEMP STABLE (8.3.4.2.1) WIT
53 TRANSIENT TORSIONAL RESPONSE (6.9.2.4) 4 HR. MECH RUN TEST (8.3.4.2.2)
54 BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6) YES
55 IGNITION HAZARD ASSMT TO EN 13463-1 (7.2.13.e) BRG HSG RESONANCE TEST (8.3.4.7)
56 CASING RETIREMENT THICKNESS DRAWING (10.3.2.3) STRUCTURAL RESONANCE TEST (9.3.9.2)
57 FLANGES RQD IN PLACE OF SKT WELD UNIONS (7.5.2.8) REMOVE / INSPECT HYDRODYNAMIC BEARINGS AFTER TEST
58 INCLUDE PLOTTED VIBRATION SPECTRA (6.9.3.3) (9.2.7.5)
59 CONNECTION BOLTING (7.5.1.7) AUXILIARY EQUIPMENT TEST (8.3.4.6) NON-WIT
60 CADMIUM PLATED BOLTS PROHIBITED YES EQUIPMENT TO BE INCLUDED IN AUXILLIARY TESTS
61 VENDOR TO KEEP REPAIR AND HT RCDS (8.2.1.1.c) YES
62 VENDOR SUBMIT TEST PROCEDURES (8.3.1.1) YES LOCATION OF AUXILIARY EQUIPENT TEST
63 SUBMIT INSPECTION CHECK LIST (8.1.5) YES
64 IMPACT TEST (6.12.4.3) PER EN 13445

65 PER ASME SECTION VIII NON-WIT


66 REMOVE CASING AFTER TEST
67
Project No.:

National Iranian South Oil Company DOC. NO.: 151-G1-GS-BC#-PR-DOC -0063


 N.I.S.O.C
Date: 99/05/15

Rev.:B1
PROJECT : EQUIPPING GACHSARAN 1&2 WELLHEAD CLUSTERS TO SPARE
PUMP - CLUSTER 41 Page: 7 of 8

Document Title: DATA SHEET For NEW VERTICAL CRUDE OIL PUMP
1 Note PRESSURE VESSEL DESIGN CODE REFERENCES Rev

2 THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER

3 CASTING FACTORS USED IN DESIGN ( TABLE 3)


4 SOURCE OF MATERIAL PROPERTIES
5
6 WELDING AND REPAIRS

7 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED)
8 ALTERNATE WELDING CODES AND STANDARDS
9 WELDING REQUIREMENT (APPLICABLE CODE OR STANDARD) DEFAULT PER TABLE 11
10 WELDER/OPERATOR QUALIFICATION DEFAULT PER TABLE 11
11 WELDING PROCEDURE QUALIFICATION DEFAULT PER TABLE 11
12 NON-PRESSURE RETAINING STRUCTURAL WELDING SUCH AS BASEPLATES OR SUPPORTS DEFAULT PER TABLE 11
13 MAGNETIC PARTICLE OR LIQUID PENETRANT EXAMINATION OF PLATE EDGES DEFAULT PER TABLE 11
14 POSTWELD HEAT TREATMENT DEFAULT PER TABLE 11
15 POSTWELD HEAT TREATMENT OF CASING FABRICATION WELDS DEFAULT PER TABLE 11
16
17 MATERIAL INSPECTION

18 THESE REFERENCES MUST BE LISTED BY THE PURCHASER DEFAULT TO TABLE 14 YES


19 ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 14) (8.2.2.5)
20 TYPE OF INSPECTION METHOD FOR FABRICATIONS FOR CASTINGS

21 RADIOGRAPHY
22 ULTRASONIC INSPECTION
23 MAGNETIC PARTICLE INSPECTION
24 LIQUID PENETRANT INSPECTION
25 VISUAL INSPECTION (all surfaces)
26
27 REMARKS :
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
Project No.:

National Iranian South Oil Company DOC. NO.: 151-G1-GS-BC#-PR-DOC -0063


 N.I.S.O.C
Date: 99/05/15

Rev.:B1
PROJECT : EQUIPPING GACHSARAN 1&2 WELLHEAD CLUSTERS TO SPARE
PUMP - CLUSTER 41 Page: 8 of 8

Document Title: DATA SHEET For NEW VERTICAL CRUDE OIL PUMP
1 Note Rev
2 REMARKS :
3 Note 1: Valves are required on all vent and drain connections.
4 Note 2: The margin between NPSH available and NPSH required shall be at least 1m.
5 Note 3: NACE MR0175 shall be considered for material selection.
6 Note 4: Wear rings shall be face-hardened.
7 Note 5: Hydraulically mounted coupling hubs may be provided for shafts 50 mm or larger in diameter.
8 Note 6: Two years operating spare parts shall be supplied by vendor.
9 Note 7: Raw test data immediately after test completion shall be submitted to purchaser (or his representative).
10 Processed data shall be furnished within 24 hours if test completed.
11 Note 8: Water contents of oil will be in emulsion form.
12 Note 9: Estimated NPSHA is calculated based on distance between low low liquid level of vessel and pump suction nozzle and will be finalized on detail design
13 Note 10 : Deleted.
14 Note 11 :Deleted.
15 Note 12 : Mechanical Seal:
16 -Double Mechanical Seal
17 -Plan 31 + 53B (vendor to confirm)
18 -Cartridge design
19 -Acc. To API 682 3rd
20 Note 13: Estimate for BHP is 15.1 Kw.
21 Note 14: Selected pump shall be able to transfer maximum capacity.
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70

You might also like