Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Meralco Bill 473128170101 11142022

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

MATEO IMELDA ANGELES BALIWAG BUSINESS CENTER

0187 BE DIKE RD J.P. RIZAL


PUROK 6 CAMBAOG BALIUAG
BUSTOS 3007 BULACAN TIN 000-101-528-000-VAT

(+CODES:SITE:WVGR+FW;METER:WVGR+FW;SOURCE:WVG Billing Statement No.: 2112112849012


Meter No.: 118BAS090314
Route Seq.: 2110 32 0001 Print Seq.: 8458 Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 2034353832 26 Nov 2022
14 Oct 2022 to 13 Nov 2022 14 Nov 2022
Date of Meter Reading Electric Meter Number
13 Nov 2022 118BAS090314 Please Pay
Date of Next Meter Reading Current Reading
13 Dec 2022
Customer Type -
116
Previous Reading
� 141. 51

Residential 90
=
Actual Consumption Bill Computation Summary
Your rate this month 26 kWh Remaining Balance from previous bill 0.00
� 5.44 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 141.51
Please see the back page of your bill for more details about your Generation 181.78
meter reading and consumption. Transmission 21.35
System Loss 16.27
Distribution (Meralco) 21.70
Subsidies -120.55
Your monthly consumption 28.3ºC Government Taxes
Universal Charges
14.22
5.79
Ave. temp this month 0.2 FiT-All (Renewable) 0.95
kWh deg higher than prev.

Total Amount Due � 141.51

kWh 29 6 - 8 - - - 16 1 - 26 -

- - - - - - 15 6 9 - - -

Your typical consumption


7 kWh 0.84 kWh � 4.56
Ave. monthly Ave. daily Ave. daily
consumption consumption cost this bill
(last 12 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
26 kWh 0.0185 tCO * 2 1 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
tLLL9FGZbqX
Cc3RKAC2f4X
2034353832 � 141.51
Zs:ZF:I6GER
ucSZOd80VQP Bfu:equIECFfEJJwUFUuIEIFUw
Payment made after 14 Nov 2022 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 22112569944 Local Application No.: 749812122 Billing Period: 14 Oct 2022 to 13 Nov 2022 Print Seq. 8458 Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
14 Sep-13 Oct 2022 27 Oct 2022 Meralco Online � 5.64 NPC Stranded Contract Costs 0.00
14 Aug-13 Sep 2022 27 Sep 2022 Meralco Online � 5.80 NPC Stranded Debts 26 kWh 0.0428 1.11
14 Aug-13 Sep 2022 13 Sep 2022 Meralco Headquarters � 0.11 DU Stranded Contract Costs 0.00
14 Jul-13 Aug 2022 01 Sep 2022 Meralco Online � 9.54 Equalization Taxes & Royalties 0.00
14 Jul-13 Aug 2022 15 Aug 2022 Meralco Headquarters � 0.25 FiT-All (Renewable) 0.67% 0.95
14 Jun-13 Jul 2022 27 Jul 2022 Asia United - Online � 5.64
FiT-All (Renewable) 26 kWh 0.0364 0.95
What remains unpaid Energy Bill Amount
Base VAT
No unpaid bill, thank you! VAT Sales 121.38 13.39
VAT Zero Rated 0.00

How your bill was computed


Non-VAT 6.74
Total Energy Amount 141.51
Service ID Number: 473128170101
Contract Holder: MATEO IMELDA ANGELES Charges for this billing period � 141.51
Service Address: 0187 BE DIKE RD , PUROK 6, CAMBAOG, BUSTOS
, BULACAN Additional Bill Information
Voltage Level Class : Secondary
Metering Information Your rate this month (price per kWh) is computed as Total Energy Amount
Previous Current divided by the Actual Consumption (in kWh)
Meter Number Reading Reading Multi Registered Note: The average temperature for the month represents the reading from
the PAG-ASA weather station in Quezon City, Metro Manila.
118BAS090314 90 116 1 26 kWh
Rate Components Base Price Amount
Generation 128.46% 181.78
Generation Charge (PhP/kWh) 26 kWh 6.9917 181.78
Power Act Reduction 0.00
Transmission 15.09% 21.35
Transmission Charge(PhP/kWh) 26 kWh 0.8212 21.35
System Loss 11.50% 16.27
System Loss Charge (PhP/kWh) 26 kWh 0.6259 16.27
Distribution (Meralco) 15.33% 21.70
Distribution Charge (PhP/kWh) 26 kWh 0.9803 25.49
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 26 kWh 0.3350 8.71
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 26 kWh 0.4981 12.95
Dist True-Up 1 (PhP/kWh) 26 kWh -0.2761 -7.18
Dist True-Up 2 (PhP/kWh) 26 kWh -0.1923 -5.00
Dist True-Up 3 (PhP/kWh) 26 kWh -0.4669 -12.14
Dist True-Up 4 (PhP/kWh) 26 kWh -0.8656 -22.51
Subsidies -85.19% -120.55
Lifeline Discount 241.10 -50.00% -120.55
Government Taxes 10.05% 14.22
Current RPT (PhP/kWh) 26 kWh 0.0067 0.17
Local Franchise Tax 120.72 0.5500% 0.66
VALUE ADDED TAX
Generation Charge 181.78 11.4900% 20.89
Power Act Reduction 0.00
Transmission Charge 21.35 11.2300% 2.40
System Loss Charge 16.27 11.4700% 1.87
Distribution Charge 21.70 12.0000% 2.60
Subsidies and Others -119.72 12.0000% -14.37
Universal Charges 4.09% 5.79
Missionary Elec for NPC-SPUG 26 kWh 0.1783 4.64
Missionary Elec for REDCI 26 kWh 0.0017 0.04
Environmental Fund 0.00

Tips for hassle free payment Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bills due date and remit the
Bring your electric bill every time you pay payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
these accredited ADA partners.
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Asia United Bank Philippine National Bank Robinsons Bank
Banco de Oro (BDO) Union Bank of the Philippines Citibank
Pay on or before due date Bank of the Philippine Islands (BPI) United Coconut Planters Bank Security Bank

Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5389
(Office hours, Mon-Fri except holidays)

You might also like