Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
86 views

Column DesignAAU

This document provides the design of a reinforced concrete column according to EBCS 2-1995 standards. Material properties of concrete grade C25 and steel grade S300 are specified. Second-order global elastic analysis was used. Dimensions and analysis results are presented. Effective buckling lengths and slenderness ratios were calculated to check limits. Design actions including forces, moments, and eccentricities are determined. Reinforcement ratios are calculated.
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views

Column DesignAAU

This document provides the design of a reinforced concrete column according to EBCS 2-1995 standards. Material properties of concrete grade C25 and steel grade S300 are specified. Second-order global elastic analysis was used. Dimensions and analysis results are presented. Effective buckling lengths and slenderness ratios were calculated to check limits. Design actions including forces, moments, and eccentricities are determined. Reinforcement ratios are calculated.
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

Project Date

Description By
Chkd

COLUMN C1B
- Column Design According to EBCS 2 - 1995.
Lc2
Ib1 1 Ib2

Lb1 Lb2

h
Lc1

b
Ib3 Ib4
column
cross-section
2
Lc3
centerline of
nearby column column elevation
Material Properties
Concrete - Grade C-25 Steel - Grade S300
Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PSF 1.15
PSF 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.33 kpa Es 200,000 kpa
Fctd 1,000 kpa As (min) 0.00072 [EBCS-2 7.2.4.2]
Ecm 29,000 kpa [EBCS 2 Table 2.5] As (max) 0.0072 [EBCS-2 7.2.4.2]

Analysis Result: Structure Classification:


Axial Mom. x-x Mom y-y Second-order global elastic analysis
783.20 17.10 21.90 was done. Therefore both sway and
783.20 48.60 51.80 non-sway are taken care of.

Dimensions in x-x direction: Dimensions in y-y direction:


Depth Width Depth Width
B1 = 0.70 0.30 B1 = 1.00 0.30
B2 = 0.70 0.30 B2 = 0.50 0.30
B3 = 0.40 0.30 B3 = 0.40 0.30
B4 = 0.50 0.30 B4 = 0.40 0.30
C1 = 0.30 0.30 C1 = 0.30 0.30
C2 = 0.30 0.30 C2 = 0.30 0.30
C3 = 0.30 0.30 C3 = 0.30 0.30
Lb1 = 5.00 Lb1 = 3.50
Lb2 = 5.00 Lb2 = 5.00
Lc1 = 3.52 Lc1 = 3.52
Lc2 = 3.52 Lc2 = 3.52
Project Date
Description By
Chkd

Lc3 = 3.00 Lc3 = 3.00

Limits of Slenderness:

λ≤50−25
( )
M1
M2
EBCS - 2, 4.4.6

M1 M1
= 0.352 = 0.423
M2 M2

λ≤ 41.204 λ≤ 39.431

But, the slenderness ratio is:

√ Ig
Le Ag = 0.090
l= i = Radius of gyration = Ig = 0.001 EBCS-2, 4.4.5
i Ag
= 0.087

Le =Effective buckling length

Effective Buckling Length:

I c 1 / L c 1 + I c 2 / Lc 2
α m +0 . 4 α1 =
Le = L≥0 . 7 L I b 1 / Lb 1 + I b 2 / Lb 2
α m +0 . 8
α +α I c 1 / Lc 1 + I c 3 / Lc 3
α m= 1 2 α 2=
I b 3 / Lb 3 + I b 4 / Lb 4
2
About x-x direction. About y-y direction.
Ic1 = 0.00068 Ic1 = 0.00068 Ic1 = 0.00068 Ic1 = 0.00068
Ic2 = 0.00068 Ic3 = 0.00068 Ic2 = 0.00068 Ic3 = 0.00068
Ib1 = 0.00858 Ib3 = 0.00160 Ib1 = 0.02500 Ib3 = 0.00160
Ib2 = 0.00858 Ib4 = 0.00313 Ib2 = 0.00313 Ib4 = 0.00160
a1 = 0.112 a2 = 0.441 a1 = 0.049 a2 = 0.536
am = 0.276 am = 0.293

- the effective buckling length:

Le = 2.212 Le = 2.232

- Slenderness ratio:

l= 25.541 Not Slender l = 25.768 Not Slender


Project Date
Description By
Chkd

Ignore Secondary Effects Ignore Secondary


Effect

Design Actions:

Calculate Eccentricities in the x-x Direction Calculate Eccentricities in the y-y Direction

Total = e tot =e e +e a +e 2 Total = e tot =e e +e a +e 2

ee = max of 0.6e02 + 0.4e01 ee = max of 0.6e02 + 0.4e01


0.4e02 0.4e02

e01 = 0.0218 e01 = 0.0280


e02 = 0.0621 e02 = 0.0661

ee = 0.0460 ee = 0.0509
Le Le
ea = ≥200 mm ea = ≥200 mm
300 300
= 0.02 = 0.02

e2 = 0.00 e2 = 0.00

etot = 0.0660 etot = 0.0709

Nsd = 783.200 kn
Msd x-x = 51.664 kn-m
Msd y-y = 55.504 kn-m

Reinforcement Calculation:

Cover ratio = 0.1

N sd M sd , x −x M sd , y− y
υ sd = μsd , x −x= μsd , y− y =
f cd A c f cd A c h f cd A c b

nsd = 0.8 msd,x-x = 0.169 msd,y-y = 0.181

w = 0.74 EBCS 2 - 1995: Part 2 Biaxial Chart No. 10

ωA c f cd
A s, tot =
f yd
Project Date
Description By
Chkd

As,tot = 0.002893 m2
As,tot/8 = 0.000362 m2

Use 8 f 24 bars
Ignore Secondary

You might also like