2. LEVEL SHOWN ARE TO BE TOP OF STRUCTURAL MEMBER AND ARE GIVEN IN METER
1 2 3 RELATED TO LOCAL DATUM.
625
20/20/SRC 260 kg/m³ 0.60 20
BLINDING
CONCRETE UPSTAND
1 BELOW
45/20/SRC 370 kg/m³ 0.42 45
910
FOR WATER TANK GROUND
600
- - CAPACITY2500 LITRES ABOVE
35/20/OPC 350 kg/m³ 0.45 35
1900
GROUND
A RS1 A
300THK RAFT SLAB - - - - 7. BLOCKS ARE TO ATTAIN A MINIMUM STRENGTH OF 7 N/mm² WHEN TESTED
WITH T12-150EW (T&B) ACCORDING TO THE REQUIREMENT OF BS 2028 APPENDIX "F" MORTAR SHALL BE
RS1 +3.125 1:5 WITH PLASTICISER UNLESS OTHERWISE SPECIFIED.
SB1
SB2
T.O.P.
3800
3800
1900
8. POLYTHENE SHALL BE SINGLE SHEET MEMBRANE WITH MIN. THICKNESS OF 1000 GUAGE
+0.200 END LAPS SHALL BE 250mm MIN.DOUBLE LAPPED
SSL
SB1
3.000 9. THE CONTRACTOR'S PROPOSED ARRANGEMENTS OF CONSTRUCTION JOINTS ARE
SSL SUBJECT TO APPROVAL BY THE S.O. UNLESS NOTED OTHERWISE.
BOUNDARY WALL
10. CEMENT FOR SUB-STRUCTURES SHALL BE SULPHATE RESISTING CEMENT. FOR SUPER
FOOTING
1900
STRUCTURES, OPC CEMENT UNLESS OTHERWISE SPECIFIED.
1925 2900 11. WHERE REQUIRED BAR BENDING SCHEDULE SHALL BE PREPARED BY THE
1 CONTRACTOR AND SHALL BE SUBMITTED TO THE CLIENT FOR RECORD.
- - 12. THE FOUNDATION IS DESIGNED FOR SAFE BEARING CAPACITY OF 100 kN/m².
13. BARS MARKED 'T' TO BE HIGH TENSILE DEFORMED BAR TYPE - 2 CONFORMING TO
B B BS 4449.
SB1 SB1 14. FABRIC REINFORCEMENT TO BE BS 4483 WITH MIN. LAP OF 250mm IN EACH
DIRECTION UNLESS OTHERWISE SPECIFIED .
15. APPROVED P.C. CONCRETE/ PLASTIC SPACERS ONLY SHALL BE USED FOR ALL R . C .
WORKS.
17. CLEAR COVER TO REINFORCEMENT TO BE AS FOLLOWS:
SLAB THICKENING - 75mm
T.O.P.
150 SCHEDULE OF R.C. BEAMS CABLES IF FOUND SHALL BE RELOCATED. ALL EXCAVATIONS ADJACENT TO THE
EXISTING FOUNDATIONS SHALL BE DONE CAREFULLY AND ENSURE THAT IT IS NOT
DISTURBED.
UPSTAND FOR BOTTOM TOP 22. ALL THE EXISTING SERVICES SHALL NOT BE DISTURBED DURING CONSTRUCTION AND
200 THK. INSITU SLAB SIZE
WATER TANK BEAM REINFORCEMENT REINFORCEMENT RELOCATION IF ANY, SERVICES ARE REQUIRED, IT SHALL BE UNDERTAKEN BY THE
LINKS REMARKS CONTRACTOR.
TYPE WIDTH DEPTH MID CONT END
SPAN SUPPORT 23. ALL SCAFOLDINGS USED DURING CONSTRUCTION SHALL COMPLY WITH RELEVANT
( mm ) ( mm ) SPAN SUPPORT SUPPORT BS STANDARDS.
150
SSL
T8 - 200 24. DEAD LOAD OF WATER TANK WITH BASE & A/C UNITS WITH BASE SHALL BE
SB1 325 520 3 T20 3 T16 3 T16 3 T20 3 T16 (3 LEGGED) - CONSIDERED IN THE DESIGN OF ROOF HOLLOW CORE SLAB.
T8 - 150 1T16E.F
SB2 250 520 2T20 + 2T20 2 T20 2 T20 2T20 + 2T20 2 T20 (3 LEGGED)
SECTION -
A -
T.O.P. 150
+4.150
A 06.01.2021 ISSUED FOR TENDER HM
UPSTAND
T12-200
200 THK. INSITUSLAB
+3.00
250
4T20
T8-150 LINKS
250 INTERNATIONAL
Consulting Engineers to the Energy Sector
P.O. Box 5922, Manama, Kingdom of Bahrain
COLUMN 'SC' Tel: (+973) 1770 8118 Fax: (+973) 1770 0115
SCALE:- 1:20
Rev
HM TMS 1262 ST-HIDD-01
c