CIVIL/STRUCTURAL

OVERTURNING MOMENT CALCULATION

Project: Shell - Fourchon Junction Eng. By: jsb


Subject: Check By:

OVERTURN
S.NO Code Description Height (ft) Width (ft) Length (ft)

1 OFFBLD OFFICE BUILDING 10 12 40


2 MCCBLD MCC BUILDING 10 12 40.5
3 MEABLD SHELL MEASUREMENT BUILDING 8.5 8 10
4 SSTBLD SHELL STORAGE BUILDING 8.5 8 16
5 EGEN Emergency Generator 8 9 12
6 AIRCOM Air Compressor 9 6.75 9
7 CHVMET Chevron Metering Skid 1.03 13.00 41.00
8 CHVPRO Chevron Meter Prover Skid 1.33 10.00 45.00
9 FWTANK Freshwater Tank 0.83 8.67 11.67
10 WATDRW Water Draw Unit 7.875 15 5
11 AMBJCK Amberjack Meter Skid 1.2 17.761 48
12 CSTBLD Chevron Storage Building 8.5 10 8
13 DRASKD DRA Storage Skid 8.5 8 40

NOTE:
* The above marked in red one is not included in STAAD model
Doc No.:
Rev:

Project No: 023356-001


Date: 07/27/23
Date:

OVERTURNING MOMENT CALCULATION


X in STAAD Z in STAAD Shape Gust For Transverse area
Wind pressure (psf)
Transverse Area (ft ) Longitudinal Area (ft2) coefficenet(Cf)
2 Factor (g) Shear Force
120 400 2 107.11 0.85 21850.44
120 405 2 107.11 0.85 21850.44
68 85 2 101.84 0.85 11772.70
68 136 2 101.84 0.85 11772.70
72 96 2 101.84 0.85 12465.22
60.75 81 2 107.11 0.85 11061.79
13.33 42.03 2 98.33 0.85 2227.42
13.31 59.90 2 101.84 0.85 2304.33
7.22 9.72 2 101.84 0.85 1249.92
118.125 39.38 2 101.84 0.85 20450.75
21.313 57.60 2 101.84 0.85 3689.91
85 68.00 2 101.84 0.85 14715.88
68 340.00 2 101.84 0.85 11772.704
For Transverse area For Longitudinal area
lb Kips Shear Force lb Kips
3641.74 3.642 72834.80 12139.13 12.139
3641.74 3.642 73745.24 12290.87 12.291
2943.18 2.943 14715.88 3678.97 3.679
2943.18 2.943 23545.41 5886.35 5.886
3116.30 3.116 16620.29 4155.07 4.155
2765.45 2.765 14749.05 3687.26 3.687
371.24 0.371 7024.94 1170.82 1.171
384.06 0.384 10369.50 1728.25 1.728
312.48 0.312 1682.56 420.64 0.421
5112.69 5.113 6816.92 1704.23 1.704
230.62 0.231 9972.17 623.26 0.623
3678.97 3.679 11772.70 2943.18 2.943
1962.12 1.962 58863.52 9810.59 9.811
CIVIL/STRUCTURAL
WIND LOAD ON PIPES AND CABLE TRAYS

Project: Shell - Fourchon Junction Eng. By:


Subject: PS3000 Check By:

1.0 INTRODUCTION
- This spreadsheet is for calculating the wind load on piping and cable tray
- Wind loads are calculated per ASCE 7-16
- If used for ASCE 7-10, Ground elevation should be set as 0, so Ke = 1.0 (New factor added with ASC

2.0 CODES AND STANDARDS


- ASCE 7-16 Minimum Design Loads and Associated Criteria for Buildings and Other Structure
- ASCE Wind Loads for Petrochemical and Other Industrial Facilities - 2011

3.0 WIND LOAD INFORMATION

Risk Category = IV
Design speed (mph) = 190
Exposure Category D
Topographic factor, Kzt = 1.00
Wind directionality factor, Kd = 0.95
Ground elevation above sea level, zg (ft) = 0
Ground elev. factor, Ke = e^(-0.0000362*zg) = 1.00
Gust factor, Gf = 0.85

Velocity pressure, qz: qz = 0.00256 * Kz * Kzt * Kd * Ke * V2


0.00256*Kz*1*0.95*1*190^2 = 87.80

qz Values for height hz (Without Cf) (With Cf-Steel)


Height hz (ft) Kz for height hz qz for qz*G Cf*qz*G
from ground (Exposure D) hz(psf) for hz(ksf) for hz(ksf)
15 1.03 90.43 0.077 0.138
20 1.08 94.82 0.081 0.145
25 1.12 98.33 0.083 0.150
30 1.16 101.84 0.087 0.156
40 1.22 107.11 0.091 0.164
50 1.27 111.50 0.095 0.171
60 1.31 115.01 0.098 0.176
70 1.34 117.65 0.100 0.180
80 1.38 121.16 0.103 0.185
90 1.40 122.91 0.104 0.188
100 1.43 125.55 0.107 0.192
120 1.48 129.94 0.111 0.199
140 1.52 133.45 0.113 0.204
160 1.55 136.08 0.116 0.208
180 1.58 138.72 0.118 0.212
200 1.61 141.35 0.120 0.216

4.0 WIND LOAD ON PIPES & CABLE TRAY


Dp = Largest pipe diameter with insulation or Height of Cable Tray
Width of rack/support, W = 3.92 ft Description:
Height Above Ground, hz = 39.86 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 63.69 9.92
(Pipe)
(Pipe)
(Pipe)

Width of rack/support, W = 3.92 ft Description:


Height Above Ground, hz = 39.86 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 63.69 16.60
(Pipe)
(Pipe)
(Pipe)

Width of rack/support, W = 16.83 ft Description:


Height Above Ground, hz = 43.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 12.38
(Pipe) 16.00 0.70 64.67 12.38
(Pipe) 20.00 0.70 64.67 12.38
(Pipe)
Width of rack/support, W = 16.67 ft Description:
Height Above Ground, hz = 43.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 12.29
(Pipe) 16.00 0.70 64.67 12.94
(Pipe) 20.00 0.70 64.67 12.94
(Pipe) 20.00 0.70 64.67 12.94

Width of rack/support, W = 16.67 ft Description:


Height Above Ground, hz = 43.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 17.90
(Pipe) 16.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90

Width of rack/support, W = 16.83 ft Description:


Height Above Ground, hz = 43.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 17.90
(Pipe) 16.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
(Pipe) 12.75 0.70 62.98 14.56
(Pipe) 12.75 0.70 62.98 14.56

Width of rack/support, W = 16.83 ft Description:


Height Above Ground, hz = 43.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 17.90
(Pipe) 16.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
(Pipe) 12.75 0.70 62.98 14.56
(Pipe) 12.75 0.70 62.98 14.56

Width of rack/support, W = 8.67 ft Description:


Height Above Ground, hz = 43.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 20.00
(Cable Tray)
(Pipe)
(Pipe)

Width of rack/support, W = 8.67 ft Description:


Height Above Ground, hz = 43.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 20.00
(Pipe)
(Pipe)
(Pipe)

Width of rack/support, W = 10.63 ft Description:


Height Above Ground, hz = 37.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 62.98 8.00
(Pipe) 20.00 0.70 62.98 12.50
(Pipe)
(Pipe)

Width of rack/support, W = 10.63 ft Description:


Height Above Ground, hz = 37.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 62.98 10.67
(Pipe) 16.00 0.70 62.98 10.67
(Pipe)
(Pipe)
Width of rack/support, W = 11.56 ft Description:
Height Above Ground, hz = 41.94 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 12.75 0.70 64.24 2.86
(Pipe) 12.75 0.70 64.24 5.28
(Pipe)
(Pipe)

Width of rack/support, W = 9.90 ft Description:


Height Above Ground, hz = 37.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 62.98 13.33
(Pipe) 20.00 0.70 62.98 10.67
(Pipe) 16.00 0.70 62.98 10.67
(Pipe)

Width of rack/support, W = 8.56 ft Description:


Height Above Ground, hz = 37.61 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 62.98 13.33
(Pipe) 16.00 0.70 62.98 10.67
(Pipe)
(Pipe)

Width of rack/support, W = 8.83 ft Description:


Height Above Ground, hz = 46.94 ft Kz =

Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 65.54 29.42
(Pipe)
(Pipe)
(Pipe)

Width of rack/support, W = 8.67 ft Description:


Height Above Ground, hz = 42.53 ft Kz =
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.39 9.38
(Pipe) 16.00 0.70 64.39 5.41
(Pipe)
(Pipe)
URAL Doc No.: SCA-SE-0208
D CABLE TRAYS Rev: 1

Project No: 023356-001


jsb Date: 05/02/23
Date:

d cable tray

o Ke = 1.0 (New factor added with ASCE 7-16)

teria for Buildings and Other Structures - 2016


ndustrial Facilities - 2011

(Table 1.5-1, ASCE 7-16)


(Fig. 26.5-1 A/B/C/D, ASCE 7-16)

(cl. 26.8.2, ASCE 7-16)


(Table 26.6-1, ASCE 7-16)
NOTE: Ground elevation = 0, If used for ASCE 7-10
(Table 26.9-1, ASCE 7-16)
(cl: 26.11.1, ASCE 7-16)
**** COPY AND PASTE IN STAAD UNDER WIND DEFINITION
(cl. 26.10, ASCE 7-16) INT 0.077 0.077 0.081 0.083 0.087 0.091 0.095 0.098 0.1 0.103
* Kz (psf) 0.111 0.113 0.116 0.118 0.12 HEIG 0 15 20 25 30 40 50 60 70 8
140 160 180 200
(Table 26.10-1, ASCE 7-16)
qz*G Height hz (ft)
for hz(ksi) from ground
0.000535 15
0.000562 20
0.000576 Force Coefficient 25
0.000604 STEEL, Cf-Steel = 1.80 30
0.000632 PIPE, Cf-Pipe = 0.70 40
0.000660 CABLE TRAY, Cf-Tray = 2.00 50
0.000681 60
0.000694 70
0.000715 80
0.000722 90
0.000743 100
0.000771 120
0.000785 140
0.000806 160
0.000819 180
0.000833 200

(cl: 5.1.1 & 5.1.2, ASCE Wind for Petro. Faci.)

PS1019
1.22 qz (psf) = 107.04 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.06 20.41 1.300

PS1022
1.22 qz (psf) = 107.04 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.06 34.17 2.176
Largest Value Controls

PS1020 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
3.02 37.33 2.414
3.02 37.33 2.414 Largest Value Controls
3.35 41.46 2.681
PS1024 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
3.00 36.88 2.385
3.00 38.81 2.510 Largest Value Controls
3.33 43.13 2.789
3.33 43.13 2.789

PS2001 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
3.00 53.69 3.472
2.40 42.88 2.700
2.73 48.84 3.076
2.73 48.84 3.076

PS2005 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
3.00 53.69 3.472
2.40 42.88 2.700 Largest Value Controls
2.73 48.84 3.076
2.73 48.84 3.076
2.13 30.95 1.949
2.13 30.95 1.949

PS2000 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
3.00 53.69 3.472
2.40 42.88 2.700
2.73 48.84 3.076
2.73 48.84 3.076
2.13 30.95 1.949
2.13 30.95 1.949

PS3004 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.20 44.00 2.846
Largest Value Controls

PS3000 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2 kip Dp = Height of Cable Tray
2.20 44.00 2.846
Largest Value Controls

PS3004-LOWER -1
1.21 qz (psf) = 105.85 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2 kip Dp = Height of Cable Tray
2.73 21.83 1.375
2.73 34.11 2.149 Largest Value Controls

PS3004 - LOWER -2
1.21 qz (psf) = 105.85 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2 kip Dp = Height of Cable Tray
2.73 29.11 1.833
2.40 25.56 1.610 Largest Value Controls
PS3006 - UPPER
1.23 qz (psf) = 107.96 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.22 6.35 0.408
2.22 11.71 0.752 Largest Value Controls

PS3006 - LOWER
1.21 qz (psf) = 105.85 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.66 35.42 2.231
2.66 28.33 1.784
2.32 24.78 1.561

PS3007
1.21 qz (psf) = 105.85 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.66 35.42 2.231
2.32 24.78 1.561 Largest Value Controls

PS3008
1.25 qz (psf) = 110.16 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.22 65.22 4.275
Largest Value Controls

PS2002
1.23 qz (psf) = 108.22 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2 kip Dp = Height of Cable Tray
2.20 20.64 1.329
2.20 11.89 0.766 Largest Value Controls
n = 0, If used for ASCE 7-10

N STAAD UNDER WIND DEFINITION


83 0.087 0.091 0.095 0.098 0.1 0.103 0.104 0.107 -
.12 HEIG 0 15 20 25 30 40 50 60 70 80 90 100 120 -

26.10-1, ASCE 7-16)


Kz for height hz Kz for height hz Kz for height hz
(Exposure B) (Exposure C) (Exposure D)
0.57 0.85 1.03
0.62 0.90 1.08
0.66 0.94 1.12
0.70 0.98 1.16
0.76 1.04 1.22
0.81 1.09 1.27
0.85 1.13 1.31
0.89 1.17 1.34
0.93 1.21 1.38
0.96 1.24 1.40
0.99 1.26 1.43
1.04 1.31 1.48
1.09 1.36 1.52
1.13 1.39 1.55
1.17 1.43 1.58
1.20 1.46 1.61

eter with insulation

eter with insulation

eter with insulation


eter with insulation

eter with insulation

eter with insulation

eter with insulation


eter with insulation

eter with insulation

eter with insulation

eter with insulation


eter with insulation

eter with insulation

eter with insulation

eter with insulation


eter with insulation
CIVIL/STRUCTURAL
OVERTURNING MOMENT CALCULATION

Project: Shell - Fourchon Junction Eng. By:


Subject: Check By:

S.NO Code Description Height (ft) Width (ft) Length (ft)

1 OFFBLD OFFICE BUILDING 10 12 40


2 MCCBLD MCC BUILDING 10 12 40.5
3 MEABLD SHELL MEASUREMENT BUILDING 8.5 8 10
4 SSTBLD SHELL STORAGE BUILDING 8.5 8 16
5 EGEN Emergency Generator 8 9 12
6 AIRCOM Air Compressor 9 6.75 9
7 CHVMET Chevron Metering Skid 1.03 13.00 41.00
8 CHVPRO Chevron Meter Prover Skid 1.33 10.00 45.00
9 FWTANK Freshwater Tank 0.83 8.67 11.67
10 WATDRW Water Draw Unit 7.875 15 5
11 AMBJCK Amberjack Meter Skid 1.2 17.761 48
12 CSTBLD Chevron Storage Building 8.5 10 8
13 DRASKD DRA Storage Skid 8.5 8 40

NOTE:
* The above marked in red one is not included in STAAD model
Doc No.:
Rev:

Project No: 023356-001


Date: 07/28/23
Date:

OVERTURNING MOMENT CALCULATION

X in STAAD Z in STAAD Shape


Wind pressure (psf) Gust Factor (g)
coefficenet(Cf)

Transverse Area (ft2) Longitudinal Area (ft2)


120 400 2 107.11 0.85
120 405 2 107.11 0.85
68 85 2 101.84 0.85
68 136 2 101.84 0.85
72 96 2 101.84 0.85
60.75 81 2 107.11 0.85
13.33 42.03 2 98.33 0.85
13.31 59.90 2 101.84 0.85
7.22 9.72 2 101.84 0.85
118.125 39.38 2 101.84 0.85
21.313 57.60 2 101.84 0.85
85 68.00 2 101.84 0.85
68 340.00 2 101.84 0.85
Transverse
For Transverse area For Longitudinal area Overturning
moment
Kip-in

Shear Force lb Kips Shear Force lb Kips in Kip-in


21850.44 10925.22 10.925 72834.80 24278.27 24.278 120 655.51
21850.44 10925.22 10.925 73745.24 24581.75 24.582 120 655.51
11772.70 5886.35 5.886 14715.88 7357.94 7.358 102 300.20
11772.70 5886.35 5.886 23545.41 11772.70 11.773 102 300.20
12465.22 6232.61 6.233 16620.29 8310.14 8.310 96 299.17
11061.79 5530.89 5.531 14749.05 7374.52 7.375 108 298.67
2227.42 1113.71 1.114 7024.94 2341.65 2.342 12.3 6.85
2304.33 1152.17 1.152 10369.50 3456.50 3.457 15.972 9.20
1249.92 624.96 0.625 1682.56 841.28 0.841 9.996 3.12
20450.75 10225.37 10.225 6816.92 3408.46 3.408 94.5 483.15
3689.91 922.48 0.922 9972.17 2493.04 2.493 14.4 6.64
14715.88 7357.94 7.358 11772.70 5886.35 5.886 102 375.25
11772.704 5886.35 5.886 58863.52 19621.17 19.621 102 300.20
Longitudinal
Overturning
moment
Kip-in

in Kip-in
120 1456.7
120 1474.9
102 375.3
102 600.4
96 398.9
108 398.2
12.3 14.4
15.972 27.6
9.996 4.2
94.5 161.0
14.4 17.9
102 300.2
102 1000.7
SACS STAAD 0.00125
Dead
Handrail 8.743795 8.72004
Grating
Equipment /Building,Dead
Equipment /Building,Operating
Wind X
Wind -X
Wind Z
Wind -Z
Live/Access
182 378.336 21 581.336 6976.032 8.72004