Calculation Spread Sheet
Calculation Spread Sheet
Calculation Spread Sheet
OVERTURN
S.NO Code Description Height (ft) Width (ft) Length (ft)
NOTE:
* The above marked in red one is not included in STAAD model
Doc No.:
Rev:
1.0 INTRODUCTION
- This spreadsheet is for calculating the wind load on piping and cable tray
- Wind loads are calculated per ASCE 7-16
- If used for ASCE 7-10, Ground elevation should be set as 0, so Ke = 1.0 (New factor added with ASC
Risk Category = IV
Design speed (mph) = 190
Exposure Category D
Topographic factor, Kzt = 1.00
Wind directionality factor, Kd = 0.95
Ground elevation above sea level, zg (ft) = 0
Ground elev. factor, Ke = e^(-0.0000362*zg) = 1.00
Gust factor, Gf = 0.85
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 63.69 9.92
(Pipe)
(Pipe)
(Pipe)
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 63.69 16.60
(Pipe)
(Pipe)
(Pipe)
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 12.38
(Pipe) 16.00 0.70 64.67 12.38
(Pipe) 20.00 0.70 64.67 12.38
(Pipe)
Width of rack/support, W = 16.67 ft Description:
Height Above Ground, hz = 43.61 ft Kz =
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 12.29
(Pipe) 16.00 0.70 64.67 12.94
(Pipe) 20.00 0.70 64.67 12.94
(Pipe) 20.00 0.70 64.67 12.94
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 17.90
(Pipe) 16.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 17.90
(Pipe) 16.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
(Pipe) 12.75 0.70 62.98 14.56
(Pipe) 12.75 0.70 62.98 14.56
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 17.90
(Pipe) 16.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
(Pipe) 20.00 0.70 62.98 17.90
(Pipe) 12.75 0.70 62.98 14.56
(Pipe) 12.75 0.70 62.98 14.56
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 20.00
(Cable Tray)
(Pipe)
(Pipe)
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 64.67 20.00
(Pipe)
(Pipe)
(Pipe)
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 62.98 8.00
(Pipe) 20.00 0.70 62.98 12.50
(Pipe)
(Pipe)
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 62.98 10.67
(Pipe) 16.00 0.70 62.98 10.67
(Pipe)
(Pipe)
Width of rack/support, W = 11.56 ft Description:
Height Above Ground, hz = 41.94 ft Kz =
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 12.75 0.70 64.24 2.86
(Pipe) 12.75 0.70 64.24 5.28
(Pipe)
(Pipe)
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 62.98 13.33
(Pipe) 20.00 0.70 62.98 10.67
(Pipe) 16.00 0.70 62.98 10.67
(Pipe)
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 20.00 0.70 62.98 13.33
(Pipe) 16.00 0.70 62.98 10.67
(Pipe)
(Pipe)
Dp Cf qz * G * C f Pipe Span, L
in psf ft
(Pipe) 16.00 0.70 65.54 29.42
(Pipe)
(Pipe)
(Pipe)
d cable tray
PS1019
1.22 qz (psf) = 107.04 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.06 20.41 1.300
PS1022
1.22 qz (psf) = 107.04 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.06 34.17 2.176
Largest Value Controls
PS1020 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
3.02 37.33 2.414
3.02 37.33 2.414 Largest Value Controls
3.35 41.46 2.681
PS1024 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
3.00 36.88 2.385
3.00 38.81 2.510 Largest Value Controls
3.33 43.13 2.789
3.33 43.13 2.789
PS2001 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
3.00 53.69 3.472
2.40 42.88 2.700
2.73 48.84 3.076
2.73 48.84 3.076
PS2005 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
3.00 53.69 3.472
2.40 42.88 2.700 Largest Value Controls
2.73 48.84 3.076
2.73 48.84 3.076
2.13 30.95 1.949
2.13 30.95 1.949
PS2000 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
3.00 53.69 3.472
2.40 42.88 2.700
2.73 48.84 3.076
2.73 48.84 3.076
2.13 30.95 1.949
2.13 30.95 1.949
PS3004 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.20 44.00 2.846
Largest Value Controls
PS3000 - UPPER
1.24 qz (psf) = 108.69 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2 kip Dp = Height of Cable Tray
2.20 44.00 2.846
Largest Value Controls
PS3004-LOWER -1
1.21 qz (psf) = 105.85 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2 kip Dp = Height of Cable Tray
2.73 21.83 1.375
2.73 34.11 2.149 Largest Value Controls
PS3004 - LOWER -2
1.21 qz (psf) = 105.85 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2 kip Dp = Height of Cable Tray
2.73 29.11 1.833
2.40 25.56 1.610 Largest Value Controls
PS3006 - UPPER
1.23 qz (psf) = 107.96 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.22 6.35 0.408
2.22 11.71 0.752 Largest Value Controls
PS3006 - LOWER
1.21 qz (psf) = 105.85 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.66 35.42 2.231
2.66 28.33 1.784
2.32 24.78 1.561
PS3007
1.21 qz (psf) = 105.85 Table Row 4
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.66 35.42 2.231
2.32 24.78 1.561 Largest Value Controls
PS3008
1.25 qz (psf) = 110.16 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2
kip Dp = Height of Cable Tray
2.22 65.22 4.275
Largest Value Controls
PS2002
1.23 qz (psf) = 108.22 Table Row 5
Width of Analysis Projected Area Wind Load
(0.1 * W) + Dp (0.1 * W + Dp) * L qz * G * Cf * Ap Dp = Largest pipe diameter with insulation
ft Ap, ft2 kip Dp = Height of Cable Tray
2.20 20.64 1.329
2.20 11.89 0.766 Largest Value Controls
n = 0, If used for ASCE 7-10
NOTE:
* The above marked in red one is not included in STAAD model
Doc No.:
Rev:
in Kip-in
120 1456.7
120 1474.9
102 375.3
102 600.4
96 398.9
108 398.2
12.3 14.4
15.972 27.6
9.996 4.2
94.5 161.0
14.4 17.9
102 300.2
102 1000.7
SACS STAAD 0.00125
Dead
Handrail 8.743795 8.72004
Grating
Equipment /Building,Dead
Equipment /Building,Operating
Wind X
Wind -X
Wind Z
Wind -Z
Live/Access
182 378.336 21 581.336 6976.032 8.72004