Revised Excavation Permit
Revised Excavation Permit
Revised Excavation Permit
PERFORMANCE STANDARDS
Due Date
Final Output Success indicator 5 4 3 2 1
(Timeline)
Outstanding Very Satisfactory Satisfactory Unsatisfactory Poor
7A Issued Excavation Permits
in accordance with D.O. 26 s not in accordance with D.O. 26
Q - - -
100% Initial Evaluation/Assessment of all submitted documents by 2011 s 2011
7A.1 Public/Private utility agencies for Excavation Permit Applications
E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 70% Below
conducted in accordance with D.O. 26 s 2011 in 1 wd
T 4 hrs 6 hrs 1 wd 2 wd 3 wd
100% Joint Site Inspection/Verification with the Public/Private utility in accordance with D.O. 26 s not in accordance with D.O. 26
Q - - -
agencies to validate actual site conditions of proposed 2011 s 2011
7A.2 excavation/restoration activities as part of the evaluation for
E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 70% Below
Excavation Permit Applications conducted in accordance with D.O. 26 s
2011 in 1 wd T 4 hrs 6 hrs 1 wd 2 wd 3 wd
in accordance with D.O. 26 s not in accordance with D.O. 26
100% Final Evaluation/Assessment of the submitted documents Q - - -
2011 s 2011
relative to the Issuance of Excavation Permit based from the results of
7A.3
the validation on actual site conditions conducted in accordance with E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 70% Below
D.O. 26 s 2011 in 1 wd
T 4 hrs 6 hrs 1 wd 2 wd 3 wd
Q N/A - - - N/A
7A.5 100% Excavation Permits reviewed and signed in 1 wd
E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 99% Below
T 4 hrs 6 hrs 1 wd 2 wd 3 wd
Q N/A - - - N/A
100% Excavation Permits reviewed and recommended for approval in
7A.6
2 hrs E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 99% Below
T 45 mins 1 hr 2 hrs 3 hrs more than 3 hrs
Q N/A - - - N/A
7A.7 100% Excavation Permits approved in 1 hr
E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 99% Below
T 30 mins 45 mins 1 hr 2 hrs more than 2 hrs
### 7B Other Issued Permits/Certifications
Q N/A - - - N/A
100% Initial Evaluation/Assessment of all submitted documents for
7B.1 Drainage/Fence/Building/Sign Clearance/Permit as requested by LGU's E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 99% Below
or concern agencies conducted in 1 wd
T 4 hrs 6 hrs 1 wd 2 wd 3 wd
100% Joint Site Inspection/Verifications with concern agency to Q N/A - - - N/A
validate actual site conditions of various proposed
7B.2 E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 99% Below
Drainage/Fence/Building/Sign as part of the evaluation of the
Permit/Certifications, as scheduled conducted in 1 wd T 4 hrs 6 hrs 1 wd 2 wd 3 wd
Q N/A - - - N/A
100% Final Evaluation/Assessment on the submitted documents
7B.3 E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 99% Below
relative to the issuance of Permit/Clerance conducted in 1 wd
T 4 hrs 6 hrs 1 wd 2 wd 3 wd
Q N/A - - - N/A
100% Other Issued Permits/ Certifications reviewed and signed in 1
7B.5 E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 99% Below
wd
T 4 hrs 6 hrs 1 wd 2 wd 3 wd
Q N/A - - - N/A
100% Other Issued Permis/ Certifications reviewed and recommended
7B.6 E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 99% Below
for approval in 2 hrs
T 45 mins 1 hr 2 hrs 3 hrs more than 3 hrs
Q N/A - - - N/A
7B.7 100% Other Issued Permits/Certification approved in 1 hr E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % 99% Below
Page 1 of 9
MS Database Matrix
Strategic Performance Management System Database
DAVAO CITY DISTRICT ENGINEERING OFFICE
MAINTENANCE SECTION
Database Matrix
PERFORMANCE STANDARDS
Due Date
Final Output Success Indicator 5 4 3 2 1
(Timeline)
Outstanding Very Satisfactory Satisfactory Unsatisfactory Poor
2A Approved
80% Plans,Plans & POWs
Program for Maintenance
of Works Activities
(POW), Detailed Unit Price Analysis
(DUPA), Purchase Request, Approved Budget for the Contract (ABC)
Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
and Project Procurement Management P (PPMP) for implementation of
2A.1
Routine/Roadside Maintenance Activities along National Roads &
E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % Below 70%
Bridges within area of jurisdiction prepared with 4-6 minor error in 28
2D days
Justification on the Remaining Noted Defects by BOM Inspector
ROUTNE/ ROADSIDE not in accordance with the
MAINTENANCE OF 100% Justification including supporting documents on the Remaining In accordance with D.O 41 Series
Q Recommended Action per DO 41
NATIONAL ROADS AND Noted Defects along National Roads and Bridges identified during the 2016 Series 2016
5th day of
BRIDGES 2D.1 BOM Inspection prepared with no error in five (5) working days upon
the week E 100% Below 70%
(Inspection/ Validation) receipt of the Memorandum from the DPWH Secretary, copy furnish
the Regional Office T 5 days 2 weeks
100% Sets of documents relative to the Justification including
supporting documents on the Remaining Noted Defects along National Q N/A N/A
Roads and Bridges identified during the BOM Inspection, reviewed and
2D.2 E 100% Below 70%
signed with no error in five (5) working days upon receipt of the
Memorandum from the DPWH Secretary, copy to furnished the
T 1day 5days
Regional Office
3A Approved Plans & POWs for Maintenance Projects (for funding)
80% Site Inspection conducted to identify affected road sections Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
and/or damaged structures within area of jurisdiction by taking 5th day of
3A.1 E 100% 90-99.99% 80-89.99% 70-79.995 Below 70%
geotagged pictures and collecting pertinent data/details for possible the week
inclusion in the Priority Lists of Maintenance Projects (for funding) T 3 days 4 days 5 days 1 week 2 weeks
80 % Plans, Program of Works (POW), Detailed Unit Price Analysis Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
(DUPA), Geotagged Pictures and other pertinent documents required
1 week/
3A.3 in the requests for possible funding of proposed Maintenance E 100% 90-99.99% 80 - 89.99% 70 - 79.99 % Below 70%
project
Projects along National Roads & Bridges prepared within area of
jurisdiction T 3 days 5 days 1 week 1 week & 2 days 2 weeks
Page 2 of 9
MS Database Matrix
Strategic Performance Management System Database
DAVAO CITY DISTRICT ENGINEERING OFFICE
MAINTENANCE SECTION
Database Matrix
PERFORMANCE STANDARDS
Due Date
Final Output Success Indicator 5 4 3 2 1
(Timeline)
Outstanding Very Satisfactory Satisfactory Unsatisfactory Poor
4.1 Prepare and Submit Maintenance Reports to the Regional Office for consolidation and forwaded to the central office
Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
80% Monthly Reports on the Status of Maintenance Project/s (FCDS,
B. OPB, RWCSF, Solid Waste, etc) with Transmittal prepared & submitted E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % Below 70%
with 4-6 minor error in 1 day
T 3 hours 6 hours 1 day 4days 5days
80% Quarterly Status/Accomplishment Reports (Highway Maintenance Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
APPROVED
### Activity Card or TAD 2.2, RWCSF, RROW & Inventory of Pavement
MAINTENANCE REPORTS C. E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % Below 70%
Markings) with Transmittal prepared & submitted to the Regional
Office with 4-6 minor error in 3 days
T 1 day 2 days 3 days 1wk 2 weeks
Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
80% Other Annual Reports (Inventory of FCDS, OPB & etc) with
E. Transmittal prepared & submittted to the Regional Office with 4-6 E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % Below 70%
minor error in 2 months
T 1 month 1 month & 2 weeks 2 months 2months & 15days 3 months
SUPPORT FUNCTIONS
Q with no erasures with 1 erasure with 2 erasures with 3 erasures with 4 erasures & beyond
11 or incomplete
E 12
12 Daily Time Record submitted with 2 erasures every 22nd day of the submission
Daily Time Records
month & 7th day of the following month
every 22nd day of every 23rd day of
every 21st day of the
every 20th day of the month & the month & 7th day the month & 8th every 24th day of the month &
T month & 6th day of the
5th day of the following month of the following day of the 9th day of the following month
following month
month following month
Q with no error with 1 minor error with 2 minor errors with 3 minor errors with 4 errors & beyond
Individual Performance
1 Individual Performance Commitment and Review Form submitted E N/A N/A N/A
Commitment and Review (Semester)
with 2 minor errors every 2nd week of Jan/July
(IPCR)
every 2nd week of
T every 1st week of Jan/July beyond 7 months
Jan/July
Q N/A N/A N/A
Wearing of Complete
Complete uniform with ID, wore inside office premisses daily E N/A N/A N/A
Uniforms
T Daily
AGREED BY:
Page 3 of 9
MS Database Matrix
Strategic Performance Management System Database
DAVAO CITY DISTRICT ENGINEERING OFFICE
MAINTENANCE SECTION
Database Matrix
PERFORMANCE STANDARDS
Due Date
Final Output Success Indicator 5 4 3 2 1
(Timeline)
Outstanding Very Satisfactory Satisfactory Unsatisfactory Poor
Page 4 of 9
MS Database Matrix
Strategic Performance Management System Database
DAVAO CITY DISTRICT ENGINEERING OFFICE
MAINTENANCE SECTION
Database Matrix
PERFORMANCE STANDARDS
Due Date
Final Output Success Indicator 5 4 3 2 1
(Timeline)
Outstanding Very Satisfactory Satisfactory Unsatisfactory Poor
EMILY OMPOG
ADMINISTRATIVE AIDE I
Page 5 of 9
MS Database Matrix
Strategic Performance Management System Database
DAVAO CITY DISTRICT ENGINEERING OFFICE
MAINTENANCE SECTION
Database Matrix
PERFORMANCE STANDARDS
Due Date
Final Output Success Indicator 5 4 3 2 1
(Timeline)
Outstanding Very Satisfactory Satisfactory Unsatisfactory Poor
2A Approved
80% Plans,Plans & POWs
Program for Maintenance
of Works Activities
(POW), Detailed Unit Price Analysis
(DUPA), Purchase Request, Approved Budget for the Contract (ABC)
Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
and Project Procurement Management P (PPMP) for implementation of
2A.1
Routine/Roadside Maintenance Activities along National Roads &
E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % Below 70%
Bridges within area of jurisdiction prepared with 4-6 minor error in 28
2D days
Justification on the Remaining Noted Defects by BOM Inspector
ROUTNE/ ROADSIDE not in accordance with the
MAINTENANCE OF 100% Justification including supporting documents on the Remaining In accordance with D.O 41 Series
Q Recommended Action per DO 41
NATIONAL ROADS AND Noted Defects along National Roads and Bridges identified during the 2016 Series 2016
5th day of
BRIDGES 2D.1 BOM Inspection prepared with no error in five (5) working days upon
the week E 100% Below 70%
(Inspection/ Validation) receipt of the Memorandum from the DPWH Secretary, copy furnish
the Regional Office T 5 days 2 weeks
100% Sets of documents relative to the Justification including
supporting documents on the Remaining Noted Defects along National Q N/A N/A
Roads and Bridges identified during the BOM Inspection, reviewed and
2D.2 E 100% Below 70%
signed with no error in five (5) working days upon receipt of the
Memorandum from the DPWH Secretary, copy to furnished the
T 1day 5days
Regional Office
3A Approved Plans & POWs for Maintenance Projects (for funding)
80% Site Inspection conducted to identify affected road sections Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
and/or damaged structures within area of jurisdiction by taking 5th day of
3A.1 E 100% 90-99.99% 80-89.99% 70-79.995 Below 70%
geotagged pictures and collecting pertinent data/details for possible the week
inclusion in the Priority Lists of Maintenance Projects (for funding) T 3 days 4 days 5 days 1 week 2 weeks
80 % Plans, Program of Works (POW), Detailed Unit Price Analysis Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
(DUPA), Geotagged Pictures and other pertinent documents required
1 week/
3A.3 in the requests for possible funding of proposed Maintenance E 100% 90-99.99% 80 - 89.99% 70 - 79.99 % Below 70%
project
Projects along National Roads & Bridges prepared within area of
jurisdiction T 3 days 5 days 1 week 1 week & 2 days 2 weeks
Page 6 of 9
MS Database Matrix
Strategic Performance Management System Database
DAVAO CITY DISTRICT ENGINEERING OFFICE
MAINTENANCE SECTION
Database Matrix
PERFORMANCE STANDARDS
Due Date
Final Output Success Indicator 5 4 3 2 1
(Timeline)
Outstanding Very Satisfactory Satisfactory Unsatisfactory Poor
4.1 Prepare and Submit Maintenance Reports to the Regional Office for consolidation and forwaded to the central office
Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
80% Monthly Reports on the Status of Maintenance Project/s (FCDS,
B. OPB, RWCSF, Solid Waste, etc) with Transmittal prepared & submitted E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % Below 70%
with 4-6 minor error in 1 day
###
APPROVED T 3 hours 6 hours 1 day 4days 5days
MAINTENANCE REPORTS
Q No Error 1-3 Minor Errors 4-6 Minor Errors 1-2 Major Errors with 5 Major Errors
80% Other Annual Reports (Inventory of FCDS, OPB & etc) with
E. Transmittal prepared & submittted to the Regional Office with 4-6 E 100% 90 - 99.99% 80 - 89.99% 70 - 79.99 % Below 70%
minor error in 2 months
T 1 month 1 month & 2 weeks 2 months 2months & 15days 3 months
SUPPORT FUNCTIONS
Q with no erasures with 1 erasure with 2 erasures with 3 erasures with 4 erasures & beyond
11 or incomplete
E 12
12 Daily Time Record submitted with 2 erasures every 22nd day of the submission
Daily Time Records
month & 7th day of the following month
every 22nd day of every 23rd day of
every 21st day of the
every 20th day of the month & the month & 7th day the month & 8th every 24th day of the month &
T month & 6th day of the
5th day of the following month of the following day of the 9th day of the following month
following month
month following month
Q with no error with 1 minor error with 2 minor errors with 3 minor errors with 4 errors & beyond
Individual Performance
1 Individual Performance Commitment and Review Form submitted E N/A N/A N/A
Commitment and Review (Semester)
with 2 minor errors every 2nd week of Jan/July
(IPCR)
every 2nd week of
T every 1st week of Jan/July beyond 7 months
Jan/July
Q N/A N/A N/A
Wearing of Complete
Complete uniform with ID, wore inside office premisses daily E N/A N/A N/A
Uniforms
T Daily
AGREED BY:
Page 7 of 9
MS Database Matrix
Strategic Performance Management System Database
DAVAO CITY DISTRICT ENGINEERING OFFICE
MAINTENANCE SECTION
Database Matrix
PERFORMANCE STANDARDS
Due Date
Final Output Success Indicator 5 4 3 2 1
(Timeline)
Outstanding Very Satisfactory Satisfactory Unsatisfactory Poor
Page 8 of 9
MS Database Matrix
Strategic Performance Management System Database
DAVAO CITY DISTRICT ENGINEERING OFFICE
MAINTENANCE SECTION
Database Matrix
PERFORMANCE STANDARDS
Due Date
Final Output Success Indicator 5 4 3 2 1
(Timeline)
Outstanding Very Satisfactory Satisfactory Unsatisfactory Poor
EMILY OMPOG
ADMINISTRATIVE AIDE I
Page 9 of 9