L-S14 11kV SF6 Ring Main Unit (RMU)
L-S14 11kV SF6 Ring Main Unit (RMU)
L-S14 11kV SF6 Ring Main Unit (RMU)
Aug 2012
SPECIFICATION FOR 11 kV
SF6 RING MAIN UNIT
Revision: 1 (2011)
CONTENT
Date: Ogos 2012
Page: 1 of 4
1.1 Scope 1
1.2 Standards 1
1.4 Guarantees 1
2.1 General 1
2.4.1 Type 1
2.5.1 Type 1
Revision: 1 (2011)
CONTENT
Date: Ogos 2012
Page: 2 of 4
4.1 Padlocks 1
4.2 Labelling 1
4.3 Painting 1
5.1 General 1
6.2 Testing 1
6.3 Commissioning 1
Revision: 1 (2011)
CONTENT
Date: Ogos 2012
Page: 3 of 4
8.5.2 Manuals 1
8.5.3 Tools 1
Revision: 1 (2011)
CONTENT
Date: Ogos 2012
Page: 4 of 4
1.0 General
5.0 Busbars
Page: S1/1 of 2
1.1 SCOPE
1.2 STANDARDS
The material, equipment and installation shall conform to the principles of the
standards laid down by the Malaysian Standards (MS), International Electro
technical Commission (IEC) and British Standard Institution (BS). The RMU
shall comply with the latest edition of relevant standards. The standards and/or
relevant parts of standards include but not limiting to as per Section 11.0.
Page: S1/2 of 2
1.4 GUARANTEES
Page: S2/1 of 7
2.1 GENERAL
The RMU equipment shall be suitable for service on an electrical power system
of 11kV, 3-phase, 50 Hz. They shall be of single busbar, metalclad, floor
mounting type provided with integral earthing and testing terminals. They shall
be fully tropicalised and suitable for used at an ambient temperature of 400C
relative humidity up to 100% and at altitude up to 1000 meter above sea level.
Unless otherwise specified, each RMU shall consist of the following equipment
:-
(a) Two SF6 gas-insulated 630A Load Break Switches (LBS) with one
630 A Vacuum Circuit Breaker (VCB)
(b) Earthing switches
(c) 630 A copper busbar fully encapsulated within the SF6 gas tank.
The configuration of RMU shall be extensible consisting of two LBS and one
VCB having provision for adding one number of VCB in future.
Both the load break switch and circuit breaker shall be within the same SF6
tank.
The RMU shall be designed to withstand an internal arc supplied by the rated
short circuit current at 20kA for 1s without any danger to the operator. The gas
generated during the fault shall be released to the rear of the RMU without
affecting the conditions of the front side.
All the above equipment shall be SF6 insulated and housed in cast resin
module or modules hermetically sealed for life at atmospheric pressure or at a
pressure slightly higher than atmospheric pressure so as to minimize the risk of
leakage. The degree of protection of the inner enclosure and the complete
RMU shall be IP67 and IP54 respectively.
The RMU shall be totally safe for operation with fully fool proof interlocking
system and provided with padlocks.
Both LBS and circuit breaker shall be suitable for motorization in future.
Page: S2/2 of 7
The RMU shall be suitable for continuous operation on a 11 kV, 3-phase, 50 Hz,
neutral earthed electrical system with fault level up to 350 MVA for 3 seconds.
The impulse voltage withstand level, on 1.2/50 microsecond, shall not be less
than 75 kV peak.
The various components of the switchgear equipment shall have the following
rating:-
3
SPECIFICATION FOR 11 kV SF6 RING CKE.LS.01.14.(01).2012
MAIN UNIT
(L-S14)
Date: Ogos 1986
Page: S2/3 of 7
(iv) Busbars
3
SPECIFICATION FOR 11 kV SF6 RING CKE.LS.01.14.(01).2012
MAIN UNIT
(L-S14)
Date: Ogos 1986
Page: S2/4 of 7
2.4.1 TYPE
Each LBS shall be of triple pole, gang operated with quick break contacts housed
in a sealed module filled with sulphur hexafluoride (SF6) gas. It shall be provided
with integral feeder earthing equipment without the use of loose accessories.
Each LBS shall be fitted with a direct manually operated mechanism having three
operating positions `ON', `OFF' and `EARTH'. Inadvertent operation from `ON'
direct to `EARTH' or vice versa shall be prevented by a manually operated gate
type mechanical interlocking arrangement of a foolproof design. The interlocks may
operate either in conjunction with the re-location of single operating handle or with
two separate operating handles.
It shall possible to lock the operating mechanism in any of the three positions when
the contacts have fully homed, and also independently lock off the `ON' and
`EARTH' positions. The position `ON', `OFF' and `EARTH' of the switch shall be
clearly indicated such that the direction of movement of the operating handle from
one position to another is readily apparent.
The switch mechanism shall give a quick make and quick break operation to all
positions by the use of one set of springs. The speeds of make and break shall be
independent of the rate of movement of the operating handle and the operator's
strength and skill. In addition, the operating handle shall have an anti-reflex feature
to ensure an inherent delay between the closing and re-opening of either the main
load break switch or the earthing switch.
Page: S2/5 of 7
Each LBS shall be provided with facilities for carrying out applied high voltage tests
and injected current tests on the circuit connected to the earth. These may be
affected by the insertion of a 3 phase testing device when the switch is in `EARTH'
position, to become effective only when the main contacts are in the `OFF'
positions. Alternatively these may take the form of a 3 phase built in test/earth
bushing terminals enclosed within a cover which shall be fully interlocked with the
operating handle to prevent access until the switch is in the `EARTH' position. A
full complement of foolproof mechanical interlocking shall be provided to prevent
the following operations:
The testing facilities shall provide for the attachment of test connection external to
the switch for applied voltage and injected current tests. The test connection shall
be capable of withstanding 25 kV d.c. to earth for 15 minutes and capable of
carrying 630 A continuously.
One set of 3 phase testing device suitable for use with the type of LBS offered
under this Tender shall be provided by the Electrical Contractor whether or not this
item is separately itemized in the Bill of Quantities of the Tender Document.
Page: S2/6 of 7
2.5.1 TYPE
The circuit breaker shall have SF6 as medium of insulation and vacuum as means
of interruption. It shall have mechanical interlocking arrangement and testing
facility. A self-energizing type electronic protection relay complete with protection
CT shall be provided to control the tripping of the circuit breaker.
The standard unit shall use vacuum bottles as interrupters of the currents. The
circuit breaker main circuit is connected in series with a three-position
disconnector-earthing switch, which has no interrupting capacity. The operation
between circuit breaker and disconnector-earthing is interlocked. All mechanisms
shall be situated in the mechanism compartment behind the front covers outside
the SF6-tank. The mechanism for the switch and the earthing switch is operating
both switches via one common shaft. The mechanism for the circuit breaker and
disconnector-earthing switch is operating the circuit breaker and the disconnector-
earthing switch via to separate shafts. The mechanism for the circuit breaker has
stored spring energy and provides independent manual operation for closing and
opening of the circuit breaker. The mechanism has a relay with related CT’s and/or
remote tripping device.
Each circuit breaker shall be provided with facilities for carrying out applied high
voltage tests and injected current tests on the circuit connected to the earth.
These may be affected by the insertion of a 3 phase testing device when the
switch is in `EARTH' position, to become effective only when the main contacts
are in the `OFF' positions.
Page: S2/7 of 7
Alternatively these may take the form of a 3 phase built in test/earth bushing
terminals enclosed within a cover which shall be fully interlocked with operating
handle to prevent access until the switch is in the `EARTH' position. A full
complement of fool proof mechanical interlocking shall be provided to prevent the
following operations:
(a) The opening of the testing access when the switch is in any other then
`EARTH' position.
(b) The Testing device being inserted or withdrawn when the switch is in
any other than `EARTH' position.
(c) The movement of the switch to the `ON'position when the testing
access is open, whether or not the testing device has been inserted.
(d) The movement of the switch away from the `EARTH' position, in
cases where testing entails the removal of an earth connection from
built in test/earth bushing, until the earth connections is restored.
The testing facilities shall provide for the attachment of test connections external
to the CB for applied voltage and injected current tests. The test connections shall
be capable of withstanding 25 kV d.c to earth for 15 minutes and capable of
carrying at least 630 Amperes continuously.
One set of 3 phase testing device suitable for use with the type of circuit breaker
offered under this Tender shall be provided by the Electrical Contractor whether or
not this item is separately itemised in the Bill of Quantities of the Tender
Document.
The cable termination for the LBS shall be of dry type suitable for 11 KV 3 core
cable to BS 6480 of conductor size up to 300 mm2. The termination shall normally
be for a cable entering vertically from below. However, due to site conditions, a
bottom angled entry or a vertical top entry may be required. In such case, the
Electrical Contractor shall supply the appropriate termination accessories.
The cable termination compartment shall be arc resistant as per MS IEC 62271-
200.
The clearance between phase to phase and phase to earth shall be as per IEC
61243-5.
Page: S3/1 of 2
All earthing system and accessories shall comply with Electricity Regulations 1994,
MS IEC 60364-5-54, BS EN 13601 and BS 7430.
Unless otherwise specified, all metal parts of the RMU shall be provided with an
earth bar of not less than 25 mm x 6 mm flat hard drawn copper. The earth bar
shall be bolted to the main frame and located so as to provide convenient facilities
for earthing cable sheaths and for use with earthing device. Means shall be
provided for coupling earth bars of adjacent units.
The copper tape/bar with dimension not less than 25 mm x 6 mm shall be installed
around the four walls of the switchroom at a height of 300 mm from the finished
floor level.
Earth electrodes shall be of copper jacketed steel core rods with 16 mm nominal
diameter and supplied in 1500 mm length and shall have provision for screw
coupling with another standard length. The copper jacket of 99.9 % pure
electrolytic copper shall be of minimum radial thickness 0.25 mm and shall be
molecularly bonded to the steel core to ensure that the copper jacket and steel
core are not separable.
Each earth electrode shall be driven 3000 mm in depth. Where the desired earth
resistance value cannot be achieved after the first earth electrode have been
driven, sufficient number of earth electrodes in parallel shall be installed outside
the resistance area until required value is reached. Mutual separation between two
earth electrodes shall be more than, but less than twice, the driven depth of the
earth electrode. Earth electrodes shall not be installed close to a metallic fence.
Unless the metallic fence is separately earthed, the fence shall be separated from
the electrical earthing system by at least 2000 mm. Interconnection between
different earth electrodes shall be by means of 25 mm x 3 mm annealed copper
tape.
The connection of the earthing conductor and/or the earth electrode to the earth
electrode shall be soundly made by the use of plumbed joints, either by brazing
using zinc-free material with a melting point of at least 600 0C or by exothermic
welding.
Each earth electrodes shall be provided with heavy duty type inspection chamber
with removable cover. The inspection chamber shall be of square or round type
and
Page: S3/2 of 2
tested in accordance with MS 26: Part 2. The minimum size of square type
inspection chamber shall be 300 mm (width) x 300 mm (length) x 180 mm (height)
and for round type inspection chamber, the minimum size shall be 300 mm
(diameter) x 180 mm (height). The working load of the inspection chamber shall be
minimum 4500kg. Lifting hook shall be provided on the cover. The brand name
shall be durably marked on the removable cover.
The earthing points shall be identified by permanent label durably marked with the
words `Ring Main Unit Earth' permanently fixed at the point of connection of every
earthing conductor to an earth electrode.
Page: S4/1 of 1
4.1 PADLOCKS
4.2 LABELLING
Labels of size not less than 50 mm x 150 mm shall be fitted on the front of all RMU
by means of non-corrosive screws or any other method approved by the S.O.'s
Representative. The labels shall be of black laminated plastic with engraved white
lettering with details such as rating, over current setting, earth fault setting to which
it is connected etc. The exact wording of the labels shall be agreed by the S.O.'s
Representative.
4.3 PAINTING
The RMU shall have one coat of primer, one undercoat and a third finishing coat of
paint applied at the manufacturer's works or at an approved factory. The final coat
shall be of oil-resisting enamel paint.
Page: S5/1 of 2
5.1 GENERAL
New RMU shall be subjected to routine tests as specified in Section 5.2. Generally,
the requirements for type tests will be waived if corresponding certification is made
available for RMU of identical design. However, the S.O retains the right to have the
same tests repeated. Electrical Contractor shall in any case quote at the time of
tendering separate prices for conducting type tests.
Upon satisfactory completion of the tests, the test reports shall be submitted to the
S.O.’s representative for approval at least two weeks before leaving the
manufacturer’s works or shipment. Copies of all test reports shall be submitted to the
S.O.’s representative in quadruplicate. No item or plant shall be dispatched to site
until the S.O.’s representative has given approval in writing.
Routine tests as specified in MS IEC 62271-200 and other relevant IEC publications
shall be carried out on each RMU and all its accessories so the results of the tests
shall be formally submitted to the S.O.’s representative.
The routine tests to be carried out shall consist of the following tests as the minimum
requirement:-
Page: S5/2 of 2
TYPE TESTS
The type tests to be carried out shall consist of the following tests as the minimum
requirement:-
Page: S6/1 of 2
The whole of the plant and equipment to be provided under the Tender shall be
subjected to inspection and test carried out on site by the S.O.'s Representative prior
to commissioning. The approval by the S.O's Representative of the results of any
such inspection or test shall not prejudice the right of the S.O’s Representative to
reject the plant if it fails to comply with the specification when erected or to give
complete satisfaction in service within the DLP.
The costs of all tests including the provision of the necessary test equipment shall be
deemed to be included in the Tender Price.
Adequate notice shall be given when the plant is ready for inspection or testing and
every facility shall be provided by the Electrical Contractor to enable the S.O.'s
Representative to carry out the necessary inspection and tests.
6.2. TESTING
On completion of the installation work on site, the Electrical Contractor shall, at his
own expense, arrange for all necessary tests to be carried out on the equipment by a
Service Engineer approved by the Suruhanjaya Tenaga(ST) as part of the tests
required of him for the whole installation under this Contract. The tests to be carried
out shall be as prescribed in the relevant Standards and other tests deemed
necessary by the S.O.'s Representative. In the event the installation fails to pass any
of these tests, The Electrical Contractor shall take such measures as are necessary
to remedy the defects and the installation shall not be considered as completed until
all such tests have been passed.
Page: S6/2 of 2
The tests to be carried out by the Electrical Contractor shall consists of the following
tests as the minimum requirements:-
The S.O.'s Representative reserves the right to be present at all tests and the
Electrical Contractor shall give at least one week notice in writing to the S.O.'s
Representative for this purpose. In any case no test shall be carried out without prior
approval of the S.O.'s Representative. Copies of all the test certificates shall be
submitted to the S.O.'s Representative within one week after the completion of the
testing.
6.3 COMMISSIONING
Page: S7/1 of 1
Any item of plant or component which fails to comply with the requirements of the
specification in any respect whatsoever at any stage of manufacture, test or erection or on
completion at site within the DLP of the contract may be rejected by the S.O.’s
Representative either in whole or in part as he considers necessary. After adjustment or
modification if so directed by the S.O.’s Representative, the Electrical Contractor shall
submit the item for further inspection and/or tests. Plant or components with defects of
such nature that, in the opinion of the S.O.’s Representative, the requirements of this
specification cannot be fulfilled by adjustment or modification shall be replaced by the
Electrical Contractor at his own expense and to the satisfaction of the S.O.’s
Representative.
Page: S8/1 of 4
The Electrical Contractor shall submit with his Tender separate Schedule of Spares
recommended by the manufacturer of the equipment. This Schedule shall contain
the price and delivery period of each item of the spares recommended. The Electrical
Contractor shall also recommend the quantity of each item to be stored for the
purpose of maintenance. The prices of these spares shall not be included in the total
Tender Price and the purchase of all or any of the spares listed shall be at the option
of the S.O.’s Representative. The prices quoted shall be valid for acceptance during
Contract Period (extended if applicable) of the project.
All the spare parts shall be original and fully interchangeable with the corresponding
part used in the main items of the equipment and with each other without having to
resort to machining or additional, fittings at site. All spares shall be finished,
protected, packed and labeled in suitable manner to prevent deterioration during
prolonged storage in tropical climate.
Within two (2) weeks after award of the Tender or such shorter period as may be
required by the S.O.'s Representative, the Electrical Contractor shall submit to the
S.O.'s Representative for his approval four (4) sets of details of the layout of the
RMU in the switchroom provided. The drawings submitted are to be modified if
necessary as requested by the S.O.'s Representative and resubmitted for final
approval. It is to be
Page: S8/2 of 4
understood, however, that approval of the drawing will not exonerate the Electrical
Contractor from any responsibility in connection with the work.
The instruction shall include essential details, drawings and sketches of the
equipment installation, operation and maintenance techniques and make mention of
special materials where used. Each of the above two (2) sets of manuals submitted
shall be in a stiff cover ring file and with titles to the satisfaction of the S.O.'s
Representative. The cost of these manuals shall be deemed to be included in the
Tender Price.
As-Built document shall consist of but not limited to the As-Installed drawings,
manuals, certificates, catalogues, inventories and parts lists. The drawings, manuals,
tools etc. as mentioned below shall be provided whether or not they are separately
itemized in the Bill of Quantities (BQ) of the Tender Document.
Each of the As-Built documents shall be bound together with hard cover and
submitted in four (4) sets upon the issuance of Certificate of Practical Completion
(CPC) of the project.
The cost of all these drawings, manuals, tools etc is deemed to be included in the
Contract.
14
SPECIFICATION FOR 11 kV SF6 RING CKE.LS.01.14.(01).2012
MAIN UNIT
(L-S14)
Date: Ogos 1986
Page: S8/3 of 4
These drawings shall be labelled at the lower right hand corner the Electrical
Contractor's name and address, date of commissioning, scale, drawing number (the
drawing number to be obtained from S.O.'s Representative) title and the following
particulars:
If the drawings submitted are not according to the actual installation at site and/or not
acceptable by the S.O.'s Representative, the Electrical Contractor shall amend and
re-submit the drawings within two weeks from the date of return of the drawings to
the satisfaction of the S.O Representative.
One set of the As-Installed drawing shall be submitted in the form of tracing/original
document and two (2) sets in CD ROM.
Page: S8/4 of 4
8.5.2 MANUALS
The installation, operation, service and maintenance manuals shall be the same as
those described in clause 8.4.
8.5.3 TOOLS
One (1) set of 3 phase testing device for LBS as mentioned in clause 2.4.3 and
one(1) set of 3 phase testing device for circuit breaker as mentioned in clause 2.5.3
shall be provided. The testing devices shall be insulated to withstand 25 kV d.c. to
earth for 15 minutes and shall be capable of carrying at least 630A continuously.
One set of standard tools as well as any special tools, gauges, handling appliance
etc. as recommended by the manufacturer for the assembly, operation, checking
adjustment and normal maintenance of RMU shall also be supplied.
Page: S9/1 of 1
Approved type of rubber mat shall be provided in front of the RMU. The rubber mat
shall extend to the full length of the RMU panels and shall be of thickness not less
than 6 mm and width 1000 mm.
'BAHAYA' sign, 'DILARANG MASUK' sign, sign indicating 'Substation No: ' and
shock treatment chart shall be installed to the requirement of the ST and to the
satisfaction of the S.O.'s Representative. 'DILARANG MEROKOK' sign shall also be
installed.
All trenches in the switchrooms shall be filled up with clean sand to a level above
cable ducts.
As fitted layout plans, schematic wiring diagrams, and plans showing cable routes
and positions of earthing point with reference to easily recognised buildings and
structures shall be suitably framed up in the switchroom. These plans and diagrams
shall be in addition to the four (4) sets of as installed drawings required to be
submitted to the S.O.'s Representative after completion of the project as stated in
Section 10.0.
One 9 kg. dry powder fire extinguisher for A,B,C class of fire and complete with
discharge hose, nozzle and wall bracket shall be supplied and installed in every
switchroom. The extinguisher shall be certified by Jabatan Bomba Dan Penyelamat
Malaysia valid to be used for a period of twelve (12) months from the completion
date of the Contract.
Page: S10/1 of 1
During the DLP, The Electrical Contractor shall be responsible for the service and
maintenance work for the complete installation. All works shall be carried out by
competent personnel. All labour, material, tools and parts necessary to rectify the
defects due to manufacturing/ installation faults shall be supplied/ executed at the
Electrical Contractor's cost.
The service and maintenance to be performed shall include but not be limited to
the following:-
(a) Replacing or making good all parts and components of the RMU,
fuses, wiring, etc.
(b) Replacing or making good all loose and burnt cables and terminations,
all mechanical support and linkage, earth electrodes, inspection
chambers and covers, conduits, trunking etc.
(c) Making good any damage to roads, buildings drains, cables, pipes,
concrete areas, paved areas etc. which had not been properly made
good arising out of his work.
(d) All other works as deemed necessary by the S.O.'s Representative.
All works shall be carried out as soon as the Electrical Contractor has been
informed by the S.O.'s Representative or the Occupant and shall be completed
within a reasonable time except under emergency situation as stipulated in the
Electrical Works Additional General Conditions. If the Electrical Contractor fails to
comply with the above requirement, the S.O.'s Representative reserves the right to
engage another party to carry out the works, in which case, the Electrical
Contractor shall be responsible for all the expenses incurred
Page: S11/1 of 2
The standards and/or relevant parts of the standards include but not limiting to
the following:
Page: S11/2 of 2
If the specifications conflict in any way, with any or all of the above standards, the
specification shall have precedence and shall govern.
Page: ApA/1 of 1
ROUTINE TEST
(c) Tests on auxiliary and control Verification of conformity to the circuit MS IEC 62271-200
circuits diagrams and wiring diagrams MS IEC 60694
Functional tests
(d) Measurement of the resistance The measured values of the type test MS IEC 62271-200
of the main circuit shall be used to determine the limit of
resistance value for the routine test.
(e) Tightness tests The absolute leakage rate (F) shall MS IEC 62271-200
not exceed the specified value of the MS IEC 60694
permissible leakage rate (Fp)
Page: ApB/1 of 1
TYPE TESTS
(c) Temperature-rise tests Not exceed the temperature-rise limits MS IEC 62271-200
specified in Table 3 of MS IEC 60694 MS IEC 60694
(ii) Tests on earthing circuits Deformation and degradation of the MS IEC 62271-200
earthing conductor, earthing
connections or earthing devices is
permissible, but the continuity of the
circuit shall be preserved
(e) Tightness tests The absolute leakage rate (F) shall MS IEC 62271-200
not exceed the specified value of the MS IEC 60694
permissible leakage rate (Fp)
(f) Measurement of the resistance The measured values will be recorded MS IEC 62271-200
of circuits and shall be used to determine the MS IEC 60694
limit of resistance value for the routine
test
Page: An/1 of 3
1.0 General
(kVr.m.s)
Page: An/2 of 3
Page: An/3 of 3
5.0 Busbars
(a) Material :
Signature :........................
Date: …………………