Details of PLunge Column
Details of PLunge Column
Details of PLunge Column
MIN.
75
50 HOLE
225
6 CFW ALL ROUND
LIFTING EYE - REFER TOP OF PLUNGE COLUMN 150 10PL GUSSET F/S
TYPICAL DETAIL BEAMS 20 PL BOTH SIDES
REFER EARLY WORKS STEEL
BEAM SCHEDULE FOR SIZE, SWL - 8.0t 8M20 BOLTS 8.8/TF 20 PL SLOTTED INTO STRUT
300 MIN.
TYP.
LIFTING EYE, TYPICAL
SCALE 1 : 10
PLUNGE COLUMN: PLC
REFER PLAN
20 PL 10 CAP PL
10
FSBW BEAM MEMBERS
110 4M24 8.8/TF
6CFW TO TOP OF PLC 25 PL
BOLTS
ALL ROUND
300
32 PL. BEAM LENGTH TBC 12 PL GUSSET
6CFW TO PLC ALL ROUND 300
SLAB
PLUNGE COLUMN (PLC)
REFER EARLY WORKS STEEL
COLUMN SCHEDULE FOR STRUT: S
SIZE, TYP. PLAN
40 PL. (TBC) WELDED TO
FLANGE WITH 6CFW ALL
ROUND
Engineering Consultant
Suite 11
900 Ø
50 Great north Rd
PILE
Five Dock NSW 2046
Ph (02) 9712 4700
Fax (02) 9712 4733
40 PL. (TBC) WELDED TO
FLANGE WITH 6CFW ALL
Structural Design Solutions Pty. Ltd
ROUND
engineers@structuraldesignsolutions.com.au
50 COVER
Architect
20 SQ. STEEL BAR
WITH 6CFW TOP &
BTM 4M24 CHEMICAL STRUT: S
ANCHORS TOP & BTM
200 MIN. EMBEDMENT
9N28 VERT. BARS
50
50 EQ EQ EQ 50
SECTION A 185 MIN 185 MIN 185 MIN
SECTION B
Project
PILE
DO NOT SCALE FROM THIS DRAWING
REINFORCEMENT OMITTED FOR
CLARITY Status
Date Scale
APR '18 As indicated
DETAIL 1 PLUNGE COLUMN BASE, DETAIL 7 STRUT TO SHORING WALL Project Number Drawing Number Revision
1 : 10 - 1 : 10 -
TYPICAL CONNECTION, TYPICAL
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ST16049 S1.32 1
A1