NPCC
Board of Directors
Managing Director
HEAD OFFICE
Chief Executive
Officer
Personal Staff
Officer to CEO
General Manager
General Manager
Local Projects
Finance
OVERSEAS PROJECTS
General Manager
Project Manager
I, II, III
2
Company Profile
3
Company Profile
4
Corporate Structure
5
Corporate Structure
6
Charter of Services
7
Charter of Services
8
Performance Record
9
Performance Record
10
the elite club of International Constructors who
are credited with turnkey execution of Extra
High Voltage Transmission Lines. This was
with the award of the prestigious 290km long,
380kV transmission line, connecting Madinah-
Al-Munawarah with Rabigh on Red Sea coast
of Saudi Arabia. The Contract was worth US$
140 million and won by NPCC in the face
of fierce competitive international bidding.
The Project was successfully completed
and commissioned in 1992. NPCC had the
distinction of being amongst the selected
electrical Contracting Outfits who participated
in the rehabilitation of Power Network in and
around Kuwait city after its liberation from Iraq
in early 1991. The work involved emergency
repairs and putting into service of 300kV and
132kV Transmission Lines and was carried out
in very hazardous post-war field conditions.
Through professional pursuit, sheer hard-
work and determination, NPCC has now
established itself as a very strong Contracting
Outfit in its field of specialty. With strong
resources, NPCC boasts of highly experienced
professional managers and workforce armed
with an extensive range of construction
equipment. Having this capability and proven
past experience at its back, NPCC is now all
set to extend its operations in the Far East
and Africa. NPCC is amongst the selected
construction companies which posses ISO
9001:2000 certification, a pre-requisite these
days to participate projects for most power
utilities.
11
Board of Directors
12
Management
13
Projects
in Hand/
Completed
14
Overseas
1 Project SEC-SOA CONTRACT NO. 4400005270
CONSTRUCTION OF 380KV D/C OHTL BW MADHAYA BSP TO
JAZAN REFINERY P/P AND MADHAYA BSP TO KUDMI BSP
Turnkey construction of 212.47km of 380kV Double Circuit
Overhead Transmission Line with 2x48 fiber OPGW from Madhaya
BSP to Jazan Refinery P/P and Madhaya BSP to Kudmi BSP.
Client: Saudi Electricity Company - Southern Operating Area
(SEC-SOA), Abha, Saudi Arabia.
Period: 2014 – 2017
Value: SR. 373,490,000
US$ 99,597,333
15
7 Project SEC-SOA CONTRACT NO. 4400005062
DIVERSION OF OVERHEAD LINES IN SOUTHERN
OPERATING AREA
16
12 Project SEC-WOA CONTRACT NO. 21131114/00
380KV OVERHEAD TRANSMISSION LINE WORKS
ASSOCIATED WITH AL-SANABL 380/110KV BSP
Turnkey construction of 183.61km of 380kV Overhead Transmission
Lines with 2x48 fiber OPGW associated with Al-Sanabl 380/110kV
BSP
Client: Saudi Electricity Company - Western Operating Area
(SEC-WOA), Jeddah, Saudi Arabia.
Period: 2011 – 2013
Value: SR. 317,173,585
US$ 84,579,623
17
Client: Saudi Electricity Company - Western Operating Area
(SEC-WOA), Jeddah, Saudi Arabia.
Period: 2006 - 2008
Value: SR. 67,086,183
US$ 17,889,648
18
22 Project 132KV / 110KV UNDERGROUND CABLES
JEDDAH CABLES NETWORK:
CONTRACT No. ENG/JED/1072-4
POWER & PILOT CABLES -
EXTENSION AND REINFORCEMENT OF 110KV
SYSTEM - JEDDAH
24 Project Kuwait:
REPAIRS / REHABILITATION OF
300KV / 132KV TRANSMISSION
LINES IN & AROUND KUWAIT CITY
19
26 Project 132KV / 110KV OHTL - YANBU:
CONTRACT No. 32/2/1/SH
TRANSMISSION LINES FOR YANBU (PHASE-I)
28 Project QASEEM :
CONTRACT No.4120-305
QASEEM RURAL ELECTRIFICATION
29 Project AL-KHARJ :
AL-KHARJ REGIONAL ELECTRIFICATION
SCHEME (KRES)
30 Project AL-KHARJ:
CONTRACT No. 3403/2
AL-KHARJ ELECCTRIFICATION SCHEME
20
21
23
Other Contracts
1 Project NGSA CONTRACT NO. 4400002723
INTEGRATION OF 380/110/13.8KV AL-MASHA’AR BSP
WITH 110KV NETWORK (MAKKAH)
- Supply & Installation of 110kV three (3) Star Tower, two (2) Dead
End Tower, two (2) Heavy Angle Tower & one (1) Gantry at Makkah
and Bahrah Areas.
- Supply & Installation of 7.3km, 110kV D/C OHTL from Bahrah-2
to HHR-1 BSP.
22
6 Project SEC-WOA CONTRACT NO. 31121062/00 -
CONSTRUCTION OF SHOAIBAH II COMBINED CYCLE
POWER PLANT PROJECT (SUBCONTRACT WITH DAELIM)
10 Project CNT-064
TURNKEY CONSTRUCTION OF 110KV D/C OHTL TO FEED
110/13.8KV SUBSTATION AT KEC MADINAH
23
Client: Knowledge Economic City Developers Co., Jeddah, KSA
Period: 2010-2012
Value: SR. 15,819,428
US$ 4,218,514
24
17 Project CHINA RAILWAY CONSTRUCTION CORP. LTD. (CRCC)
VARIOUS WORKS ASSOCIATED WITH POWER SUPPLY
& COMMUNICATION
25
24 Project RE-LOCATION OF 380KV & 110KV OVERHEAD LINES AT
MADINAH - YANBU EXPRESSWAY CROSSING
Re-routing of 380&110kV Transmission Line Towers for
Construction of Madinah Al Munawarah -Yanbu Expressway
Client: Saudi Electricity Company Western Operating Area
(SEC-WOA), Jeddah, Saudi Arabia
Period: 2005
Value: SR. 11,350,000
US$ 3,026,667
26
Pakistan
PROJECTS IN HAND:
1.
MEPCO-GSC-08 PROCUREMENT OF EQUIPMENT, DESIGN, SUPPLY,
INSTALLATION, TESTING AND COMMISSIONING ON TURNKEY BASIS
OF 132KV TRANSMISSION LINES IN SOUTHERN PUNJAB.
Client : Multan Electric Power Co. Ltd (MEPCO)
Period : 2017 - 2018
Value : PKR. 934,807,180
US$ 8,902, 925
PROJECTS COMPLETED:
27
8. 11KV TRANSMISSION LINE, CHATTAR
Client : Ministry of Defence
Period : 1975 - 1976
Value : Rs. 1.475 million
28
Financial
Highlights
29
Financial Highlights
RS. In Million
2,500.00
2,000.00
1,500.00
1,000.00
500.00
-
2011 2012 2013 2014 2015 2016
30
31
Head Office | National Power Construction Corporation (NPCC)
9-Shadman II, Lahore -54000, Pakistan
Phones : +92-42-354-07173
Telefax : +92-42-354-07179
E-Mail : npcclhr@gmail.com / npcclhr@yahoo.com
Website : www.npcc.com.pk
Overseas Office | Kingdom of Saudi Arabia
Office No. 18, Beautat Business Park
Malik Street, Al-Shati District,
P. O. Box 31220, Jeddah 21497