Kebutuhan Plant H Taufik - R3
Kebutuhan Plant H Taufik - R3
Kebutuhan Plant H Taufik - R3
1 2 3
A KEBUTUHAN BAHAN PAGAR PLANT
1 Seng Gelombang P : 100 meter Pcs
2 Besi Siku 4X4 6meter t: 3 mm type MS Pcs
3 Baut Dril 3cm 8 isi 100/dus Dus
4 Electroda / Kawat Las LB 52 3.2 x 350 Kg
5 Electroda / Kawat Las RB 26 3.2 x 350 Kg
5 Semen Sak
6 Pasir m³
7 Batu Pecah 2/3 m³
8 Triplek t:10 mm 240X120 utk begesting pondasi pagar Pcs
9 Besi Ulir D16 Lonjor
10 Paku 2 " Kg
11 Paku 3 " Kg
12 Mata bor 8 Pcs
13 Mata bor baut 8 Pcs
14 Mata Gerinda Pcs
15 Mata Cutting Whell Pcs
C ALAT BANTU
1 Bor Tangan Unit
2 Gerinda Tangan Unit
3 Palu 2 kg Pcs
4 Selang Air meter
5 Selang Solar meter
6 Kabel Las 50 mm meter
7 Stang Las 800 Ampere Pcs
8 Topeng Las Pcs
9 Selang Blander Potong meter
10 Regulator Oxigen Pcs
11 Regulator LPG Pcs
12 Stang Blander Potong P:60cm Pcs
13 Nozzel / cuncum Blander Potong No 2 Pcs
14 Pompa Air Unit
15 Kasutan Pcs
16 Cangkul Pcs
17 Skop Pcs
Jumlah Keterangan
4 8
142.00
68.00
8.00
20.00
20.00
50.00 Ambil Dari Bago Lumajang
2.00
2.00
4.00 Ambil Dari Bago Lumajang
10.00 Ambil Dari Bago Lumajang
10.00
10.00
5.00
2.00
5.00
10.00
60.00
170.00
15.00
2.00
12.00
14.00
48.00 Ambil Dari Garasi
10.00
2.00
2.00
2.00
4.00
50.00
10.00
25.00
1.00
2.00
25.00
1.00
1.00
1.00
3.00
2.00
2.00
3.00
3.00