BF Productivity Rate
BF Productivity Rate
BF Productivity Rate
COMPOSITE RATE
HELPER / LABORER
MINIMUM RATE PER DAY P 404.00
SOCIAL OBLIGATIONS:
13TH MO. PAY 147,460.00 / 12 mos. =
SSS 1,090.00 x 12 mos. =
Philhealth 187.50 x 12 mos. =
Pag-ibig 100.00 x 12 mos. =
Sub-Total
GRAND TOTAL
Total MH
Reg. Hr. 365 x 8 2920
OT Hr. 300 x 2 600
Total MH 3520
520 4040
Legal Holidays National Special Holidays National
Jan 1 New Year 1 Black Saturday
Holy Thursday 1 Aug 21 Ninoy Aquino Day
Good Friday 1 Nov 1 All Souls Day
April 9 Bataan Day 1 EDSA 1
362
/Day 45.25
SSS 2.69
PH 1.67
13 11.9 16.26
total 61.51 1.359337017
Electrician
Comm Engr
Driver
Welder
Glazier
Air Comp 3.11
Air Comp 5.95
m.Crane 10T
Dozer
SALARY % SOB
Php 13,000.00 /mo 17.50%
Php 14,000.00 /mo 17.50%
Php 15,000.00 /mo 17.50%
Php 16,000.00 /mo 17.00%
Php 17,000.00 /mo 16.50%
Php 18,000.00 /mo 16.00%
Php 19,000.00 /mo 15.75%
Php 20,000.00 /mo 15.50%
Php 25,000.00 /mo 14.25%
Php 30,000.00 /mo 13.50%
Php 40,000.00 /mo 12.25%
Php 50,000.00 /mo 11.50%
Php 60,000.00 /mo 11.00%
387.00
387.00
387.00
392.00
392.00
400.00
400.00
COMPOSITE RATE
ROUGH MASON / ROUGH CARPENTER / STEELMAN
MINIMUM RATE PER DAY P 408.72
OVERTIME PREMIUM:
Legal Holidays - 10 Legal Holidays
4,040.00 P 408.72 x 10 x
SOCIAL OBLIGATIONS:
12,288.33 13TH MO. PAY 149,181.25 / 12 mos.
13,080.00 SSS 1,090.00 x 12 mos.
2,250.00 Philhealth 187.50 x 12 mos.
1,200.00 Pag-ibig 100.00 x 12 mos.
28,818.33 176,278.33 Sub-Total
362
/Day 45.25
SSS 2.69
PH 1.67
13 11.9 16.26
total 61.51 1.359337017
65.68
138.22115384615
64.1025
78.75
94.5
325
422
526
2,229.46
COMPOSITE RATE
PENTER / STEELMAN FINISHING MASON / FINISHING CAR
MINIMUM RATE PER DAY P 413.44
SOCIAL OBLIGATIONS:
= 12,431.77 13TH MO. PAY 150,905.15 /
= 13,080.00 SSS 1,090.00 x
= 2,250.00 Philhealth 187.50 x
= 1,200.00 Pag-ibig 100.00 x
28,961.77 178,143.02 Sub-Total
Total MH
Reg. Hr. 365 x 8 2920
OT Hr. 300 x 2 600
Total MH 3520
362
/Day 45.25
SSS 2.69
PH 1.67
13 11.9 16.26
total 61.51 1.359337017
COMPOSITE RATE
INISHING MASON / FINISHING CARPENTER TI
MINIMUM RATE PER DAY
SOCIAL OBLIGATIONS:
12 mos. = 12,575.43 13TH MO. PAY
12 mos. = 13,080.00 SSS
12 mos. = 2,250.00 Philhealth
12 mos. = 1,200.00 Pag-ibig
29,105.43 180,010.58 Sub-Total
Total MH
Reg. Hr. 365 x
OT Hr. 300 x
Total MH
362
/Day 45.25
SSS 2.69
PH 1.67
13 11.9 16.26
total 61.51 1.359337017
TILE SETTER / PAINTER
P 421.01
R = 365 DAYS
Premium 10
233,780.83
8 2920
2 600
3520
1 Ramadan 1
Independence Day 1 5
National Heroes Day 1
Bonifacio Day 1
Christmas day 1
1
10
13.33333 1
1
2
4
13.33333 1
1
2
4
9.378664 1
1
2
6
10.62417 1
1
2
6
7.843137 1
1
2
4
8.510638 1
1
2
4
5.813953 1
1
2
4
12.69841 1
1
2
4
10.32258 1
1
2
6
12.69841 1
1
2
4
12.69841 1
1
2
4
12.69841 1
1
2
4
Mnhr per
Work Item Qty / day Unit Crew
Unit
Qty
MASONRY WORKS
8" CHB Laying 1
8 8 sm 1 Ro. Mason 1.000 63.88 63.88
2.6666666667 1 sm/hr/crew 2 Helper 2.000 63.88 127.76
sm/mnday 3 3.000 191.64
Plastering int 1
10 10 sm 1 Fin Mason 0.800 63.88 51.10
3.3333333333 1.25 sm/hr/crew 2 Helper 1.600 63.88 102.21
sm/mnday 3 2.400 153.31
Plastering ext 1
8 8 sm 1 Fin Mason 1.000 63.88 63.88
2.6666666667 1 sm/hr/crew 2 Helper 2.000 63.88 127.76
sm/mnday 3 3.000 191.64
Lineal Plastering 1
15 15 lm 1 Fin Mason 0.533 63.88 34.07
7.5 1.875 lm/hr/crew 1 Helper 0.533 63.88 34.07
lm/mnday 2 1.067 68.14
Scratch Coat/Render 1
17.777777778 17.777778 sm 1 Fin Mason 0.450 63.88 28.75
8.8888888889 2.2222222 sm/hr/crew 1 Helper 0.450 63.88 28.75
sm/mnday 2 0.900 57.49
REBAR WORKS
Fabrication & Installation 1
1375 1375 kg 1 LM 0.006 63.88 0.37
125 171.875 kgm/hr/crew 10 Steelman 0.058 63.88 3.72
kg/mnday 11 0.064 4.09
Hauling 1
9600 9600 kg 6 Helper 0.005 63.88 0.32
1600 1200 kgm/hr/crew 6 0.005 0.32
kg/mnday
CONCRETING WORKS
Concrete-Fdn, ftng 1
14 m³ 1 Ro. Mason 0.571 50.5 28.86
3 Helper 1.714 50.5 86.57
2.286 115.43
Column 1
14.5 m³ 1 Ro. Mason 0.552 50.5 27.86
4 Helper 2.207 50.5 111.45
2.759 139.31
Shear Wall 1
14.5 m³ 1 Ro. Mason 0.552 50.5 27.86
4 Helper 2.207 50.5 111.45
2.759 139.31
Concrete-B&G, S/Slab 1
18 m³ 2 Ro. Mason 0.889 50.5 44.89
1 Ro. Carp 0.444 50.5 22.44
4 Helper 1.778 50.5 89.78
3.111 157.11
Stairs 1
13.5 m³ 2 Ro. Mason 1.185 50.5 59.85
4 Helper 2.370 50.5 119.70
3.556 179.56
RW/RC Wall 1
14.5 m³ 1 Ro. Mason 0.552 50.5 27.86
4 Helper 2.207 50.5 111.45
2.759 139.31
Grade Slab 1
18 m³ 2 Ro. Mason 0.889 50.5 44.89
4 Helper 1.778 50.5 89.78
2.667 134.67
Grouting (nonshrink) 1
0.118 m³ 1 Ro. Mason 67.797 50.5 3,423.73
67.797 3,423.73
Installation WWF 1
1955.5555556 1955.5556 kg 1 Steelman 0.004 63.88 0.26
177.77777778 244.44444 kgm/hr/crew 10 Steelman 0.041 63.88 2.61
kg/mnday 11 0.045 2.87
CONCRETING WORKS
Footing 1
18 18 m³ 1 LM Mason 0.444 64.57 28.70
2 Ro Mason 0.889 64.57 57.40
4 Helper 1.778 63.88 113.56
7 3.111 199.66
Tie Beam 1
18 18 m³ 1 LM Mason 0.444 64.57 28.70
2 Ro Mason 0.889 64.57 57.40
4 Helper 1.778 63.88 113.56
7 3.111 199.66
Column 1
20.5 20.5 m³ 1 LM Mason 0.390 64.57 25.20
2 Ro Mason 0.780 64.57 50.40
6 Helper 2.341 63.88 149.57
9 3.512 225.17
Parapet 1
21.5 21.5 m³ 1 LM Mason 0.372 64.57 24.03
2 Ro Mason 0.744 64.57 48.05
6 Helper 2.233 63.88 142.62
9 3.349 214.69
Suspended Slab 1
14.5 14.5 m³ 1 LM Mason 0.276 64.57 17.81
2 Ro Mason 1.103 64.57 71.25
4 Helper 2.207 63.88 140.98
7 3.586 230.04
Stair; Suspended 1
13.5 13.5 m³ 1 LM Mason 0.296 64.57 19.13
2 Ro Mason 1.185 64.57 76.53
4 Helper 2.370 63.88 151.42
7 3.852 247.08
Stairs; Grade 1
19 19 m³ 1 LM Mason 0.421 64.57 27.19
2 Ro Mason 0.842 64.57 54.37
4 Helper 1.684 63.88 107.59
7 2.947 189.15
Wall 1
20.5 20.5 m³ 1 LM Mason 0.390 64.57 25.20
2 Ro Mason 0.780 64.57 50.40
6 Helper 2.341 63.88 149.57
9 3.512 225.17
Grade Slab 1
18 18 m³ 1 LM Mason 0.444 64.57 28.70
2 Ro Mason 0.889 64.57 57.40
4 Helper 1.778 63.88 113.56
7 3.111 199.66
Roadways/Pavement 1
18 18 m³ 1 LM Mason 0.444 64.57 28.70
2 Ro Mason 0.889 64.57 57.40
4 Helper 1.778 63.88 113.56
7 3.111 199.66
Lean Concrete 1
18 18 m³ 1 LM Mason 0.444 64.57 28.70
2 Ro Mason 0.889 64.57 57.40
4 Helper 1.778 63.88 113.56
7 3.111 199.66
Mnhr per
Work Item Qty / day Unit Crew
Unit
# days
FORMWORKS
Footings, Pile Cap 1
0 35.955056 35.955056 sm/day 1 LM 0.222 63.88
0 2.7657736 4.494382 sm/hr/crew 12 Ro. Carp 2.670 63.88
sm/mnday 13 2.893
Ftgs, Fndtn.-complex 1
1607 23.111111 23.111111 sm/day 1 LM 0.346 63.88
53.56666667 1.7777778 2.8888889 sm/hr/crew 12 Ro. Carp 4.154 63.88
sm/mnday 13 4.500
Tie Beam 1
278.00 38.951311 38.951311 sm/day 1 LM 0.205 63.88
9.266666667 2.9962547 4.8689139 sm/hr/crew 12 Ro. Carp 2.465 63.88
sm/mnday 13 2.670
Columns 1
0 32 32 sm/day 1 LM 0.250 63.88
0 2.4615385 4 sm/hr/crew 12 Ro. Carp 3.000 63.88
sm/mnday 13 3.250
Stairs 1
0 16.812609 16.812609 sm/day 1 LM 0.476 63.88
0 1.2932777 2.1015762 sm/hr/crew 12 Ro. Carp 5.710 63.88
sm/mnday 13 6.186
Suspended Slab/Canopy 1
0 30 30 sm/day 1 LM 0.267 63.88
2.3076923 3.4615385 sm/hr/crew 12 Ro. Carp 3.200 63.88
sm/mnday 13 3.467
Soffits of landings 1
0 5.2493438 5.2493438 sm/day 2 Ro. Carp 3.048 63.88
2.6246719 0.656168 sm/hr/crew 2 3.048
sm/mnday
Soffits of staircases 1
5.1496621 5.1496621 sm/day 2 Ro. Carp 3.107 63.88
0 2.574831 0.6437078 sm/hr/crew 2 3.107
sm/mnday
0
Drop Walls 1
5.7204147 5.7204147 sm/day 2 Ro. Carp 2.797 63.88
0 2.8602074 0.7150518 sm/hr/crew 2 2.797
0 sm/mnday
Lintel Beams/Columns 1
2.519685 2.519685 sm/day 2 Ro. Carp 6.350 63.88
1.2598425 0.3149606 sm/hr/crew 2 6.350
0 sm/mnday
0
Cisterns 1
10 10 sm/day 4 Ro. Carp 3.200 63.88
2.5 1.25 sm/hr/crew 4 3.200
0 sm/mnday
0
Elev. Pit 1
10 10 sm/day 4 Ro. Carp 3.200 63.88
2.5 1.25 sm/hr/crew 4 3.200
0 sm/mnday
0
Shearwall/Elev Wall 1
10 10 sm/day 4 Ro. Carp 3.200 63.88
2.5 1.25 sm/hr/crew 4 3.200
0 sm/mnday
0
RW/RC Wall-straight 1
30 30 sm/day 1 LM 0.267 63.88
2.5 3.4615385 sm/hr/crew 12 Ro. Carp 3.200 63.88
sm/mnday 13 3.467
0
0 RW/RC Wall-radial 1
8 8 sm/day 4 Ro. Carp 4.000 63.88
2 1 sm/hr/crew 4 4.000
sm/mnday
0
0 Trench 1
8 8 sm/day 4 Ro. Carp 4.000 63.88
2 1 sm/hr/crew 4 4.000
sm/mnday
0
0 Curbs & Gutter 1
8.7912088 8.7912088 sm/day 4 Ro. Carp 3.640 63.88
2.1978022 1.0989011 sm/hr/crew 4 3.640
sm/mnday
0
Slab on Grade 1
23.970037 23.970037 sm/day 1 LM 0.334 63.88
2.9962547 2.6633375 sm/hr/crew 8 Ro. Carp 2.670 63.88
sm/mnday 8 3.004
-
0 Column -Circular 1
10.15873 10.15873 sm/day 4 Ro. Carp 3.150 63.88
2.5396825 1.2698413 sm/hr/crew 4 3.150
sm/mnday
0
Vertical Fins 1
0 12 12 sm/day 6 Ro. Carp 4.000 63.88
2 1.5 sm/hr/crew 6 4.000
sm/mnday
Stairs on Grade 1
8.6253369 8.6253369 sm/day 4 Ro. Carp 3.710 63.88
2.1563342 1.0781671 sm/hr/crew 4 3.710
sm/mnday
CONCRETE: Ready Mixed Concrete 3/4" Agg.
CONCRETING WORKS
Footing 1
0 54.285714 54.285714 m³/day 1 LM Mason 0.147 63.88
0 2.8571429 6.7857143 m3/hr/crew 6 Ro Mason 0.884 63.88
m3/mnday 12 Laborer 1.768 63.88
19 2.800
Tie Beam 1
0 54.285714 54.285714 m³/day 1 LM Mason 0.147 63.88
0 2.8571429 6.7857143 m3/hr/crew 6 Ro Mason 0.884 63.88
m3/mnday 12 Laborer 1.768 63.88
19 2.800
Column 1
0 29.699101 29.699101 m³/day 1 LM Mason 0.269 63.88
0 1.5631106 3.7123877 m3/hr/crew 6 Ro Mason 1.616 63.88
m3/mnday 12 Laborer 3.232 63.88
19 5.118
Parapet 1
0 33.643205 33.643205 m³/day 1 LM Mason 0.238 63.88
0 1.770695 4.2054006 m3/hr/crew 6 Ro Mason 1.427 63.88
m3/mnday 12 Laborer 2.853 63.88
19 4.518
Suspended Slab 1
0 37.31893 37.31893 m³/day 1 LM Mason 0.214 63.88
0 1.9641542 4.6648662 m3/hr/crew 6 Ro Mason 1.286 63.88
m3/mnday 12 Laborer 2.572 63.88
19 4.073
Stair; Suspended 1
0 25.490525 25.490525 m³/day 1 LM Mason 0.314 63.88
1.3416066 3.1863156 m3/hr/crew 6 Ro Mason 1.883 63.88
0 m3/mnday 3.1863156 12 Laborer 3.766 63.88
19 5.963
Stairs; Grade 1
0 51.70068 51.70068 m³/day 1 LM Mason 0.155 63.88
2.7210884 6.462585 m3/hr/crew 6 Ro Mason 0.928 63.88
0 m3/mnday 12 Laborer 1.857 63.88
19 2.940
Wall 1
0 32.688172 32.688172 m³/day 1 LM Mason 0.245 63.88
1.7204301 4.0860215 m3/hr/crew 6 Ro Mason 1.468 63.88
0 m3/mnday 12 Laborer 2.937 63.88
19 4.650
Grade Slab 1
0 51.70068 51.70068 m³/day 1 LM Mason 0.155 63.88
2.7210884 6.462585 m3/hr/crew 6 Ro Mason 0.928 63.88
0 m3/mnday 12 Laborer 1.857 63.88
19 2.940
Roadways/Pavement 1
0 51.70068 51.70068 m³/day 1 LM Mason 0.155 63.88
2.7210884 6.462585 m3/hr/crew 6 Ro Mason 0.928 63.88
0 m3/mnday 12 Laborer 1.857 63.88
19 2.940
Lean Concrete 1
0 19.047619 19.047619 m³/day 1 LM Mason 0.420 63.88
2.7210884 2.3809524 m3/hr/crew 2 Ro Mason 0.840 63.88
0 m3/mnday 4 Laborer 1.680 63.88
7 2.940
Column 1
29.699101 29.699101 m³/day 1 LM Mason 0.269 63.88
1.5631106 3.7123877 m3/hr/crew 6 Ro Mason 1.616 63.88
m3/mnday 12 Laborer 3.232 63.88
19 5.118
Drilling 1
500 500 ml/day 1 Laborer 0.016 63.88
500 62.5 ml/hr/crew Ro Mason 0.000 63.88
ml/mnday Laborer 0.000 63.88
1 0.016
Installation Moulding 1
350 350 kg/day 1 LM 0.023 63.88
50 43.75 kg/hr/crew 2 Ro Mason 0.046 63.88
kg/mnday 4 Laborer 0.091 63.88
7 0.160
Work Item Qty / day Unit Crew
Qty # days
FINISHING WORKS
Vinyl Floor Tile 1
14.21 0 10.996564 11 m2/day 1 Installer
170.56 10.996564 1.375 sm/hr/crew 1 Helper
184.773 sm/mnday 2
Listel Tiles 1
15.97 0 8 8 m2/day 1 Tile Setter
191.64 4 1 lm/hr/crew 1 Helper
207.610 lm/mnday 2
Tile Trim 1
17.30 0 16 16 lm/day 1 Tile Setter
207.61 16 2 lm/hr/crew Helper
224.911 sm/mnday 1
Cement/Conc Tiles 1
19.96 0 4.35 4.35 m2/day 1 Tile Setter
239.55 2.175 0.54375 sm/hr/crew 1 Helper
259.513 sm/mnday 2
Pebble Washout 1
30.40 0 2.66 2.66 m2/day 1 Fin. Mason
364.75 2.66 0.3325 sm/hr/crew Helper
395.151 sm/mnday 1
Brass strip 1
204.42 0 8 8 lm/day 1 Fin. Mason
204.42 8 1 lm/hr/crew
sm/mnday 1
Skirting 1
204.42 0 5.3015242 5.3015242 lm/day 1 Carpenter
204.42 5.3015242 0.6626905 lm/hr/crew
sm/mnday 1
Grooves on concrete 1
204.42 0 40 40 lm/day 2 Mason
204.42 20 5 lm/hr/crew
lm/mnday 2
Tiktik 1
17.03 10 10 m2/day 1 Laborer
204.42 0 10 1.25 sm/hr/crew
221.45 sm/mnday 1
Granite Floor 1
255.52 4 4 m2/day 1 Tile Setter
255.52 2 0.5 sm/hr/crew 1 Helper
sm/mnday 2
Marble/Granite Floor 1
232.52 3.3898305 3.3898305 m2 1 Fin. Mason
232.52 1.6949153 0.4237288 sm/hr/crew 1 Laborer
sm/mnday 2
Rough Finish 1
201.22 0 24.615385 24.615385 m2 1 Ro. Mason
201.22 12.307692 3.0769231 sm/hr/crew 1 Laborer
sm/mnday 2
Grooves Wall 1
255.52 0 10.666667 10.666667 lm 2 Mason
255.52 5.3333333 1.3333333 lm/hr/crew
sm/mnday 2
Tie Beam 1
9.41 0 11.940299 11.940299 m³ 1 LM Mason
56.48 0 1.0854817 1.4925373 m3/hr/crew 2 Ro Mason
112.97 m3/mnday 8 Helper
178.86 11
Column 1
17.21 0 5.7553957 5.7553957 m³ 1 LM Mason
103.24 0 0.4427227 0.7194245 m3/hr/crew 2 Ro Mason
206.49 m3/mnday 10 Helper
326.94 13
Parapet 1
15.19 0 7.079646 7.079646 m³ 1 LM Mason
91.14 0 0.5445882 0.8849558 m3/hr/crew 2 Ro Mason
182.28 m3/mnday 10 Helper
288.61 13
Suspended Slab 1
13.69 0 8.2474227 8.2474227 m³ 1 LM Mason
82.16 0 0.5498282 1.0309278 m3/hr/crew 2 Ro Mason
164.33 m3/mnday 12 Helper
260.18 15
Stair; Suspended 1
20.05 0 6.0606061 6.0606061 m³ 1 LM Mason
120.29 0.4040404 0.7575758 m3/hr/crew 2 Ro Mason
240.58 0 m3/mnday 12 Helper
380.92 15
Stairs; Grade 1
9.88 0 13.559322 13.559322 m³ 1 LM Mason
59.31 1.0430248 1.6949153 m3/hr/crew 2 Ro Mason
118.62 0 m3/mnday 10 Helper
187.81 13
Wall 1
15.63 0 6.7226891 6.7226891 m³ 1 LM Mason
93.80 0.5171299 0.8403361 m3/hr/crew 2 Ro Mason
187.61 0 m3/mnday 10 Helper
297.04 13
Grade Slab 1
9.88 0 13.559322 13.559322 m³ 1 LM Mason
59.31 0.7136485 1.6949153 m3/hr/crew 6 Ro Mason
118.62 0 m3/mnday 12 Helper
187.81 19
Roadways/Pavement 1
9.88 0 13.559322 13.559322 m³ 1 LM Mason
59.31 1.0430248 1.6949153 m3/hr/crew 2 Ro Mason
118.62 0 m3/mnday 10 Helper
187.81 13
Lean Concrete 1
26.83 0 13.559322 13.559322 m³ 1 LM Mason
53.66 1.0430248 1.6949153 m3/hr/crew 2 Ro Mason
107.32 0 m3/mnday 10 Helper
187.81 13
17.21 0
103.24 0
206.49
326.94
36.33 0
72.65 0
217.96
326.94
33.00 0
66.01
198.03 0
297.04
1.02 0
-
- 0
1.02
0.68 0
2.73
2.73 0
4.09
10.22
122.65
1.46 0
2.92
5.84 0
10.22
Mnhr per
Work ItemQty / day Unit Crew
Unit
Qty # days
FINISHING WORKS
Marble/Granite Wall 1
0.727 63.88 46.46 0 1.6 1.6 m2/day 1 Fin. Mason
0.727 63.88 46.46 0 0.8 0.2 sm/hr/crew 1 Laborer
1.455 92.92 sm/mnday 2
Carpeting 1
1.875 63.88 119.78 0 13.61702 13.61702 m2/day 2 Installer
1.875 63.88 119.78 0 3.404255 1.702128 sm/hr/crew 2 Helper
3.750 239.55 sm/mnday 4
Wall Paper 1
1.000 63.88 63.88 0 21.33333 21.33333 m2/day 2 Installer
1.000 63.88 63.88 0 5.333333 2.666667 sm/hr/crew 2 Helper
2.000 127.76 sm/mnday 4
Pebble Washout 1
3.008 63.88 192.12 0 2.66 2.66 m2/day 1 Fin. Mason
0.000 63.88 - 0 2.66 0.3325 sm/hr/crew Helper
3.008 192.12 sm/mnday 1
Tie Beam 1
0.670 63.88 42.80 0 17 17 m³ 1 LM Mason
1.340 63.88 85.60 0 2.428571 2.125 m3/hr/crew 2 Ro Mason
5.360 63.88 342.40 m3/mnday 4 Helper
7.370 470.80 7
Column 1
1.390 63.88 88.79 0 19.5 19.5 m³ 1 LM Mason
2.780 63.88 177.59 0 2.166667 2.4375 m3/hr/crew 2 Ro Mason
13.900 63.88 887.93 m3/mnday 6 Helper
18.070 1,154.31 9
Parapet 1
1.130 63.88 72.18 0 20.5 20.5 m³ 1 LM Mason
2.260 63.88 144.37 0 2.277778 2.5625 m3/hr/crew 2 Ro Mason
11.300 63.88 721.84 m3/mnday 6 Helper
14.690 938.40 9
Suspended Slab 1
0.970 63.88 61.96 0 13.5 13.5 m³ 1 LM Mason
1.940 63.88 123.93 0 1.928571 1.817308 m3/hr/crew 2 Ro Mason
11.640 63.88 743.56 m3/mnday 4 Helper
14.550 929.45 7
Stair; Suspended 1
1.320 63.88 84.32 0 12.5 12.5 m³ 1 LM Mason
2.640 63.88 168.64 1.785714 1.682692 m3/hr/crew 2 Ro Mason
15.840 63.88 1,011.86 0 m3/mnday 4 Helper
19.800 1,264.82 7
Stairs; Grade 1
0.590 63.88 37.69 0 18 18 m³ 1 LM Mason
1.180 63.88 75.38 2.571429 2.25 m3/hr/crew 2 Ro Mason
5.900 63.88 376.89 0 m3/mnday 4 Helper
7.670 489.96 7
Wall 1
1.190 63.88 76.02 0 19.5 19.5 m³ 1 LM Mason
2.380 63.88 152.03 2.166667 2.4375 m3/hr/crew 2 Ro Mason
11.900 63.88 760.17 0 m3/mnday 6 Helper
15.470 988.22 9
Grade Slab 1
0.590 63.88 37.69 0 17 17 m³ 1 LM Mason
3.540 63.88 226.14 2.428571 2.125 m3/hr/crew 2 Ro Mason
7.080 63.88 452.27 0 m3/mnday 4 Helper
11.210 716.09 7
Roadways/Pavement 1
0.590 63.88 37.69 0 17 17 m³ 1 LM Mason
1.180 63.88 75.38 2.428571 2.125 m3/hr/crew 2 Ro Mason
5.900 63.88 376.89 0 m3/mnday 4 Helper
7.670 489.96 7
Lean Concrete 1
0.590 63.88 37.69 0 17 17 m³ 1 LM Mason
1.180 63.88 75.38 2.428571 2.125 m3/hr/crew 2 Ro Mason
5.900 63.88 376.89 0 m3/mnday 4 Helper
7.670 489.96 7
Mnhr
Work Item Qty / day Unit Crew
per Unit
Qty # days
FINISHING HARDWARES
Hinges 1
5.000 63.88 319.40 0 8 8 nr 1 Fin. Carp
5.000 63.88 319.40 0 8 1 nr/hr/crew
10.000 638.80 nr/mnday 1
Hinges; Invisible 1
0.750 63.88 47.91 0 2 2 nr 1 Fin. Carp
0.750 63.88 47.91 0 2 0.25 nr/hr/crew
1.500 95.82 nr/mnday 1
Locksets 1
1.000 63.88 63.88 0 2 2 nr 1 Fin. Carp
0.000 63.88 - 0 2 0.25 nr/hr/crew
1.000 63.88 nr/mnday 1
Door Closer 1
3.008 63.88 192.12 0 1.5 1.5 nr 1 Fin. Carp
0.000 63.88 - 0 1.5 0.1875 nr/hr/crew
3.008 192.12 nr/mnday 1
Flush Bolt 1
4 4 nr 1 Fin. Carp
4 0.5 nr/hr/crew
nr/mnday 1
Door Stop 1
6.6666667 6.6666667 nr 1 Fin. Carp
6.6666667 0.8333333 nr/hr/crew
nr/mnday 1
Pull Handle 1
2.2857143 2.2857143 set 1 Fin. Carp
2.2857143 0.2857143 nr/hr/crew
nr/mnday 1
Push Plate 1
2.2857143 2.2857143 set 1 Fin. Carp
2.2857143 0.2857143 nr/hr/crew
nr/mnday 1
Door Stop 1
5.3333333 5.3333333 set 1 Fin. Carp
5.3333333 0.6666667 nr/hr/crew
nr/mnday 1
Flush Bolt 1
2 2 set 1 Fin. Carp
2 0.25 nr/hr/crew
nr/mnday 1
CONCRETE EQUIPMENTS
CONCRETING WORKS
Concrete Mixer 1
0.471 64.57 30.39 0 16 16 m³ 1 1-Bagger
0.941 64.57 60.77 0
1.882 63.88 120.24
3.294 211.40 Concrete Vibrator 1
50 50 m³ 1 Conc. Vib
CONVENTIONAL FORMS
0.410 64.57 26.49 0 Column Area x
0.821 64.57 52.98 0 Pedestal Area x
2.462 63.88 157.24 Beam Area x
3.692 236.71 Conc. Wall Area x
Slab Area x
Curb & Gutter Area x
0.390 64.57 25.20 0 Conc Slab Area x
0.780 64.57 50.40 0 Sill & Lintel Area x
2.341 63.88 149.57 Scaffolding using 2 x 8 Area x
3.512 225.17 Scaffolding using 2 x 4 Area x
Nails Bdft /
Threshold 1
12.000 63.88 766.56 0 0.8 0.8 nr 1
0 0.8 0.1 nr/hr/crew
12.000 766.56 nr/mnday 1
Weather Strip 1
4.000 63.88 255.52 0 2 2 nr 1
0 2 0.25 nr/hr/crew
4.000 255.52 nr/mnday 1
Magnetic Latch 1
4.000 63.88 255.52 0 2.285714 2.285714 nr 1
0 2.285714 0.285714 nr/hr/crew
4.000 255.52 nr/mnday 1
Deadbolts 1
3.000 63.88 191.64 0 1.6 1.6 nr 1
0 1.6 0.2 nr/hr/crew
3.000 191.64 nr/mnday 1
0.160 0 - 0
0.160 -
33 bdft/m2
19 bdft/m2
34 bdft/m2
19 bdft/m2
25 bdft/m2
8.5 bdft/m2
36 bdft/m2
18 bdft/m2
6.56 bdft/m2
8.75 bdft/m2
55 bdft/kg
Mnhr
Crew Work ItemQty / day Unit Crew
per Unit
Qty # days
DRAINAGE WORKS
RCP 1200mmØ 1
Fin. Carp 1.250 63.88 79.85 0 6 6m 1
0 0.75 0.75 lm/hr/crew 7
1.250 79.85 lm/mnday 8
RCP 900mmØ 1
Fin. Carp 10.000 63.88 638.80 0 6.72 6.72 m 1
0 0.84 0.84 lm/hr/crew 7
10.000 638.80 lm/mnday 8
RCP 750mmØ 1
Fin. Carp 4.000 63.88 255.52 0 8.61 8.61 m 1
0 1.07625 1.07625 lm/hr/crew 7
4.000 255.52 lm/mnday 8
RCP 600mmØ 1
Fin. Carp 4.000 63.88 255.52 0 10.76 10.76 m 1
0 1.345 1.345 lm/hr/crew 7
4.000 255.52 lm/mnday 8
RCP 450mmØ 1
Fin. Carp 3.500 63.88 223.58 0 16.12 16.12 m 1
0 2.015 2.015 lm/hr/crew 7
3.500 223.58 lm/mnday 8
RCP 375mmØ 1
Fin. Carp 5.000 63.88 319.40 0 21.5 21.5 m 1
0 2.6875 2.6875 lm/hr/crew 7
5.000 319.40 lm/mnday 8
RCP 300mmØ 1
26 26 m 1
3.25 3.25 lm/hr/crew 7
lm/mnday 8
RCP 150mmØ 1
28.44444 28.44444 m 1
3.555556 3.555556 lm/hr/crew 7
lm/mnday 8
PVC 2½" Ø 1
20.40816 20.40816 m 1
4.081633 2.55102 lm/hr/crew 4
lm/mnday 5
PVC 3" Ø 1
18.51852 18.51852 m 1
3.703704 2.314815 lm/hr/crew 4
lm/mnday 5
PVC 4" Ø 1
15.26718 15.26718 m 1
3.053435 1.908397 lm/hr/crew 4
lm/mnday 5
PVC 5" Ø 1
12.19512 12.19512 m 1
2.439024 1.52439 lm/hr/crew 4
lm/mnday 5
PVC 6" Ø 1
8.130081 8.130081 m 1
1.626016 1.01626 lm/hr/crew 4
lm/mnday 5
PVC 8" Ø 1
7.692308 7.692308 m 1
1.538462 0.961538 lm/hr/crew 4
lm/mnday 5
PVC 10" Ø 1
7.079646 7.079646 m 1
1.415929 0.884956 lm/hr/crew 4
lm/mnday 5
PVC 12" Ø 1
6.666667 6.666667 m 1
1.333333 0.833333 lm/hr/crew 4
lm/mnday 5
Mnhr
Crew Work ItemQty / day Unit Crew
per Unit
Qty # days
DRAINAGE WORKS
Cast Iron Pipe 2"Ø 1
L/M Mason 1.333 63.88 85.17 0 18.26484 18.26484 lm/day 1
Helper 9.333 63.88 596.21 0 3.652968 2.283105 lm/hr/crew 4
10.667 681.39 lm/mnday 5
1
1 Backhoe w/ breaker 0.436 2,232.14 973.67 0 Compaction-Plate
1 Wheel Loader 0.436 1,255.00 547.44 0 119.40299
2 Dump Truck 0.436 544.80 475.29 119.40299
2 Labor 0.436 63.88 55.73 m3/mnday
2,052.13
Spreading-Equipment
1 400
4 Laborer 3.280 63.88 209.53 0 400
4 3.280 209.53 0 m3/mnday
1 Excavation-Eqpt
2 Ro. Mas 2.000 63.88 127.76 0 100
2 2.000 127.76 0 100
m3/eqptday
1 Excavation-Eqpt
1 Ro. Mas 0.667 63.88 42.59 0 200
1 0.667 42.59 0 200
m3/eqptday
1 Backfilling-Manual
1 Ro. Mas 0.650 63.88 41.52 0 29.131653
1 0.650 41.52 0 2.2408964
Tools 10% 4.15 m3/mnday
1 Backfilling-Eqpt
2 Skilled Worker 0.400 63.88 25.55 0 181.81818
2 0.400 25.55 0 181.81818
Tools 10% 2.56 m3/mnday
1
1 L/M Mason 0.266 63.88 16.99 0 Gravelfill-Manual
4 Helper 1.064 63.88 67.97 0 20.8
5 1.330 84.96 1.6
m3/mnday
1
1 L/M Mason 0.375 63.88 23.96 0 Hauling
3 Helper 1.125 63.88 71.87 0 36
4 1.500 95.82 1.8947368
m3/mnday
m3/mnday
1
1 L/M 0.600 53.46 32.08 0 Manual Trimming-0.30m
4 Mason 2.400 47.75 114.60 101.069
2 Carpenter 1.200 47.75 57.30 7.7745384
6 Helper 3.600 38.34 138.02 0 sm/mnday
13 7.800 342.00
Hauling
1 32
1 L/M 0.600 53.46 32.08 0 8
4 Mason 2.400 47.75 114.60 m3/mnday
8 Helper 4.800 38.34 184.03 0
13 7.800 330.71 Clearing & Grubbing-Manual
260
1 20
1 Dozer 0.015 63.88 0.96 0 m2/mnday
0
1 0.015 0.96 Clearing & Grubbing-Equipm
1000
1 1000
2 Laborer 0.170 63.88 10.86 m2/eqptday
2 0.170 10.86
Clearing & Grubbing-Equipm
666.66667
1 666.66667
2 Laborer 0.400 63.88 25.55 m2/eqptday
2 0.400 25.55
Compaction-Vib Roller 10t @ 6
650.72
1 650.72
2 Installer 0.490 63.88 31.30 m3/eqptday
2 0.490 31.30
Vib Roller 10t, 300mm lift
976
1 976
2 Installer 0.250 63.88 15.97 m3/eqptday
2 0.250 15.97
Production Rate: Vibratory Com
Drum width
Speed
Work/hr
Lift
2.135
488.061
@ 6 Passes
=
=
2.135
406.7175
@ 6 Passes
=
=
2.135
325.374
@ 6 Passes
=
=
2.135
244.0305
@ 6 Passes
=
=
0.4
60
@ 6 Passes
=
=
0.4
50
@ 6 Passes
=
=
0.4
40
@ 6 Passes
=
=
0.4
30
@ 6 Passes
=
=
Compaction-Plate 1
119.402985 m3/day 1 Plate Comp 0.067 74.40 4.98
14.9253731 m3/hr/crew 2 Labor 0.067 63.88 8.56
1 0.067 13.54
Spreading-Equipment 1
400 m3 1 Motor Grader 0.020 648.80 12.98
50 m3/hr/crew
0.02 1 0.020 12.98
Excavation-Eqpt 1
100 m3/day 1 Backhoe 0.080 1,783.04 142.64
12.500 m3/hr/crew -
m3/eqptday 1 0.080 142.64
Excavation-Eqpt 1
200 m3/day 1 Dozer 0.040 1,783.04 71.32
25.000 m3/hr/crew -
m3/eqptday 1 0.040 71.32
Backfilling-Manual 1
29.1316527 m3/day 1 LM 0.275 63.88 17.54
3.64145658 m3/hr/crew 12 Labor 3.295 63.88 210.51
13 3.570 228.05
Backfilling-Eqpt 1
181.818182 m3/day 1 Loader 0.044 1,255.00 55.22
22.7272727 m3/hr/crew 2 Labor 0.044 63.88 5.62
Tools (10% of Labor) 0.56
1 0.044 61.40
Gravelfill-Manual 1
20.8 m3/day 1 LM 0.385 63.88 24.57
2.6 m3/hr/crew 12 Labor 4.615 63.88 294.83
13 5.000 319.40
3
36 m3/day 1 F/M 0.222 63.88 14.20
4.5 m3/hr/crew 18 Labor 4.000 63.88 255.52
Tools (10% of Labor) 26.97
19 4.222 94.16
Manual Trimming-0.30m 1
101.068999 sm/day 1 LM Labor 0.079 63.88 5.06
12.6336249 sm/hr/crew 12 Labor 0.950 63.88 60.68
13 1.029 65.73
Tools 10% 6.57
1
32 m3/day 4 Labor 1.000 63.88 63.88
4 m3/hr/crew 4 1.000 63.88
m x 10 m/min x 50 min/hr x
cu.m./hr
@ 6 Passes @ 4 Passes
60 cu.m./hr 60 cu.m./hr
6 passes 4 passes
10 m3/hr 15 m3/hr
80 m3/day 120 m3/day
m x 10 m/min x 50 min/hr x
cu.m./hr
@ 6 Passes @ 4 Passes
50 cu.m./hr 50 cu.m./hr
6 passes 4 passes
m x 10 m/min x 50 min/hr x
cu.m./hr
@ 6 Passes @ 4 Passes
40 cu.m./hr 40 cu.m./hr
6 passes 4 passes
m x 10 m/min x 50 min/hr x
cu.m./hr
@ 6 Passes @ 4 Passes
30 cu.m./hr 30 cu.m./hr
6 passes 4 passes
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.30m
0
0
0.25m
0
0
0.20m
0
0
0.15m
0
0
0.30m
0
0
0.25m
0
0
0.20m
0
0
0.15m 455.40
18.75
24.29
0
0
Work ItemQty / day Unit Crew
Qty # days
CARPENTRY WORKS
Partition Stud 1
3.19 0 496.5517 496.5517 bf 1 LM Carpenter
- 0 45.14107 62.06897 bf/hr/crew 9 Fin. Carpenters
3.19 bf/mnday 1 Helper
0.32 11
Ceiling Joist 1
496.5517 496.5517 bf 1 LM Carpenter
45.14107 62.06897 bf/hr/crew 10 Fin. Carpenters
sm/mnday
11
Moulding/Cornice 1
32 32 lm/day 1 LM Carpenter
4.571429 4 lm/hr/crew 6 Fin. Carpenters
lm/mnday Helper
7
Baseboard Installation 1
26.66667 26.66667 lm/day 1 LM Carpenter
5.333333 3.333333 lm/hr/crew 4 Fin. Carpenters
lm/mnday
5
Mnhr
Work ItemQty / day Unit Crew
per Unit
Qty # days
PAINTING WORKS
Int Wall (Latex Paint) Plain Fi 1
0.016 63.88 1.03 0 15.28662 15.28662 sm/day 1 Painter
0.145 63.88 9.26 0 5.095541 1.910828 sm/hr/crew 2 Helper
0.0161 63.88 1.03 sm/mnday 3
0.177 11.32
Duco/Varnish 1
0.200 63.88 12.78 0 12 12 sm/day 1 Painter
0.800 63.88 51.10 0 4 1.5 sm/hr/crew 2 Helper
0.800 63.88 51.10 sm/mnday 3
1.800 114.98
Duco/Varnish-Baseboard 1
0.268 63.88 17.09 0 19.2 19.2 lm/day 1 Painter
1.070 63.88 68.35 0 6.4 2.4 lm/hr/crew 2 Helper
1.070 63.88 68.35 lm/mnday 3
2.408 153.79
Painting Wood 1
40 40 sm/day 1 FM
0.333 63.88 21.24 0 4 5 sm/hr/crew 3 Painter
1.330 63.88 84.96 0 sm/mnday 6 Helper
1.330 63.88 84.96 10
2.993 191.16
Ceiling Joist 1
496.5517 496.5517 bf 1 LM Carpen
0.016 63.88 1.03 0 9 Fin. Carpen
0.161 63.88 10.29 0 1 Helper
0.000 63.88 - 11
0.177 11.32
0.170 10.86
1.258 80.36
1.500 95.82
Mnhr
per Unit
Qty # days