LABOR RATE PER TRADE Rate/Day

Laborer/Helper 382.00 1.00 22.00 22.00 404.00


Ro. Mason 387.00 0.99 22.00 21.72 408.72
Ro. Carpenter 387.00 0.99 22.00 21.72 408.72
Steelman 387.00 0.99 22.00 21.72 408.72
Fin. Mason 392.00 0.97 22.00 21.44 413.44
Fin. Carp 392.00 0.97 22.00 21.44 413.44
Tile Setter 400.00 0.96 22.00 21.01 421.01
Painter 400.00 0.96 22.00 21.01 421.01

COMPOSITE RATE
HELPER / LABORER
MINIMUM RATE PER DAY P 404.00

CONSIDER ONE (1) YEAR = 365 DAYS

COMPENSATION FOR 1 YEAR: P 404.00 x 365 days =

OVERTIME PREMIUM: Premium


Legal Holidays - 10 Legal Holidays
P 404.00 x 10 x 100.00% =

Special Holidays - 5 Spl. Holidays P 404.00 x 5 x 30.00% =

Sunday O.T. - 50 Sundays P 404.00 x 50 x 30.00% =

Min. 2 Hours Reg. O.T. 2 P 50.50 x 300 x 125.00% =


Sub-Total

Ave. Compensation per Month P 196,041.00 / 12 mos.

SOCIAL OBLIGATIONS:
13TH MO. PAY 147,460.00 / 12 mos. =
SSS 1,090.00 x 12 mos. =
Philhealth 187.50 x 12 mos. =
Pag-ibig 100.00 x 12 mos. =
Sub-Total

GRAND TOTAL

Social Obligation / Total Compensation 28,818.33 / 147,460.00 =

COMPOSITE RATE PER MANHOUR 224,859.33 / 3520 MH =


(including Social Obligation) 63.88 / 50.50

Total MH
Reg. Hr. 365 x 8 2920
OT Hr. 300 x 2 600
Total MH 3520
520 4040
Legal Holidays National Special Holidays National
Jan 1 New Year 1 Black Saturday
Holy Thursday 1 Aug 21 Ninoy Aquino Day
Good Friday 1 Nov 1 All Souls Day
April 9 Bataan Day 1 EDSA 1

May 1 Labor Day 1 Ramadan


June 12 Independence Day 1
Aug last Monday National Heroes Day 1
Nov 30 Bonifacio Day 1
Dec 25 Christmas day 1
Dec 30 Rizal Day 1
10

362
/Day 45.25
SSS 2.69
PH 1.67
13 11.9 16.26
total 61.51 1.359337017

Electrician
Comm Engr
Driver
Welder
Glazier
Air Comp 3.11
Air Comp 5.95

m.Crane 10T

Dozer

Salary 13,000.00 /mo. Salary 10,504.00 /mo.


SOB SOB
13th mo 1,083.33 13th mo 875.33
SSS 918.70 SSS 742.00
Philhealth 162.50 Philhealth 125.00
Pag-Ibig 100.00 Pag-Ibig 100.00
Total 2,264.53 17.42% Total 1,842.33 17.54%

Salary 14,000.00 /mo.


SOB
13th mo 1,166.67
SSS 989.30
Philhealth 175.00
Pag-Ibig 100.00
Total 2,430.97 17.36%

Salary 15,000.00 /mo.


SOB
13th mo 1,250.00
SSS 1,060.00
Philhealth 187.50
Pag-Ibig 100.00
Total 2,597.50 17.32%

Salary 16,000.00 /mo.


SOB
13th mo 1,333.33
SSS 1,060.00
Philhealth 200.00
Pag-Ibig 100.00
Total 2,693.33 16.83%

Salary 17,000.00 /mo.


SOB
13th mo 1,416.67
SSS 1,060.00
Philhealth 212.50
Pag-Ibig 100.00
Total 2,789.17 16.41%

Salary 18,000.00 /mo.


SOB
13th mo 1,500.00
SSS 1,060.00
Philhealth 225.00
Pag-Ibig 100.00
Total 2,885.00 16.03%

Salary 19,000.00 /mo.


SOB
13th mo 1,583.33
SSS 1,060.00
Philhealth 237.50
Pag-Ibig 100.00
Total 2,980.83 15.69%

Salary 20,000.00 /mo.


SOB
13th mo 1,666.67
SSS 1,060.00
Philhealth 250.00
Pag-Ibig 100.00
Total 3,076.67 15.38%

Salary 25,000.00 /mo.


SOB
13th mo 2,083.33
SSS 1,060.00
Philhealth 312.50
Pag-Ibig 100.00
Total 3,555.83 14.22%
Salary 30,000.00 /mo.
SOB
13th mo 2,500.00
SSS 1,060.00
Philhealth 375.00
Pag-Ibig 100.00
Total 4,035.00 13.45%

Salary 40,000.00 /mo.


SOB
13th mo 3,333.33
SSS 1,060.00
Philhealth 375.00
Pag-Ibig 100.00
Total 4,868.33 12.17%

Salary 50,000.00 /mo.


SOB
13th mo 4,166.67
SSS 1,060.00
Philhealth 375.00
Pag-Ibig 100.00
Total 5,701.67 11.40%

Salary 60,000.00 /mo.


SOB
13th mo 5,000.00
SSS 1,060.00
Philhealth 375.00
Pag-Ibig 100.00
Total 6,535.00 10.89%

SALARY % SOB
Php 13,000.00 /mo 17.50%
Php 14,000.00 /mo 17.50%
Php 15,000.00 /mo 17.50%
Php 16,000.00 /mo 17.00%
Php 17,000.00 /mo 16.50%
Php 18,000.00 /mo 16.00%
Php 19,000.00 /mo 15.75%
Php 20,000.00 /mo 15.50%
Php 25,000.00 /mo 14.25%
Php 30,000.00 /mo 13.50%
Php 40,000.00 /mo 12.25%
Php 50,000.00 /mo 11.50%
Php 60,000.00 /mo 11.00%
387.00
387.00
387.00
392.00
392.00
400.00
400.00

COMPOSITE RATE
ROUGH MASON / ROUGH CARPENTER / STEELMAN
MINIMUM RATE PER DAY P 408.72

CONSIDER ONE (1) YEAR = 365 DAYS

147,460.00 COMPENSATION FOR 1 YEAR: P 408.72 x 365 days

OVERTIME PREMIUM:
Legal Holidays - 10 Legal Holidays
4,040.00 P 408.72 x 10 x

606.00 Special Holidays - 5 Spl. Holidays P 408.72 x 5 x

6,060.00 Sunday O.T. - 50 Sundays P 408.72 x 50 x

37,875.00 48,581.00 Min. 2 Hours Reg. O.T. 2 P 51.09 x 300 x


196,041.00 55.69346591 Sub-Total

16,336.75 Ave. Compensation per Month P 198,329.32 / 12 mos.

SOCIAL OBLIGATIONS:
12,288.33 13TH MO. PAY 149,181.25 / 12 mos.
13,080.00 SSS 1,090.00 x 12 mos.
2,250.00 Philhealth 187.50 x 12 mos.
1,200.00 Pag-ibig 100.00 x 12 mos.
28,818.33 176,278.33 Sub-Total

224,859.33 GRAND TOTAL

19.54% Social Obligation / Total Compensation 28,961.77 / 198,329.32

63.88 /MH COMPOSITE RATE PER MANHOUR 227,291.09 / 3520


1.2650 (including Social Obligation) 64.57 / 51.09
59.42
Total MH
Reg. Hr. 365 x 8 2920
OT Hr. 300 x 2 600
Total MH 3520

Legal Holidays National Special Holidays National


Black Saturday 1 Jan 1 New Year 1
Ninoy Aquino Day 1 Holy Thursday 1 Aug
All Souls Day 1 Good Friday 1 Nov
1 April 9 Bataan Day 1

1 May 1 Labor Day 1


5 June 12 Independence Day 1
Aug last Monday National Heroes Day 1
Nov 30 Bonifacio Day 1
Dec 25 Christmas day 1
Dec 30 Rizal Day 1
10

362
/Day 45.25
SSS 2.69
PH 1.67
13 11.9 16.26
total 61.51 1.359337017

65.68
138.22115384615
64.1025
78.75
94.5
325
422

526

2,229.46
COMPOSITE RATE
PENTER / STEELMAN FINISHING MASON / FINISHING CAR
MINIMUM RATE PER DAY P 413.44

CONSIDER ONE (1) YEAR = 365 DAYS

= 149,181.25 COMPENSATION FOR 1 YEAR: P 413.44 x

Premium OVERTIME PREMIUM:


Legal Holidays - 10 Legal Holidays
100.00% = 4,087.16 P 413.44 x

30.00% = 613.07 Special Holidays - 5 Spl. Holidays P 413.44 x

30.00% = 6,130.74 Sunday O.T. - 50 Sundays P 413.44 x

125.00% = 38,317.10 49,148.07 Min. 2 Hours Reg. O.T. 2 P 51.68 x


198,329.32 56.34355708 Sub-Total

16,527.44 Ave. Compensation per Month P 200,621.17 /

SOCIAL OBLIGATIONS:
= 12,431.77 13TH MO. PAY 150,905.15 /
= 13,080.00 SSS 1,090.00 x
= 2,250.00 Philhealth 187.50 x
= 1,200.00 Pag-ibig 100.00 x
28,961.77 178,143.02 Sub-Total

227,291.09 GRAND TOTAL

= 14.60% Social Obligation / Total Compensation 29,105.43

MH = 64.57 /MH COMPOSITE RATE PER MANHOUR 229,726.60


1.2639 (including Social Obligation) 65.26

Total MH
Reg. Hr. 365 x 8 2920
OT Hr. 300 x 2 600
Total MH 3520

Special Holidays National Legal Holidays National


Black Saturday 1 Jan 1 New Year 1
21 Ninoy Aquino Day 1 Holy Thursday 1
1 All Souls Day 1 Good Friday 1
EDSA 1 1 April 9 Bataan Day 1

Ramadan 1 May 1 Labor Day 1


5 June 12 Independence Day 1
Aug last Monday National Heroes Day 1
Nov 30 Bonifacio Day 1
Dec 25 Christmas day 1
Dec 30 Rizal Day 1
10

362
/Day 45.25
SSS 2.69
PH 1.67
13 11.9 16.26
total 61.51 1.359337017
COMPOSITE RATE
INISHING MASON / FINISHING CARPENTER TI
MINIMUM RATE PER DAY

CONSIDER ONE (1) YEAR = 365 DAYS

365 days = 150,905.15 COMPENSATION FOR 1 YEAR:

Premium OVERTIME PREMIUM:


Legal Holidays - 10 Legal Holidays
10 x 100.00% = 4,134.39

5 x 30.00% = 620.16 Special Holidays - 5 Spl. Holidays

50 x 30.00% = 6,201.58 Sunday O.T. - 50 Sundays

300 x 125.00% = 38,759.89 49,716.02 Min. 2 Hours Reg. O.T. 2


200,621.17 56.99465074 Sub-Total

12 mos. 16,718.43 Ave. Compensation per Month

SOCIAL OBLIGATIONS:
12 mos. = 12,575.43 13TH MO. PAY
12 mos. = 13,080.00 SSS
12 mos. = 2,250.00 Philhealth
12 mos. = 1,200.00 Pag-ibig
29,105.43 180,010.58 Sub-Total

229,726.60 GRAND TOTAL

/ 200,621.17 = 14.51% Social Obligation / Total Compensation

/ 3520 MH = 65.26 /MH COMPOSITE RATE PER MANHOUR


/ 51.67984694 1.2628 (including Social Obligation)

Total MH
Reg. Hr. 365 x
OT Hr. 300 x
Total MH

Special Holidays National Legal Holidays National


Black Saturday 1 Jan 1 New Year
Aug 21 Ninoy Aquino Day 1 Holy Thursday
Nov 1 All Souls Day 1 Good Friday
EDSA 1 1 April 9 Bataan Day

Ramadan 1 May 1 Labor Day


5 June 12 Independence Day
Aug last Monday National Heroes Day
Nov 30 Bonifacio Day
Dec 25 Christmas day
Dec 30 Rizal Day

362
/Day 45.25
SSS 2.69
PH 1.67
13 11.9 16.26
total 61.51 1.359337017
TILE SETTER / PAINTER
P 421.01

R = 365 DAYS

P 421.01 x 365 days = 153,668.65

Premium 10

P 421.01 x 10 x 100.00% = 4,210.10

P 421.01 x 5 x 30.00% = 631.52

P 421.01 x 50 x 30.00% = 6,315.15

P 52.63 x 300 x 125.00% = 39,469.69 50,626.46


204,295.11 58.0383821

P 204,295.11 / 12 mos. 17,024.59

153,668.65 / 12 mos. = 12,805.72


1,090.00 x 12 mos. = 13,080.00
200.00 x 12 mos. = 2,400.00
100.00 x 12 mos. = 1,200.00
29,485.72 183,154.37

233,780.83

29,485.72 / 204,295.11 = 14.43%

233,780.83 / 3520 MH = 66.42 /MH


66.42 / 52.62625 1.2621

8 2920
2 600
3520

Special Holidays National


1 Black Saturday 1
Holy Thursday 1 Aug 21 Ninoy Aquino Day 1
1 Nov 1 All Souls Day 1
1 EDSA 1 1

1 Ramadan 1
Independence Day 1 5
National Heroes Day 1
Bonifacio Day 1
Christmas day 1
1
10
13.33333 1
1
2
4

13.33333 1
1
2
4

9.378664 1
1
2
6

10.62417 1
1
2
6

7.843137 1
1
2
4

8.510638 1
1
2
4

5.813953 1
1
2
4

12.69841 1
1
2
4

10.32258 1
1
2
6

12.69841 1
1
2
4

12.69841 1
1
2
4

12.69841 1
1
2
4
Mnhr per
Work Item Qty / day Unit Crew
Unit
Qty
MASONRY WORKS
8" CHB Laying 1
8 8 sm 1 Ro. Mason 1.000 63.88 63.88
2.6666666667 1 sm/hr/crew 2 Helper 2.000 63.88 127.76
sm/mnday 3 3.000 191.64

6" CHB Laying 1


10 10 sm 1 Ro. Mason 0.800 63.88 51.10 16,066.00
3.3333333333 1.250 sm/hr/crew 2 Helper 1.600 63.88 102.21
sm/mnday 3 2.400 153.31
1.25
4" CHB Laying 1
12 12 sm 1 Ro. Mason 0.667 63.88 42.59 3,330.00
4 1.5 sm/hr/crew 2 Helper 1.333 63.88 85.17
sm/mnday 3 2.000 127.76

Plastering int 1
10 10 sm 1 Fin Mason 0.800 63.88 51.10
3.3333333333 1.25 sm/hr/crew 2 Helper 1.600 63.88 102.21
sm/mnday 3 2.400 153.31

Plastering ext 1
8 8 sm 1 Fin Mason 1.000 63.88 63.88
2.6666666667 1 sm/hr/crew 2 Helper 2.000 63.88 127.76
sm/mnday 3 3.000 191.64

Lineal Plastering 1
15 15 lm 1 Fin Mason 0.533 63.88 34.07
7.5 1.875 lm/hr/crew 1 Helper 0.533 63.88 34.07
lm/mnday 2 1.067 68.14

Scratch Coat/Render 1
17.777777778 17.777778 sm 1 Fin Mason 0.450 63.88 28.75
8.8888888889 2.2222222 sm/hr/crew 1 Helper 0.450 63.88 28.75
sm/mnday 2 0.900 57.49

Lintel Beam/Stiff Col 1


10 10 lm 1 Ro. Mason 0.800 63.88 51.10
3.3333333333 1.25 lm/hr/crew 2 Helper 1.600 63.88 102.21
sm/mnday 3 2.400 153.31

Lintel Beam/Stiff Col 1


8 8 sm 1 Ro. Mason 1.000 63.88 63.88
2.6666666667 1 sm/hr/crew 2 Helper 2.000 63.88 127.76
sm/mnday 3 3.000 191.64

REBAR WORKS
Fabrication & Installation 1
1375 1375 kg 1 LM 0.006 63.88 0.37
125 171.875 kgm/hr/crew 10 Steelman 0.058 63.88 3.72
kg/mnday 11 0.064 4.09

Hauling 1
9600 9600 kg 6 Helper 0.005 63.88 0.32
1600 1200 kgm/hr/crew 6 0.005 0.32
kg/mnday

CONCRETING WORKS
Concrete-Fdn, ftng 1
14 m³ 1 Ro. Mason 0.571 50.5 28.86
3 Helper 1.714 50.5 86.57
2.286 115.43

Column 1
14.5 m³ 1 Ro. Mason 0.552 50.5 27.86
4 Helper 2.207 50.5 111.45
2.759 139.31

Shear Wall 1
14.5 m³ 1 Ro. Mason 0.552 50.5 27.86
4 Helper 2.207 50.5 111.45
2.759 139.31

Concrete-B&G, S/Slab 1
18 m³ 2 Ro. Mason 0.889 50.5 44.89
1 Ro. Carp 0.444 50.5 22.44
4 Helper 1.778 50.5 89.78
3.111 157.11

Stairs 1
13.5 m³ 2 Ro. Mason 1.185 50.5 59.85
4 Helper 2.370 50.5 119.70
3.556 179.56

RW/RC Wall 1
14.5 m³ 1 Ro. Mason 0.552 50.5 27.86
4 Helper 2.207 50.5 111.45
2.759 139.31
Grade Slab 1
18 m³ 2 Ro. Mason 0.889 50.5 44.89
4 Helper 1.778 50.5 89.78
2.667 134.67

Grouting (nonshrink) 1
0.118 m³ 1 Ro. Mason 67.797 50.5 3,423.73
67.797 3,423.73

4" CHB Laying 1


64 64 sm 1 LM Mason 0.125 63.88 7.99
4 8 sm/hr/crew 5 Ro. Mason 0.625 63.88 39.93
sm/mnday 10 Helper 1.250 63.88 79.85
16 2.000 127.76

Installation WWF 1
1955.5555556 1955.5556 kg 1 Steelman 0.004 63.88 0.26
177.77777778 244.44444 kgm/hr/crew 10 Steelman 0.041 63.88 2.61
kg/mnday 11 0.045 2.87
CONCRETING WORKS
Footing 1
18 18 m³ 1 LM Mason 0.444 64.57 28.70
2 Ro Mason 0.889 64.57 57.40
4 Helper 1.778 63.88 113.56
7 3.111 199.66

Tie Beam 1
18 18 m³ 1 LM Mason 0.444 64.57 28.70
2 Ro Mason 0.889 64.57 57.40
4 Helper 1.778 63.88 113.56
7 3.111 199.66

Column 1
20.5 20.5 m³ 1 LM Mason 0.390 64.57 25.20
2 Ro Mason 0.780 64.57 50.40
6 Helper 2.341 63.88 149.57
9 3.512 225.17

Parapet 1
21.5 21.5 m³ 1 LM Mason 0.372 64.57 24.03
2 Ro Mason 0.744 64.57 48.05
6 Helper 2.233 63.88 142.62
9 3.349 214.69

Beams and Girders 1


14.5 14.5 m³ 1 LM Mason 0.276 64.57 17.81
2 Ro Mason 1.103 64.57 71.25
4 Helper 2.207 63.88 140.98
7 3.586 230.04

Suspended Slab 1
14.5 14.5 m³ 1 LM Mason 0.276 64.57 17.81
2 Ro Mason 1.103 64.57 71.25
4 Helper 2.207 63.88 140.98
7 3.586 230.04

Stair; Suspended 1
13.5 13.5 m³ 1 LM Mason 0.296 64.57 19.13
2 Ro Mason 1.185 64.57 76.53
4 Helper 2.370 63.88 151.42
7 3.852 247.08

Stairs; Grade 1
19 19 m³ 1 LM Mason 0.421 64.57 27.19
2 Ro Mason 0.842 64.57 54.37
4 Helper 1.684 63.88 107.59
7 2.947 189.15

Wall 1
20.5 20.5 m³ 1 LM Mason 0.390 64.57 25.20
2 Ro Mason 0.780 64.57 50.40
6 Helper 2.341 63.88 149.57
9 3.512 225.17

Grade Slab 1
18 18 m³ 1 LM Mason 0.444 64.57 28.70
2 Ro Mason 0.889 64.57 57.40
4 Helper 1.778 63.88 113.56
7 3.111 199.66

Roadways/Pavement 1
18 18 m³ 1 LM Mason 0.444 64.57 28.70
2 Ro Mason 0.889 64.57 57.40
4 Helper 1.778 63.88 113.56
7 3.111 199.66

Lean Concrete 1
18 18 m³ 1 LM Mason 0.444 64.57 28.70
2 Ro Mason 0.889 64.57 57.40
4 Helper 1.778 63.88 113.56
7 3.111 199.66
Mnhr per
Work Item Qty / day Unit Crew
Unit
# days
FORMWORKS
Footings, Pile Cap 1
0 35.955056 35.955056 sm/day 1 LM 0.222 63.88
0 2.7657736 4.494382 sm/hr/crew 12 Ro. Carp 2.670 63.88
sm/mnday 13 2.893

Ftgs, Fndtn.-complex 1
1607 23.111111 23.111111 sm/day 1 LM 0.346 63.88
53.56666667 1.7777778 2.8888889 sm/hr/crew 12 Ro. Carp 4.154 63.88
sm/mnday 13 4.500

Tie Beam 1
278.00 38.951311 38.951311 sm/day 1 LM 0.205 63.88
9.266666667 2.9962547 4.8689139 sm/hr/crew 12 Ro. Carp 2.465 63.88
sm/mnday 13 2.670

Columns 1
0 32 32 sm/day 1 LM 0.250 63.88
0 2.4615385 4 sm/hr/crew 12 Ro. Carp 3.000 63.88
sm/mnday 13 3.250

Beams & Girders 1


0 29.538462 29.538462 sm/day 1 LM 0.271 63.88
0 2.2721893 3.6923077 sm/hr/crew 12 Ro. Carp 3.250 63.88
sm/mnday 13 3.521

Beams & Girders; curve 1


0 25.6 25.6 sm/day 1 LM 0.313 63.88
0 2.1333333 3.2 sm/hr/crew 12 Ro. Carp 3.750 63.88
sm/mnday 13 4.063

Stairs 1
0 16.812609 16.812609 sm/day 1 LM 0.476 63.88
0 1.2932777 2.1015762 sm/hr/crew 12 Ro. Carp 5.710 63.88
sm/mnday 13 6.186

Suspended Slab/Canopy 1
0 30 30 sm/day 1 LM 0.267 63.88
2.3076923 3.4615385 sm/hr/crew 12 Ro. Carp 3.200 63.88
sm/mnday 13 3.467

Soffits of landings 1
0 5.2493438 5.2493438 sm/day 2 Ro. Carp 3.048 63.88
2.6246719 0.656168 sm/hr/crew 2 3.048
sm/mnday

Soffits of staircases 1
5.1496621 5.1496621 sm/day 2 Ro. Carp 3.107 63.88
0 2.574831 0.6437078 sm/hr/crew 2 3.107
sm/mnday
0
Drop Walls 1
5.7204147 5.7204147 sm/day 2 Ro. Carp 2.797 63.88
0 2.8602074 0.7150518 sm/hr/crew 2 2.797
0 sm/mnday

Lintel Beams/Columns 1
2.519685 2.519685 sm/day 2 Ro. Carp 6.350 63.88
1.2598425 0.3149606 sm/hr/crew 2 6.350
0 sm/mnday
0
Cisterns 1
10 10 sm/day 4 Ro. Carp 3.200 63.88
2.5 1.25 sm/hr/crew 4 3.200
0 sm/mnday
0
Elev. Pit 1
10 10 sm/day 4 Ro. Carp 3.200 63.88
2.5 1.25 sm/hr/crew 4 3.200
0 sm/mnday
0
Shearwall/Elev Wall 1
10 10 sm/day 4 Ro. Carp 3.200 63.88
2.5 1.25 sm/hr/crew 4 3.200
0 sm/mnday
0
RW/RC Wall-straight 1
30 30 sm/day 1 LM 0.267 63.88
2.5 3.4615385 sm/hr/crew 12 Ro. Carp 3.200 63.88
sm/mnday 13 3.467
0
0 RW/RC Wall-radial 1
8 8 sm/day 4 Ro. Carp 4.000 63.88
2 1 sm/hr/crew 4 4.000
sm/mnday
0
0 Trench 1
8 8 sm/day 4 Ro. Carp 4.000 63.88
2 1 sm/hr/crew 4 4.000
sm/mnday
0
0 Curbs & Gutter 1
8.7912088 8.7912088 sm/day 4 Ro. Carp 3.640 63.88
2.1978022 1.0989011 sm/hr/crew 4 3.640
sm/mnday
0
Slab on Grade 1
23.970037 23.970037 sm/day 1 LM 0.334 63.88
2.9962547 2.6633375 sm/hr/crew 8 Ro. Carp 2.670 63.88
sm/mnday 8 3.004
-
0 Column -Circular 1
10.15873 10.15873 sm/day 4 Ro. Carp 3.150 63.88
2.5396825 1.2698413 sm/hr/crew 4 3.150
sm/mnday
0
Vertical Fins 1
0 12 12 sm/day 6 Ro. Carp 4.000 63.88
2 1.5 sm/hr/crew 6 4.000
sm/mnday

Stairs on Grade 1
8.6253369 8.6253369 sm/day 4 Ro. Carp 3.710 63.88
2.1563342 1.0781671 sm/hr/crew 4 3.710
sm/mnday
CONCRETE: Ready Mixed Concrete 3/4" Agg.
CONCRETING WORKS
Footing 1
0 54.285714 54.285714 m³/day 1 LM Mason 0.147 63.88
0 2.8571429 6.7857143 m3/hr/crew 6 Ro Mason 0.884 63.88
m3/mnday 12 Laborer 1.768 63.88
19 2.800

Tie Beam 1
0 54.285714 54.285714 m³/day 1 LM Mason 0.147 63.88
0 2.8571429 6.7857143 m3/hr/crew 6 Ro Mason 0.884 63.88
m3/mnday 12 Laborer 1.768 63.88
19 2.800

Column 1
0 29.699101 29.699101 m³/day 1 LM Mason 0.269 63.88
0 1.5631106 3.7123877 m3/hr/crew 6 Ro Mason 1.616 63.88
m3/mnday 12 Laborer 3.232 63.88
19 5.118

Parapet 1
0 33.643205 33.643205 m³/day 1 LM Mason 0.238 63.88
0 1.770695 4.2054006 m3/hr/crew 6 Ro Mason 1.427 63.88
m3/mnday 12 Laborer 2.853 63.88
19 4.518

Beams and Girders 1


0 35.354775 35.354775 m³/day 1 LM Mason 0.226 116.03
0 1.8607776 4.4193469 m3/hr/crew 6 Ro Mason 1.358 92.39
m3/mnday 12 Laborer 2.715 56.59
19 4.299

Suspended Slab 1
0 37.31893 37.31893 m³/day 1 LM Mason 0.214 63.88
0 1.9641542 4.6648662 m3/hr/crew 6 Ro Mason 1.286 63.88
m3/mnday 12 Laborer 2.572 63.88
19 4.073

Stair; Suspended 1
0 25.490525 25.490525 m³/day 1 LM Mason 0.314 63.88
1.3416066 3.1863156 m3/hr/crew 6 Ro Mason 1.883 63.88
0 m3/mnday 3.1863156 12 Laborer 3.766 63.88
19 5.963

Stairs; Grade 1
0 51.70068 51.70068 m³/day 1 LM Mason 0.155 63.88
2.7210884 6.462585 m3/hr/crew 6 Ro Mason 0.928 63.88
0 m3/mnday 12 Laborer 1.857 63.88
19 2.940

Wall 1
0 32.688172 32.688172 m³/day 1 LM Mason 0.245 63.88
1.7204301 4.0860215 m3/hr/crew 6 Ro Mason 1.468 63.88
0 m3/mnday 12 Laborer 2.937 63.88
19 4.650

Grade Slab 1
0 51.70068 51.70068 m³/day 1 LM Mason 0.155 63.88
2.7210884 6.462585 m3/hr/crew 6 Ro Mason 0.928 63.88
0 m3/mnday 12 Laborer 1.857 63.88
19 2.940

Roadways/Pavement 1
0 51.70068 51.70068 m³/day 1 LM Mason 0.155 63.88
2.7210884 6.462585 m3/hr/crew 6 Ro Mason 0.928 63.88
0 m3/mnday 12 Laborer 1.857 63.88
19 2.940

Lean Concrete 1
0 19.047619 19.047619 m³/day 1 LM Mason 0.420 63.88
2.7210884 2.3809524 m3/hr/crew 2 Ro Mason 0.840 63.88
0 m3/mnday 4 Laborer 1.680 63.88
7 2.940

Column 1
29.699101 29.699101 m³/day 1 LM Mason 0.269 63.88
1.5631106 3.7123877 m3/hr/crew 6 Ro Mason 1.616 63.88
m3/mnday 12 Laborer 3.232 63.88
19 5.118

Lintel Beam/Stiff Col 1


14.067995 14.067995 m³/day 1 LM Mason 0.569 63.88
1.5631106 1.7584994 m3/hr/crew 2 Ro Mason 1.137 63.88
m3/mnday 6 Laborer 3.412 63.88
9 5.118
Vertical Fins 1
15.483871 15.483871 m³/day 1 LM Mason 0.517 63.88
1.7204301 1.9354839 m3/hr/crew 2 Ro Mason 1.033 63.88
m3/mnday 6 Laborer 3.100 63.88
9 4.650

Drilling 1
500 500 ml/day 1 Laborer 0.016 63.88
500 62.5 ml/hr/crew Ro Mason 0.000 63.88
ml/mnday Laborer 0.000 63.88
1 0.016

Casting Moulding (Conc & Forms) 1


750 750 kg/day 1 LM 0.011 63.88
50 93.75 kg/hr/crew 4 Ro Mason 0.043 63.88
kg/mnday 4 Carpenter 0.043 63.88
6 Laborer 0.064 63.88
15 0.160

Installation Moulding 1
350 350 kg/day 1 LM 0.023 63.88
50 43.75 kg/hr/crew 2 Ro Mason 0.046 63.88
kg/mnday 4 Laborer 0.091 63.88
7 0.160
Work Item Qty / day Unit Crew
Qty # days
FINISHING WORKS
Vinyl Floor Tile 1
14.21 0 10.996564 11 m2/day 1 Installer
170.56 10.996564 1.375 sm/hr/crew 1 Helper
184.773 sm/mnday 2

Ceramic Floor Tiles 1


22.11 0 4.3478261 4.3478261 m2/day 1 Tile Setter
265.35 2.173913 0.5434783 sm/hr/crew 1 Helper
287.460 sm/mnday 2

Ceramic Wall Tiles 1


13.12 0 4.2666667 4.2666667 m2/day 1 Tile Setter
157.44 2.1333333 0.5333333 sm/hr/crew 1 Helper
170.560 sm/mnday 2

Listel Tiles 1
15.97 0 8 8 m2/day 1 Tile Setter
191.64 4 1 lm/hr/crew 1 Helper
207.610 lm/mnday 2

Tile Trim 1
17.30 0 16 16 lm/day 1 Tile Setter
207.61 16 2 lm/hr/crew Helper
224.911 sm/mnday 1

Cement/Conc Tiles 1
19.96 0 4.35 4.35 m2/day 1 Tile Setter
239.55 2.175 0.54375 sm/hr/crew 1 Helper
259.513 sm/mnday 2

Pebble Washout 1
30.40 0 2.66 2.66 m2/day 1 Fin. Mason
364.75 2.66 0.3325 sm/hr/crew Helper
395.151 sm/mnday 1

Plain Cement Floor Fin 1


17.03 0 10.666667 10.666667 m2/day 1 Fin. Mason
204.42 5.3333333 1.3333333 sm/hr/crew 1 Helper
221.451 sm/mnday 2

Flr Topping 50mm thk (tiles) 1


194.71 0 16 16 m2/day 2 Fin. Mason
194.71 3.2 2 sm/hr/crew 3 Helper
sm/mnday 5

Flr Topping 50mm thk (resilient floor 1


198.48 0 14.992504 14.992504 m2/day 2 Fin. Mason
198.48 2.9985007 1.874063 sm/hr/crew 3 Helper
sm/mnday 5

Floor Topping 50mm thk 1


178.67 0 16 16 m2/day 2 Fin. Mason
178.67 3.2 2 sm/hr/crew 3 Helper
sm/mnday 5

Rubbed Concrete/Skim Coat 1


405.64 0 16 16 m2/day 1 Fin. Mason
405.64 8 2 sm/hr/crew 1 Helper
sm/mnday 2

Brass strip 1
204.42 0 8 8 lm/day 1 Fin. Mason
204.42 8 1 lm/hr/crew
sm/mnday 1

Skirting 1
204.42 0 5.3015242 5.3015242 lm/day 1 Carpenter
204.42 5.3015242 0.6626905 lm/hr/crew
sm/mnday 1

Grooves on concrete 1
204.42 0 40 40 lm/day 2 Mason
204.42 20 5 lm/hr/crew
lm/mnday 2

Tiktik 1
17.03 10 10 m2/day 1 Laborer
204.42 0 10 1.25 sm/hr/crew
221.45 sm/mnday 1

Granite Floor 1
255.52 4 4 m2/day 1 Tile Setter
255.52 2 0.5 sm/hr/crew 1 Helper
sm/mnday 2

Cyclone Wire Installation 1


255.52 5.1275478 5.1275478 m2 2 Steelman
255.52 2.5637739 0.6409435 sm/hr/crew
sm/mnday 2

Marble/Granite Floor 1
232.52 3.3898305 3.3898305 m2 1 Fin. Mason
232.52 1.6949153 0.4237288 sm/hr/crew 1 Laborer
sm/mnday 2

Plain cement floor finish 1


21.32 0 16 16 m2 1 Fin. Mason
170.56 0 8 2 sm/hr/crew 1 Laborer
191.88 sm/mnday 2

Rough Finish 1
201.22 0 24.615385 24.615385 m2 1 Ro. Mason
201.22 12.307692 3.0769231 sm/hr/crew 1 Laborer
sm/mnday 2

Grooves Wall 1
255.52 0 10.666667 10.666667 lm 2 Mason
255.52 5.3333333 1.3333333 lm/hr/crew
sm/mnday 2

Plain cement Broom Finish 1


236.99 0 14.545455 14.545455 m2/day 2 Fin. Mason
236.99 2.9090909 1.8181818 sm/hr/crew 3 Helper
sm/mnday 5

Steel Float Finish, By Hand 1


14.035088 14.035088 m2/day 1 Fin. Mason
7.0175439 1.754386 sm/hr/crew 1 Laborer
sm/mnday 2

Power Float Finish 1


21 21 m2/day 1 Power Trowel
21 2.625 sm/hr/crew
sm/mnday 1
100% CONCRETE: Job Mixed
CONCRETING WORKS
Footing 1
9.41 0 11.940299 11.940299 m³ 1 LM Mason
56.48 0 1.0854817 1.4925373 m3/hr/crew 2 Ro Mason
112.97 m3/mnday 8 Helper
178.86 11

Tie Beam 1
9.41 0 11.940299 11.940299 m³ 1 LM Mason
56.48 0 1.0854817 1.4925373 m3/hr/crew 2 Ro Mason
112.97 m3/mnday 8 Helper
178.86 11

Column 1
17.21 0 5.7553957 5.7553957 m³ 1 LM Mason
103.24 0 0.4427227 0.7194245 m3/hr/crew 2 Ro Mason
206.49 m3/mnday 10 Helper
326.94 13

Parapet 1
15.19 0 7.079646 7.079646 m³ 1 LM Mason
91.14 0 0.5445882 0.8849558 m3/hr/crew 2 Ro Mason
182.28 m3/mnday 10 Helper
288.61 13

Beams and Girders 1


26.26 0 7.8431373 7.8431373 m³ 1 LM Mason
125.43 0 0.5228758 0.9803922 m3/hr/crew 2 Ro Mason
153.66 m3/mnday 12 Helper
305.35 15

Suspended Slab 1
13.69 0 8.2474227 8.2474227 m³ 1 LM Mason
82.16 0 0.5498282 1.0309278 m3/hr/crew 2 Ro Mason
164.33 m3/mnday 12 Helper
260.18 15

Stair; Suspended 1
20.05 0 6.0606061 6.0606061 m³ 1 LM Mason
120.29 0.4040404 0.7575758 m3/hr/crew 2 Ro Mason
240.58 0 m3/mnday 12 Helper
380.92 15

Stairs; Grade 1
9.88 0 13.559322 13.559322 m³ 1 LM Mason
59.31 1.0430248 1.6949153 m3/hr/crew 2 Ro Mason
118.62 0 m3/mnday 10 Helper
187.81 13

Wall 1
15.63 0 6.7226891 6.7226891 m³ 1 LM Mason
93.80 0.5171299 0.8403361 m3/hr/crew 2 Ro Mason
187.61 0 m3/mnday 10 Helper
297.04 13

Grade Slab 1
9.88 0 13.559322 13.559322 m³ 1 LM Mason
59.31 0.7136485 1.6949153 m3/hr/crew 6 Ro Mason
118.62 0 m3/mnday 12 Helper
187.81 19

Roadways/Pavement 1
9.88 0 13.559322 13.559322 m³ 1 LM Mason
59.31 1.0430248 1.6949153 m3/hr/crew 2 Ro Mason
118.62 0 m3/mnday 10 Helper
187.81 13

Lean Concrete 1
26.83 0 13.559322 13.559322 m³ 1 LM Mason
53.66 1.0430248 1.6949153 m3/hr/crew 2 Ro Mason
107.32 0 m3/mnday 10 Helper
187.81 13

17.21 0
103.24 0
206.49
326.94

36.33 0
72.65 0
217.96
326.94
33.00 0
66.01
198.03 0
297.04

1.02 0
-
- 0
1.02

0.68 0
2.73
2.73 0
4.09
10.22
122.65

1.46 0
2.92
5.84 0
10.22
Mnhr per
Work ItemQty / day Unit Crew
Unit
Qty # days
FINISHING WORKS
Marble/Granite Wall 1
0.727 63.88 46.46 0 1.6 1.6 m2/day 1 Fin. Mason
0.727 63.88 46.46 0 0.8 0.2 sm/hr/crew 1 Laborer
1.455 92.92 sm/mnday 2

Stone Work Cladding 1


1.840 63.88 117.54 0 5 5 m2/day 1 Fin. Mason
1.840 63.88 117.54 0 1.666667 0.625 sm/hr/crew 2 Laborer
3.680 235.08 sm/mnday 3

Carpeting 1
1.875 63.88 119.78 0 13.61702 13.61702 m2/day 2 Installer
1.875 63.88 119.78 0 3.404255 1.702128 sm/hr/crew 2 Helper
3.750 239.55 sm/mnday 4

Wall Paper 1
1.000 63.88 63.88 0 21.33333 21.33333 m2/day 2 Installer
1.000 63.88 63.88 0 5.333333 2.666667 sm/hr/crew 2 Helper
2.000 127.76 sm/mnday 4

Installation of Stair Nosing 1


0.500 63.88 31.94 0 16 16 lm/day 2 Fin. Mason
0.000 63.88 - 0 8 2 lm/hr/crew Laborer
0.500 31.94 sm/mnday 2

Wood Float Finish, By Hand 1


1.839 63.88 117.48 0 17.02128 17.02128 m2/day 1 Fin. Mason
1.839 63.88 117.48 0 8.510638 2.12766 sm/hr/crew 1 Laborer
3.678 63.88 234.96 sm/mnday 2

Pebble Washout 1
3.008 63.88 192.12 0 2.66 2.66 m2/day 1 Fin. Mason
0.000 63.88 - 0 2.66 0.3325 sm/hr/crew Helper
3.008 192.12 sm/mnday 1

0.750 63.88 47.91 0


0.750 63.88 47.91 0
1.500 95.82

1.000 63.88 63.88 109 6.8125


1.500 63.88 95.82 0.2270833
2.500 159.70

1.067 63.88 68.17 109 7.2703


1.601 63.88 102.26 0.2423433
2.668 170.43

1.000 63.88 63.88 109 6.8125


1.500 63.88 95.82 0.2270833
2.500 159.70

0.500 63.88 31.94 0


0.500 63.88 31.94 0
1.000 63.88

1.000 63.88 63.88 0


0
1.000 63.88

1.509 63.88 96.39 0


0
1.509 96.39

0.400 63.88 25.55 0


0
0.400 25.55

0.800 63.88 51.10 0


0
0.800 51.10

2.000 63.88 127.76 0


2.000 63.88 127.76 0
4.000 255.52

3.120 63.88 199.33 0


0
3.120 199.33

2.360 63.88 150.76 0


2.360 63.88 150.76 0
4.720 301.51

0.500 63.88 31.94 0


0.500 63.88 31.94 0
1.000 63.88

0.325 63.88 20.76 0


0.325 63.88 20.76 0
0.650 41.52

1.500 63.88 95.82 0


0
1.500 95.82

1.100 63.88 70.27 109 7.49375


1.650 63.88 105.40 0.2497917
2.750 175.67

0.570 63.88 36.41 0


0.570 63.88 36.41 0
1.140 72.82

0.381 287.70 109.60 0


- 0
0.381 109.60
use 1st
CONCRETING WORKS
Footing 1
0.670 63.88 42.80 25 2.09375 17 17 m³ 1 LM Mason
1.340 63.88 85.60 0.0697917 2.428571 2.125 m3/hr/crew 2 Ro Mason
5.360 63.88 342.40 m3/mnday 4 Helper
7.370 470.80 7

Tie Beam 1
0.670 63.88 42.80 0 17 17 m³ 1 LM Mason
1.340 63.88 85.60 0 2.428571 2.125 m3/hr/crew 2 Ro Mason
5.360 63.88 342.40 m3/mnday 4 Helper
7.370 470.80 7

Column 1
1.390 63.88 88.79 0 19.5 19.5 m³ 1 LM Mason
2.780 63.88 177.59 0 2.166667 2.4375 m3/hr/crew 2 Ro Mason
13.900 63.88 887.93 m3/mnday 6 Helper
18.070 1,154.31 9

Parapet 1
1.130 63.88 72.18 0 20.5 20.5 m³ 1 LM Mason
2.260 63.88 144.37 0 2.277778 2.5625 m3/hr/crew 2 Ro Mason
11.300 63.88 721.84 m3/mnday 6 Helper
14.690 938.40 9

Beams and Girders 1


1.020 63.88 65.16 0 13.5 13.5 m³ 1 LM Mason
2.040 63.88 130.32 0 1.928571 1.817308 m3/hr/crew 2 Ro Mason
12.240 63.88 781.89 m3/mnday 4 Helper
15.300 977.36 7

Suspended Slab 1
0.970 63.88 61.96 0 13.5 13.5 m³ 1 LM Mason
1.940 63.88 123.93 0 1.928571 1.817308 m3/hr/crew 2 Ro Mason
11.640 63.88 743.56 m3/mnday 4 Helper
14.550 929.45 7

Stair; Suspended 1
1.320 63.88 84.32 0 12.5 12.5 m³ 1 LM Mason
2.640 63.88 168.64 1.785714 1.682692 m3/hr/crew 2 Ro Mason
15.840 63.88 1,011.86 0 m3/mnday 4 Helper
19.800 1,264.82 7

Stairs; Grade 1
0.590 63.88 37.69 0 18 18 m³ 1 LM Mason
1.180 63.88 75.38 2.571429 2.25 m3/hr/crew 2 Ro Mason
5.900 63.88 376.89 0 m3/mnday 4 Helper
7.670 489.96 7

Wall 1
1.190 63.88 76.02 0 19.5 19.5 m³ 1 LM Mason
2.380 63.88 152.03 2.166667 2.4375 m3/hr/crew 2 Ro Mason
11.900 63.88 760.17 0 m3/mnday 6 Helper
15.470 988.22 9

Grade Slab 1
0.590 63.88 37.69 0 17 17 m³ 1 LM Mason
3.540 63.88 226.14 2.428571 2.125 m3/hr/crew 2 Ro Mason
7.080 63.88 452.27 0 m3/mnday 4 Helper
11.210 716.09 7

Roadways/Pavement 1
0.590 63.88 37.69 0 17 17 m³ 1 LM Mason
1.180 63.88 75.38 2.428571 2.125 m3/hr/crew 2 Ro Mason
5.900 63.88 376.89 0 m3/mnday 4 Helper
7.670 489.96 7

Lean Concrete 1
0.590 63.88 37.69 0 17 17 m³ 1 LM Mason
1.180 63.88 75.38 2.428571 2.125 m3/hr/crew 2 Ro Mason
5.900 63.88 376.89 0 m3/mnday 4 Helper
7.670 489.96 7
Mnhr
Work Item Qty / day Unit Crew
per Unit
Qty # days
FINISHING HARDWARES
Hinges 1
5.000 63.88 319.40 0 8 8 nr 1 Fin. Carp
5.000 63.88 319.40 0 8 1 nr/hr/crew
10.000 638.80 nr/mnday 1

Hinges; Floor Check 1


1.600 63.88 102.21 0 1.3333333 1.3333333 nr 2 Fin. Carp
3.200 63.88 204.42 0 0.6666667 0.1666667 nr/hr/crew
4.800 306.62 nr/mnday 2

Hinges; Double Action Floor 1


1.175 63.88 75.06 0 1 1 set 2 Fin. Carp
1.175 63.88 75.06 0 0.5 0.125 nr/hr/crew
2.350 150.12 nr/mnday 2

Hinges; Invisible 1
0.750 63.88 47.91 0 2 2 nr 1 Fin. Carp
0.750 63.88 47.91 0 2 0.25 nr/hr/crew
1.500 95.82 nr/mnday 1

Locksets 1
1.000 63.88 63.88 0 2 2 nr 1 Fin. Carp
0.000 63.88 - 0 2 0.25 nr/hr/crew
1.000 63.88 nr/mnday 1

Sliding Door Latch 1


0.470 63.88 30.02 0 2.6666667 2.6666667 nr 1 Fin. Carp
0.470 63.88 30.02 0 2.6666667 0.3333333 nr/hr/crew
0.940 60.05 nr/mnday 1

Door Closer 1
3.008 63.88 192.12 0 1.5 1.5 nr 1 Fin. Carp
0.000 63.88 - 0 1.5 0.1875 nr/hr/crew
3.008 192.12 nr/mnday 1

Flush Bolt 1
4 4 nr 1 Fin. Carp
4 0.5 nr/hr/crew
nr/mnday 1

Door Stop 1
6.6666667 6.6666667 nr 1 Fin. Carp
6.6666667 0.8333333 nr/hr/crew
nr/mnday 1

Weather Strip Ext. alum 1


3.7523452 3.7523452 lm 1 Fin. Carp
3.7523452 0.4690432 nr/hr/crew
nr/mnday 1

Weather Seal; Door Bottom 1


3.7523452 3.7523452 lm 1 Fin. Carp
3.7523452 0.4690432 nr/hr/crew
nr/mnday 1

Panic Exit Device 1


1.6666667 1.6666667 set 2 Fin. Carp
0.8333333 0.2083333 nr/hr/crew
nr/mnday 2

Pull Handle 1
2.2857143 2.2857143 set 1 Fin. Carp
2.2857143 0.2857143 nr/hr/crew
nr/mnday 1

Push Plate 1
2.2857143 2.2857143 set 1 Fin. Carp
2.2857143 0.2857143 nr/hr/crew
nr/mnday 1

Door Stop 1
5.3333333 5.3333333 set 1 Fin. Carp
5.3333333 0.6666667 nr/hr/crew
nr/mnday 1

Flush Bolt 1
2 2 set 1 Fin. Carp
2 0.25 nr/hr/crew
nr/mnday 1
CONCRETE EQUIPMENTS
CONCRETING WORKS
Concrete Mixer 1
0.471 64.57 30.39 0 16 16 m³ 1 1-Bagger
0.941 64.57 60.77 0
1.882 63.88 120.24
3.294 211.40 Concrete Vibrator 1
50 50 m³ 1 Conc. Vib

0.471 64.57 30.39 0


0.941 64.57 60.77 0 Concrete Pump 1
1.882 63.88 120.24 50 50 m³ 1 Concrete P
3.294 211.40

CONVENTIONAL FORMS
0.410 64.57 26.49 0 Column Area x
0.821 64.57 52.98 0 Pedestal Area x
2.462 63.88 157.24 Beam Area x
3.692 236.71 Conc. Wall Area x
Slab Area x
Curb & Gutter Area x
0.390 64.57 25.20 0 Conc Slab Area x
0.780 64.57 50.40 0 Sill & Lintel Area x
2.341 63.88 149.57 Scaffolding using 2 x 8 Area x
3.512 225.17 Scaffolding using 2 x 4 Area x
Nails Bdft /

0.296 64.57 19.13 0


1.185 64.57 76.53 0
2.370 63.88 151.42
3.852 247.08

0.296 64.57 19.13 0


1.185 64.57 76.53 0
2.370 63.88 151.42
3.852 247.08

0.320 64.57 20.66 0


1.280 64.57 82.65
2.560 63.88 163.53 0
4.160 266.84

0.444 64.57 28.70 0


0.889 64.57 57.40
1.778 63.88 113.56 0
3.111 199.66

0.410 64.57 26.49 0


0.821 64.57 52.98
2.462 63.88 157.24 0
3.692 236.71

0.471 64.57 30.39 0


0.941 64.57 60.77
1.882 63.88 120.24 0
3.294 211.40

0.471 64.57 30.39 0


0.941 64.57 60.77
1.882 63.88 120.24 0
3.294 211.40

0.471 64.57 30.39 0


0.941 64.57 60.77
1.882 63.88 120.24 0
3.294 211.40
Mnhr per
Work ItemQty / day Unit Crew
Unit
Qty # days
FINISHING HARDWARES
Door Silencer 1
1.000 63.88 63.88 0 6.4 6.4 nr 1
0 6.4 0.8 nr/hr/crew
1.000 63.88 nr/mnday 1

Threshold 1
12.000 63.88 766.56 0 0.8 0.8 nr 1
0 0.8 0.1 nr/hr/crew
12.000 766.56 nr/mnday 1

Door Bottom Seal 1


16.000 63.88 1,022.08 0 2 2 nr 1
0 2 0.25 nr/hr/crew
16.000 1,022.08 nr/mnday 1

Weather Strip 1
4.000 63.88 255.52 0 2 2 nr 1
0 2 0.25 nr/hr/crew
4.000 255.52 nr/mnday 1

Magnetic Latch 1
4.000 63.88 255.52 0 2.285714 2.285714 nr 1
0 2.285714 0.285714 nr/hr/crew
4.000 255.52 nr/mnday 1

Deadbolts 1
3.000 63.88 191.64 0 1.6 1.6 nr 1
0 1.6 0.2 nr/hr/crew
3.000 191.64 nr/mnday 1

5.333 63.88 340.69 0


0
5.333 340.69

2.000 63.88 127.76 0


0
2.000 127.76

1.200 63.88 76.66 0


0
1.200 76.66

2.132 63.88 136.19 0


0
2.132 136.19

2.132 63.88 136.19 0


0
2.132 136.19

9.600 63.88 613.25 0


0
9.600 613.25

3.500 63.88 223.58 0


0
3.500 223.58

3.500 63.88 223.58 0


0
3.500 223.58

1.500 63.88 95.82 0


0
1.500 95.82

4.000 63.88 255.52 0


0
4.000 255.52
0.500 172.00 86.00 0
0.500 86.00

0.160 101.06 16.17 0


0.160 16.17

0.160 0 - 0
0.160 -

33 bdft/m2
19 bdft/m2
34 bdft/m2
19 bdft/m2
25 bdft/m2
8.5 bdft/m2
36 bdft/m2
18 bdft/m2
6.56 bdft/m2
8.75 bdft/m2
55 bdft/kg
Mnhr
Crew Work ItemQty / day Unit Crew
per Unit
Qty # days
DRAINAGE WORKS
RCP 1200mmØ 1
Fin. Carp 1.250 63.88 79.85 0 6 6m 1
0 0.75 0.75 lm/hr/crew 7
1.250 79.85 lm/mnday 8

RCP 900mmØ 1
Fin. Carp 10.000 63.88 638.80 0 6.72 6.72 m 1
0 0.84 0.84 lm/hr/crew 7
10.000 638.80 lm/mnday 8

RCP 750mmØ 1
Fin. Carp 4.000 63.88 255.52 0 8.61 8.61 m 1
0 1.07625 1.07625 lm/hr/crew 7
4.000 255.52 lm/mnday 8

RCP 600mmØ 1
Fin. Carp 4.000 63.88 255.52 0 10.76 10.76 m 1
0 1.345 1.345 lm/hr/crew 7
4.000 255.52 lm/mnday 8

RCP 450mmØ 1
Fin. Carp 3.500 63.88 223.58 0 16.12 16.12 m 1
0 2.015 2.015 lm/hr/crew 7
3.500 223.58 lm/mnday 8

RCP 375mmØ 1
Fin. Carp 5.000 63.88 319.40 0 21.5 21.5 m 1
0 2.6875 2.6875 lm/hr/crew 7
5.000 319.40 lm/mnday 8

RCP 300mmØ 1
26 26 m 1
3.25 3.25 lm/hr/crew 7
lm/mnday 8

RCP 150mmØ 1
28.44444 28.44444 m 1
3.555556 3.555556 lm/hr/crew 7
lm/mnday 8

PVC ½" - ¾" Ø 1


105.2632 105.2632 m 1
21.05263 13.15789 lm/hr/crew 4
lm/mnday 5

PVC 1" - 1¼" Ø 1


27.02703 27.02703 m 1
5.405405 3.378378 lm/hr/crew 4
lm/mnday 5

PVC 1½" - 2" Ø 1


24.39024 24.39024 m 1
4.878049 3.04878 lm/hr/crew 4
lm/mnday 5

PVC 2½" Ø 1
20.40816 20.40816 m 1
4.081633 2.55102 lm/hr/crew 4
lm/mnday 5

PVC 3" Ø 1
18.51852 18.51852 m 1
3.703704 2.314815 lm/hr/crew 4
lm/mnday 5

PVC 4" Ø 1
15.26718 15.26718 m 1
3.053435 1.908397 lm/hr/crew 4
lm/mnday 5

PVC 5" Ø 1
12.19512 12.19512 m 1
2.439024 1.52439 lm/hr/crew 4
lm/mnday 5

PVC 6" Ø 1
8.130081 8.130081 m 1
1.626016 1.01626 lm/hr/crew 4
lm/mnday 5

PVC 8" Ø 1
7.692308 7.692308 m 1
1.538462 0.961538 lm/hr/crew 4
lm/mnday 5

PVC 10" Ø 1
7.079646 7.079646 m 1
1.415929 0.884956 lm/hr/crew 4
lm/mnday 5

PVC 12" Ø 1
6.666667 6.666667 m 1
1.333333 0.833333 lm/hr/crew 4
lm/mnday 5
Mnhr
Crew Work ItemQty / day Unit Crew
per Unit
Qty # days
DRAINAGE WORKS
Cast Iron Pipe 2"Ø 1
L/M Mason 1.333 63.88 85.17 0 18.26484 18.26484 lm/day 1
Helper 9.333 63.88 596.21 0 3.652968 2.283105 lm/hr/crew 4
10.667 681.39 lm/mnday 5

Cast Iron Pipe 4"Ø 1


L/M Mason 1.190 63.88 76.05 0 12.15805 12.15805 lm/day 1
Helper 8.333 63.88 532.33 0 2.431611 1.519757 lm/hr/crew 4
9.524 608.38 lm/mnday 5

Cast Iron Pipe 6"Ø 1


L/M Mason 0.929 63.88 59.35 0 8.130081 8.130081 lm/day 1
Helper 6.504 63.88 415.48 0 1.626016 1.01626 lm/hr/crew 4
7.433 474.83 lm/mnday 5

Cast Iron Pipe 8"Ø 1


L/M Mason 0.743 63.88 47.49 0 6.08828 6.08828 lm/day 1
Helper 5.204 63.88 332.46 0 1.217656 0.761035 lm/hr/crew 4
5.948 379.96 lm/mnday 5

Cast Iron Pipe 10"Ø 1


L/M Mason 0.496 63.88 31.70 0 4.060914 4.060914 lm/day 1
Helper 3.474 63.88 221.92 0 0.812183 0.507614 lm/hr/crew 4
3.970 253.62 lm/mnday 5

Cast Iron Pipe 12"Ø 1


L/M Mason 0.372 63.88 23.77 0 3.879728 3.879728 lm/day 1
Helper 2.605 63.88 166.39 0 0.775946 0.484966 lm/hr/crew 4
2.977 190.15 lm/mnday 5

Cast Iron Pipe 14"Ø 1


L/M Mason 0.308 63.88 19.66 0 3.319502 3.319502 lm/day 1
Helper 2.154 63.88 137.59 0 0.6639 0.414938 lm/hr/crew 4
2.462 157.24 lm/mnday 5

Cast Iron Pipe 16"Ø 1


L/M Mason 0.281 63.88 17.97 0 2.921841 2.921841 lm/day 1
Helper 1.969 63.88 125.76 0 0.584368 0.36523 lm/hr/crew 4
2.250 143.73 lm/mnday 5

Cast Iron Pipe 18"Ø 1


L/M Mason 0.076 63.88 4.85 0 2.607562 2.607562 lm/day 1
Helper 0.304 63.88 19.42 0 0.521512 0.325945 lm/hr/crew 4
0.380 24.27 lm/mnday 5

Cast Iron Pipe 20"Ø 1


L/M Mason 0.296 63.88 18.91 0 2.434571 2.434571 lm/day 1
Helper 1.184 63.88 75.63 0 0.486914 0.304321 lm/hr/crew 4
1.480 94.54 lm/mnday 5

Cast Iron Pipe 24"Ø 1


L/M Mason 0.328 63.88 20.95 0 2.213614 2.213614 lm/day 1
Helper 1.312 63.88 83.81 0 0.442723 0.276702 lm/hr/crew 4
1.640 104.76 lm/mnday 5

Cast Iron Pipe 30"Ø 1


L/M Mason 0.392 63.88 25.04 0 1.94742 1.94742 lm/day 1
Helper 1.568 63.88 100.16 0 0.389484 0.243427 lm/hr/crew 4
1.960 125.20 lm/mnday 5

Asbestos Cement Pipe1/2"Ø 1


L/M Mason 0.432 63.88 27.60 0 30.30303 30.30303 lm/day 1
Helper 1.728 63.88 110.38 0 6.060606 3.787879 lm/hr/crew 4
2.160 137.98 lm/mnday 5

Asbestos Cement Pipe 3/4"Ø 1


L/M Mason 0.524 63.88 33.47 0 30.30303 30.30303 lm/day 1
Helper 2.096 63.88 133.89 0 6.060606 3.787879 lm/hr/crew 4
2.620 167.37 lm/mnday 5

Asbestos Cement Pipe 1-1/4"Ø 1


L/M Mason 0.656 63.88 41.91 0 27.02703 27.02703 lm/day 1
Helper 2.624 63.88 167.62 0 5.405405 3.378378 lm/hr/crew 4
3.280 209.53 lm/mnday 5

Asbestos Cement Pipe 1-1/2" - 1


L/M Mason 0.984 63.88 62.86 0 24.39024 24.39024 lm/day 1
Helper 3.936 63.88 251.43 0 4.878049 3.04878 lm/hr/crew 4
4.920 314.29 lm/mnday 5

Asbestos Cement Pipe 2-1/2"Ø 1


L/M Mason 1.040 63.88 66.44 0 20.30457 20.30457 lm/day 1
Helper 4.160 63.88 265.74 0 4.060914 2.538071 lm/hr/crew 4
5.200 332.18 lm/mnday 5

Asbestos Cement Pipe 3"Ø 1


L/M Mason 1.130 63.88 72.18 0 18.51852 18.51852 lm/day 1
Helper 4.520 63.88 288.74 0 3.703704 2.314815 lm/hr/crew 4
5.650 360.92 lm/mnday 5

Asbestos Cement Pipe 3-1/2"Ø 1


L/M Mason 1.200 63.88 76.66 0 17.3913 17.3913 lm/day 1
Helper 4.800 63.88 306.62 0 3.478261 2.173913 lm/hr/crew 4
6.000 383.28 lm/mnday 5

Asbestos Cement Pipe 4"Ø 1


15.15152 15.15152 lm/day 1
3.030303 1.893939 lm/hr/crew 4
lm/mnday 5
Mnhr
Crew Work ItemQty / day Unit
per Unit
Qty # days
CIVIL WORKS
Demolition Manual
L/M Maso 0.438 63.88 27.98 0 2.48 2.48 m3/day
Helper 1.752 63.88 111.92 0 0.496 0.31 m3/hr/crew
2.190 139.90 m3/mnday

Demolition Equipment w/ Hauling


L/M Maso 0.658 63.88 42.03 0 0.436205 0.436205 hr/m3
Helper 2.632 63.88 168.13 0
3.290 210.17

L/M Maso 0.984 63.88 62.86 0


Helper 3.936 63.88 251.43 0 Demolition/Removal Curb & Gutter
4.920 314.29 9.756098 9.756098 lm/day
2.439024 1.219512 lm/hr/crew
lm/mnday
L/M Maso 1.314 63.88 83.94 0
Helper 5.256 63.88 335.75 0 Application of Conc. Epoxy
6.570 419.69 8 8 sm/day
4 1 sm/hr/crew
sm/mnday
L/M Maso 1.970 63.88 125.84 0
Helper 7.880 63.88 503.37 0 Water Stop Installation
9.850 629.22 12 12 lm/day
12 1.5 lm/hr/crew
lm/mnday
L/M Maso 2.062 63.88 131.72 0
Helper 8.248 63.88 526.88 0 Caulking both side w/ styro & backer
10.310 658.60 12.30769 12.30769 lm/day
12.30769 1.538462 lm/hr/crew
lm/mnday
L/M Maso 2.410 63.88 153.95 0
Helper 9.640 63.88 615.80 0 Caulking
12.050 769.75 40 40 lm/day
20 5 lm/hr/crew
lm/mnday
L/M Maso 2.738 63.88 174.90 0
Helper 10.952 63.88 699.61 0 Inst'n Crusiform Panel
13.690 874.52 30.07519 30.07519 m2/day
6.015038 3.759398 m2/hr/crew
m2/mnday
L/M Maso 3.068 63.88 195.98 0
Helper 12.272 63.88 783.94 0 Inst'n Geotextile
15.340 979.92 21.33333 21.33333 m2/day
5.333333 2.666667 m2/hr/crew
m2/mnday
L/M Maso 3.286 63.88 209.91 0
Helper 13.144 63.88 839.64 0 Grouted Rip-rap (per/vol)
16.430 1,049.55 13.33333 13.33333 m3/day
1.025641 1.666667 cum/hr/crew
cu/mnday
L/M Maso 3.614 63.88 230.86 0
Helper 14.456 63.88 923.45 0
18.070 1,154.31

Gabion Type Rip-rap (per/vol)


L/M Maso 4.108 63.88 262.42 0 13.33333 13.33333 m3/day
Helper 16.432 63.88 1,049.68 0 1.025641 1.666667 cum/hr/crew
20.540 1,312.10 cu/mnday

L/M Maso 0.264 63.88 16.86 0


Helper 1.056 63.88 67.46 0 Scraping of Asphalt Pavement
1.320 84.32 533.3333 533.3333 m2/day
533.3333 66.66667 m2/hr/crew
m2/mnday
L/M Maso 0.264 63.88 16.86 0
Helper 1.056 63.88 67.46 0 PE Sheet Installation
1.320 84.32 94.11765 94.11765 sm
47.05882 11.76471 sm/hr/crew
sm/mnday
L/M Maso 0.296 63.88 18.91 0
Helper 1.184 63.88 75.63 0 Installation of Joint Filler
1.480 94.54 40 40 lm
20 5 lm/hr/crew
lm/mnday
L/M Maso 0.328 63.88 20.95 0
Helper 1.312 63.88 83.81 0 Installation/Setting of Anchor Bolt
1.640 104.76 32.65306 32.65306 kg/day
16.32653 4.081633 kg/hr/crew
kg/mnday
L/M Maso 0.394 63.88 25.17 0
Helper 1.576 63.88 100.67 0 Installationof Embedded Items
1.970 125.84 64 64 kg/day
32 8 kg/hr/crew
kg/mnday
L/M Maso 0.432 63.88 27.60 0
Helper 1.728 63.88 110.38 0
2.160 137.98

L/M Maso 0.460 63.88 29.38 0


Helper 1.840 63.88 117.54 0
2.300 146.92

L/M Maso 0.528 63.88 33.73 0


Helper 2.112 63.88 134.91 0
2.640 168.64
Mnhr
Crew Work Item
per Unit
Qty # days
EARTHWORKS
1 Excavation-Manual
5 Labor 16.129 63.88 1,030.32 0 16.326531
Tools (10% of Labor) 103.03 0 2.3323615
5 16.129 1,133.35 m3/mnday

1
1 Backhoe w/ breaker 0.436 2,232.14 973.67 0 Compaction-Plate
1 Wheel Loader 0.436 1,255.00 547.44 0 119.40299
2 Dump Truck 0.436 544.80 475.29 119.40299
2 Labor 0.436 63.88 55.73 m3/mnday
2,052.13
Spreading-Equipment
1 400
4 Laborer 3.280 63.88 209.53 0 400
4 3.280 209.53 0 m3/mnday

1 Excavation-Eqpt
2 Ro. Mas 2.000 63.88 127.76 0 100
2 2.000 127.76 0 100
m3/eqptday

1 Excavation-Eqpt
1 Ro. Mas 0.667 63.88 42.59 0 200
1 0.667 42.59 0 200
m3/eqptday

1 Backfilling-Manual
1 Ro. Mas 0.650 63.88 41.52 0 29.131653
1 0.650 41.52 0 2.2408964
Tools 10% 4.15 m3/mnday

1 Backfilling-Eqpt
2 Skilled Worker 0.400 63.88 25.55 0 181.81818
2 0.400 25.55 0 181.81818
Tools 10% 2.56 m3/mnday

1
1 L/M Mason 0.266 63.88 16.99 0 Gravelfill-Manual
4 Helper 1.064 63.88 67.97 0 20.8
5 1.330 84.96 1.6
m3/mnday
1
1 L/M Mason 0.375 63.88 23.96 0 Hauling
3 Helper 1.125 63.88 71.87 0 36
4 1.500 95.82 1.8947368
m3/mnday
m3/mnday
1
1 L/M 0.600 53.46 32.08 0 Manual Trimming-0.30m
4 Mason 2.400 47.75 114.60 101.069
2 Carpenter 1.200 47.75 57.30 7.7745384
6 Helper 3.600 38.34 138.02 0 sm/mnday
13 7.800 342.00

Hauling
1 32
1 L/M 0.600 53.46 32.08 0 8
4 Mason 2.400 47.75 114.60 m3/mnday
8 Helper 4.800 38.34 184.03 0
13 7.800 330.71 Clearing & Grubbing-Manual
260
1 20
1 Dozer 0.015 63.88 0.96 0 m2/mnday
0
1 0.015 0.96 Clearing & Grubbing-Equipm
1000
1 1000
2 Laborer 0.170 63.88 10.86 m2/eqptday
2 0.170 10.86
Clearing & Grubbing-Equipm
666.66667
1 666.66667
2 Laborer 0.400 63.88 25.55 m2/eqptday
2 0.400 25.55
Compaction-Vib Roller 10t @ 6
650.72
1 650.72
2 Installer 0.490 63.88 31.30 m3/eqptday
2 0.490 31.30
Vib Roller 10t, 300mm lift
976
1 976
2 Installer 0.250 63.88 15.97 m3/eqptday
2 0.250 15.97
Production Rate: Vibratory Com
Drum width
Speed
Work/hr
Lift

2.135
488.061
@ 6 Passes

=
=

Vib Roller 10t, 250mm lift


813.435
813.435
m3/eqptday

Production Rate: Vibratory Com


Drum width
Speed
Work/hr
Lift

2.135
406.7175
@ 6 Passes

=
=

Vib Roller 10t, 200mm lift


650.748
650.748
m3/eqptday

Production Rate: Vibratory Com


Drum width
Speed
Work/hr
Lift

2.135
325.374
@ 6 Passes

=
=

Vib Roller 10t, 150mm lift


488.061
488.061
m3/eqptday

Production Rate: Vibratory Com


Drum width
Speed
Work/hr
Lift

2.135
244.0305
@ 6 Passes

=
=

Plate Comp., 300mm lift


120
120
m3/eqptday

Production Rate: Plate Compacto


Drum/Plate width
Speed
Work/hr
Lift

0.4
60
@ 6 Passes

=
=

Plate Comp., 250mm lift


100
100
m3/eqptday

Production Rate: Plate Compacto


Drum/Plate width
Speed
Work/hr
Lift

0.4
50
@ 6 Passes

=
=

Plate Comp., 200mm lift


80
80
m3/eqptday

Production Rate: Vibratory Com


Drum/Plate width
Speed
Work/hr
Lift

0.4
40
@ 6 Passes

=
=

Plate Comp., 150mm lift


60
60
m3/eqptday

Production Rate: Vibratory Com


Drum/Plate width
Speed
Work/hr
Lift

0.4
30
@ 6 Passes

=
=

Grouted Rip-rap (per/vol)


13.333333
1.025641
cu/mnday

Gabion Type Rip-rap (per/vol)


13.333333
1.025641
cu/mnday

Scraping of Asphalt Pavement


533.33333
533.33333
m2/mnday
Mnhr per
Qty / day Unit Crew
Unit
Qty
EARTHWORKS
Excavation-Manual 1
16.3265306 m3/day 1 L/M 0.490 63.88 31.30
2.04081633 m3/hr/crew 6 Helper 2.940 63.88 187.81
7 3.430 219.11
Tools 10% 21.91

Compaction-Plate 1
119.402985 m3/day 1 Plate Comp 0.067 74.40 4.98
14.9253731 m3/hr/crew 2 Labor 0.067 63.88 8.56
1 0.067 13.54

Spreading-Equipment 1
400 m3 1 Motor Grader 0.020 648.80 12.98
50 m3/hr/crew
0.02 1 0.020 12.98

Excavation-Eqpt 1
100 m3/day 1 Backhoe 0.080 1,783.04 142.64
12.500 m3/hr/crew -
m3/eqptday 1 0.080 142.64

Excavation-Eqpt 1
200 m3/day 1 Dozer 0.040 1,783.04 71.32
25.000 m3/hr/crew -
m3/eqptday 1 0.040 71.32

Backfilling-Manual 1
29.1316527 m3/day 1 LM 0.275 63.88 17.54
3.64145658 m3/hr/crew 12 Labor 3.295 63.88 210.51
13 3.570 228.05

Backfilling-Eqpt 1
181.818182 m3/day 1 Loader 0.044 1,255.00 55.22
22.7272727 m3/hr/crew 2 Labor 0.044 63.88 5.62
Tools (10% of Labor) 0.56
1 0.044 61.40

Gravelfill-Manual 1
20.8 m3/day 1 LM 0.385 63.88 24.57
2.6 m3/hr/crew 12 Labor 4.615 63.88 294.83
13 5.000 319.40
3
36 m3/day 1 F/M 0.222 63.88 14.20
4.5 m3/hr/crew 18 Labor 4.000 63.88 255.52
Tools (10% of Labor) 26.97
19 4.222 94.16

Manual Trimming-0.30m 1
101.068999 sm/day 1 LM Labor 0.079 63.88 5.06
12.6336249 sm/hr/crew 12 Labor 0.950 63.88 60.68
13 1.029 65.73
Tools 10% 6.57

1
32 m3/day 4 Labor 1.000 63.88 63.88
4 m3/hr/crew 4 1.000 63.88

Clearing & Grubbing-Manual 1


260 m2/day 1 L/M 0.031 63.88 1.97
32.5 m2/hr/crew 12 Helper 0.369 63.88 23.59
13 0.400 25.55

Clearing & Grubbing-Equipment 1


1000 m2/day 1 Dozer 0.008 63.88 0.51
125 m2/hr/crew Helper 0.000 63.88 -
m2/eqptday 1 0.008 0.51

Clearing & Grubbing-Equipment 1


666.666667 m2/day 1 Dozer 0.012 63.88 0.77
83.3333333 m2/hr/crew Helper 0.000 63.88 -
m2/eqptday 1 0.012 0.77

Compaction-Vib Roller 10t @ 6 passes, 1


650.72 m3/day 1 Vib. Roller 0.012 63.88 0.79
81.34 m3/hr/crew Helper 0.000 63.88 -
m3/eqptday 1 0.012 0.79

Vib Roller 10t, 300mm lift 1


976 m3/day 1 Vib. Roller 0.008 63.88 0.52
122 m3/hr/crew Helper 0.000 63.88 -
m3/eqptday 1 0.008 0.52

Production Rate: Vibratory Compactor


Drum width 2.135 m
15.24 m/min
50 min/hr
300 mm

m x 15.24 m/min x 50 min/hr x


cu.m./hr
@ 6 Passes @ 4 Passes
488.061 cu.m./hr 488.061 cu.m./hr
6 passes 4 passes

81.3435 m3/hr 122.01525 m3/hr


650.748 m3/day 976.122 m3/day

Vib Roller 10t, 250mm lift 1


813.435 m3/day 1 Vib. Roller 0.010 63.88 0.63
101.679375 m3/hr/crew Helper 0.000 63.88 -
m3/eqptday 1 0.010 0.63

Production Rate: Vibratory Compactor Gravel Blanket


Drum width 2.135 m
15.24 m/min
50 min/hr
250 mm

m x 15.24 m/min x 50 min/hr x


cu.m./hr
@ 6 Passes @ 4 Passes
406.7175 cu.m./hr 406.7175 cu.m./hr
6 passes 4 passes

67.78625 m3/hr 101.67938 m3/hr


542.29 m3/day 813.435 m3/day

Vib Roller 10t, 200mm lift 1


650.748 m3/day 1 Vib. Roller 0.012 63.88 0.79
81.3435 m3/hr/crew Helper 0.000 63.88 -
m3/eqptday 1 0.012 0.79

Production Rate: Vibratory Compactor Gravel Blanket


Drum width 2.135 m
15.24 m/min
50 min/hr
200 mm

m x 15.24 m/min x 50 min/hr x


cu.m./hr
@ 6 Passes @ 4 Passes
325.374 cu.m./hr 325.374 cu.m./hr
6 passes 4 passes

54.229 m3/hr 81.3435 m3/hr


433.832 m3/day 650.748 m3/day

Vib Roller 10t, 150mm lift 1


488.061 m3/day 1 Vib. Roller 0.016 63.88 1.05
61.007625 m3/hr/crew Helper 0.000 63.88 -
m3/eqptday 1 0.016 1.05

Production Rate: Vibratory Compactor Gravel Blanket


Drum width 2.135 m
15.24 m/min 0.9144 kph
50 min/hr
150 mm

m x 15.24 m/min x 50 min/hr x


cu.m./hr
@ 6 Passes @ 4 Passes
244.0305 cu.m./hr 244.0305 cu.m./hr
6 passes 4 passes

40.67175 m3/hr 61.007625 m3/hr


325.374 m3/day 488.061 m3/day

Plate Comp., 300mm lift 1


120 m3/day 1 Plate Comp. 0.067 63.88 4.26
15 m3/hr/crew Helper 0.000 63.88 -
m3/eqptday 1 0.067 4.26

Production Rate: Plate Compactor


Drum/Plate width 0.4 m
10 m/min 0.6 kph
50 min/hr
300 mm

m x 10 m/min x 50 min/hr x
cu.m./hr
@ 6 Passes @ 4 Passes
60 cu.m./hr 60 cu.m./hr
6 passes 4 passes

10 m3/hr 15 m3/hr
80 m3/day 120 m3/day

Plate Comp., 250mm lift 1


100 m3/day 1 Plate Comp. 0.080 63.88 5.11
12.5 m3/hr/crew Helper 0.000 63.88 -
m3/eqptday 1 0.080 5.11

Production Rate: Plate Compactor


Drum/Plate width 0.4 m
10 m/min 0.6 kph
50 min/hr
250 mm

m x 10 m/min x 50 min/hr x
cu.m./hr
@ 6 Passes @ 4 Passes
50 cu.m./hr 50 cu.m./hr
6 passes 4 passes

8.33333333 m3/hr 12.5 m3/hr


66.6666667 m3/day 100 m3/day

Plate Comp., 200mm lift 1


80 m3/day 1 Plate Comp. 0.100 63.88 6.39
10 m3/hr/crew Helper 0.000 63.88 -
m3/eqptday 1 0.100 6.39

Production Rate: Vibratory Compactor Gravel Blanket


Drum/Plate width 0.4 m
10 m/min 0.6 kph
50 min/hr
200 mm

m x 10 m/min x 50 min/hr x
cu.m./hr
@ 6 Passes @ 4 Passes
40 cu.m./hr 40 cu.m./hr
6 passes 4 passes

6.66666667 m3/hr 10 m3/hr


53.3333333 m3/day 80 m3/day

Plate Comp., 150mm lift 1


60 m3/day 1 Plate Comp. 0.133 63.88 8.52
7.5 m3/hr/crew Helper 0.000 63.88 -
m3/eqptday 1 0.133 8.52

Production Rate: Vibratory Compactor Gravel Blanket


Drum/Plate width 0.4 m
10 m/min 0.6 kph
50 min/hr
150 mm

m x 10 m/min x 50 min/hr x
cu.m./hr
@ 6 Passes @ 4 Passes
30 cu.m./hr 30 cu.m./hr
6 passes 4 passes

5 m3/hr 33.333333 7.5 m3/hr


40 m3/day 266.66667 60 m3/day

Grouted Rip-rap (per/vol)


13.3333333 m3/day 1
1.66666667 cum/hr/crew 1 L/M 0.600 53.46 32.08
4 Mason 2.400 47.75 114.60
2 Carpenter 1.200 47.75 57.30
6 Helper 3.600 38.34 138.02
13 7.800 342.00

Gabion Type Rip-rap (per/vol)


13.3333333 m3/day 1
1.66666667 cum/hr/crew 1 L/M 0.600 53.46 32.08
4 Mason 2.400 47.75 114.60
8 Helper 4.800 38.34 184.03
13 7.800 330.71

Scraping of Asphalt Pavement 1


533.333333 m2/day 1 Dozer 0.015 63.88 0.96
66.6666667 m2/hr/crew
1 0.015 0.96
Mnhr
Work ItemQty / day Unit Crew
per Unit
# days
EARTHWORKS
Spreading of Materials 1
0 160 160 m3/day 1 Motor Grader 0.050 63.88
0 160 20 m3/hr/crew Helper 0.000
m3/mnday 1 0.050
Tools 10%

Cutting off tops of piles 1


0 2.48 2.48 m3/day 1 LM 3.226 63.88
0 0.413333 0.31 m3/hr/crew 5 Helper 16.129 63.88
m3/mnday 6 19.355
Tools 10%

0 Application of Soil Poison 1


0 16 16 m2/day 3 Skilled Worker 1.500 63.88
5.333333 2 m2/hr/crew 0.000 63.88
m2/mnday 3 1.500

0
0

0
0

0
0

0
0

0
0
0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0
0.30m

0
0

0.25m

0
0
0.20m

0
0

0.15m

0
0

0.30m
0
0

0.25m

0
0

0.20m
0
0

0.15m 455.40
18.75
24.29

0
0
Work ItemQty / day Unit Crew
Qty # days
CARPENTRY WORKS
Partition Stud 1
3.19 0 496.5517 496.5517 bf 1 LM Carpenter
- 0 45.14107 62.06897 bf/hr/crew 9 Fin. Carpenters
3.19 bf/mnday 1 Helper
0.32 11

Walling 1/4" Plywood 1


206.06 0 47.76119 47.76119 m² 1 LM Carpenter
1,030.32 0 5.306799 5.970149 sm/hr/crew 4 Fin. Carpenters
1,236.39 sm/mnday 4 Helper
123.64 9

Walling 1/2" Plywood 1


95.82 0 40 40 m² 1 LM Carpenter
- 0 4.444444 5 sm/hr/crew 4 Fin. Carpenters
95.82 sm/mnday 4 Helper
9

Walling 3/4" Plywood 1


29.90654 29.90654 m² 1 LM Carpenter
3.322949 3.738318 sm/hr/crew 4 Fin. Carpenters
sm/mnday 4 Helper
9

Ceiling 1/4" Plywood 1


40 40 m² 1 LM Carpenter
4.444444 5 sm/hr/crew 4 Fin. Carpenters
sm/mnday 4 Helper
9

Ceiling 1/2" Plywood 1


29.90654 29.90654 m² 1 LM Carpenter
3.322949 3.738318 sm/hr/crew 4 Fin. Carpenters
sm/mnday 4 Helper
9

Ceiling 3/4" Plywood 1


24.06015 24.06015 m² 1 LM Carpenter
2.67335 3.007519 sm/hr/crew 4 Fin. Carpenters
sm/mnday 4 Helper
9

Ceiling Joist 1
496.5517 496.5517 bf 1 LM Carpenter
45.14107 62.06897 bf/hr/crew 10 Fin. Carpenters
sm/mnday
11

Installation of Metal Deck, wt 1


188.2353 188.2353 kg 2 Skilled Worker
47.05882 23.52941 kg/hr/crew 2 Helper
kg/mnday
4

Installation of Metal Deck, area 1


25.4372 25.4372 kg 2 Skilled Worker
6.3593 3.17965 sm/hr/crew 2 Helper
sm/mnday
4

Installation of Insulation, area 1


40 40 sm/day 1 LM
4 4.545455 sm/hr/crew 4 Skilled Worker
sm/mnday 6 Helper
10

1" x 2" Wood Ceiling 1


288 288 bf 1 LM Carpenter
57.6 36 bf/hr/crew 4 Fin. Carpenters
sm/mnday Helper
5

Moulding/Cornice 1
32 32 lm/day 1 LM Carpenter
4.571429 4 lm/hr/crew 6 Fin. Carpenters
lm/mnday Helper
7

Baseboard Installation 1
26.66667 26.66667 lm/day 1 LM Carpenter
5.333333 3.333333 lm/hr/crew 4 Fin. Carpenters
lm/mnday
5
Mnhr
Work ItemQty / day Unit Crew
per Unit
Qty # days
PAINTING WORKS
Int Wall (Latex Paint) Plain Fi 1
0.016 63.88 1.03 0 15.28662 15.28662 sm/day 1 Painter
0.145 63.88 9.26 0 5.095541 1.910828 sm/hr/crew 2 Helper
0.0161 63.88 1.03 sm/mnday 3
0.177 11.32

Int Wall (Latex Paint) Texture 1


0.168 63.88 10.70 0 13.71429 13.71429 sm/day 1 Painter
0.670 63.88 42.80 0 4.571429 1.714286 sm/hr/crew 2 Helper
0.670 63.88 42.80 sm/mnday 3
1.508 96.30

Ext Wall (Latex Paint) Plain F 1


0.200 63.88 12.78 0 13.71429 13.71429 sm/day 1 Painter
0.800 63.88 51.10 0 4.571429 1.714286 sm/hr/crew 2 Helper
0.800 63.88 51.10 sm/mnday 3
1.800 114.98

Ext Wall (Latex Paint) Textur 1


0.268 63.88 17.09 0 12 12 sm/day 1 Painter
1.070 63.88 68.35 0 4 1.5 sm/hr/crew 2 Helper
1.070 63.88 68.35 sm/mnday 3
2.408 153.79

Duco/Varnish 1
0.200 63.88 12.78 0 12 12 sm/day 1 Painter
0.800 63.88 51.10 0 4 1.5 sm/hr/crew 2 Helper
0.800 63.88 51.10 sm/mnday 3
1.800 114.98

Duco/Varnish-Baseboard 1
0.268 63.88 17.09 0 19.2 19.2 lm/day 1 Painter
1.070 63.88 68.35 0 6.4 2.4 lm/hr/crew 2 Helper
1.070 63.88 68.35 lm/mnday 3
2.408 153.79
Painting Wood 1
40 40 sm/day 1 FM
0.333 63.88 21.24 0 4 5 sm/hr/crew 3 Painter
1.330 63.88 84.96 0 sm/mnday 6 Helper
1.330 63.88 84.96 10
2.993 191.16
Ceiling Joist 1
496.5517 496.5517 bf 1 LM Carpen
0.016 63.88 1.03 0 9 Fin. Carpen
0.161 63.88 10.29 0 1 Helper
0.000 63.88 - 11
0.177 11.32

0.085 63.88 5.43 0


0.085 63.88 5.43 0

0.170 10.86

0.629 63.88 40.18 0


0.629 63.88 40.18 0

1.258 80.36

0.200 63.88 12.78 0


0.800 63.88 51.10 0
1.200 63.88 76.66 0
2.200 140.54

0.028 63.88 1.77 0


0.111 63.88 7.10 0
0.000 63.88 -
0.139 8.87

0.250 63.88 15.97 0


1.500 63.88 95.82 0
0.000 63.88 -
1.750 111.79

0.300 63.88 19.16 0


1.200 63.88 76.66 0

1.500 95.82
Mnhr
per Unit
Qty # days

0.523 63.88 33.43 0


1.047 63.88 66.86 0
1.570 100.29

0.583 63.88 37.26 0


1.167 63.88 74.53 0
1.750 111.79

0.583 63.88 37.26 0


1.167 63.88 74.53 0
1.750 111.79

0.667 63.88 42.59 0


1.333 63.88 85.17 0
2.000 127.76

0.667 63.88 42.59 0


1.333 63.88 85.17 0
2.000 127.76

0.417 63.88 26.62 0


0.833 63.88 53.23 0
1.250 79.85

0.200 63.88 12.78 0


0.600 63.88 38.33 0
1.200 63.88 76.66 0
2.000 127.76

0.016 63.88 1.03 0


0.145 63.88 9.26 0
0.016 63.88 1.03
0.177 11.32