1 Scope
This standard presents the mandatory requirements for the design and installation of
onshore power substations. This document may not be attached to nor made a part of
purchase orders.
2.1 If there are any conflicts between this Standard and associated project or
engineering documents, this standard shall take precedence. The exception is if
an approved Waiver Request has been included with the purchasing documents.
2.2 Any conflicts between this Standard and other Mandatory Saudi Aramco
Engineering Requirements (MSAERs*) or referenced industry standards shall be
identified to the Company or Buyer Representative who will request the
Manager, Consulting Services Department of Saudi Aramco, Dhahran to resolve
the conflict.
* Examples of MSAERs are Saudi Aramco Materials System Specifications (SAMSSs), Engineering
Standards (SAESs) and Standard Drawings (SASDs).
2.3 Direct all requests to deviate from this Standard in writing to the Company or
Buyer Representative, who shall follow internal company procedure SAEP-302
and forward Waiver Request to the Manager, Consulting Services Department
of Saudi Aramco, Dhahran requesting his approval.
3 References
The selection of material and equipment, and the design, construction, maintenance, and
repair of equipment and facilities covered by this standard shall comply with the latest
edition of the references listed below unless otherwise noted.
Page 2 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
Page 3 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
34-SAMSS-815 Annunciators
4 Definitions
Page 4 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
5 General
Page 5 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
Alarms are equipment specific. Most substations will not have all of
these alarms.
5.6 Tap changer, automatic voltage regulator, protection and circuit breaker control
panels shall be located inside the substation building when associated equipment
is located in an outdoor transformer yard or switchyard (e.g., transformer with
an automatic tap changer or outdoor circuit breaker).
5.7 HV Control and Protection panels shall be supplied either by the circuit breaker
manufacturer or an approved HV Control and Protection panel manufacturer, in
conformance with SAES-P-101 and 16-SAMSS-514. Control and Protection
panels shall be arranged as follows for each: Line protection and metering, Bus
Bar Protection, Feeder Protection and metering, Circuit Breaker Bay Control
including Breaker failure protection, and Automatic voltage regulation. The
panels shall be of simplex type having front door access with relays surface
mounted on the door. Circuit breaker control and indication functions shall be
arranged on the circuit breaker control panels to represent the substation
configuration (e.g., Breaker and half, inverted PI, etc.) and be interconnected by
a mimic line diagram indelibly represented on the surface of the panel with a
maximum of one substation bay per panel
Page 6 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
5.9 High voltage disconnect switches shall be manually operated double break,
center rotation type located at the tubular bus level.
6 Substation Buildings
6.3.3 The elevation of the bottom of the lowest interior cable tray shall be a
minimum of 2.67 m above the main substation floor.
Substation buildings housing Gas Insulated Switchgear (GIS) with 69kV voltage
rating and above.
Page 7 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
6.7 Exterior illumination shall consist of HID high pressure sodium type fixtures
controlled by a photo cell. A Hand-Off-Automatic (HOA) selector switch shall
be provided in accordance with SAES-P-123 requirements for exterior
illumination controls.
6.8 All interior substation lighting shall be fed from different power supplies
(i.e., fed from two different low voltage switchgear bus).
Commentary Note 6.8:
6.10 Duplex, 3-wire, 20 A, 120 VAC (NEMA 5-20R) convenience outlets shall be
provided throughout the substation building. A minimum of one outlet shall be
provided for each 6 m of wall space at 1 m above the floor. A minimum of two
outlets per substation shall be provided.
6.12 Substation roof drainage shall not be to the transformer yard side of the
substation building.
Page 8 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
6.13.2 The ground below the building shall be at or above finished grade.
6.13.4 Shall not drain to the transformer yard side of the substation building.
6.13.5 The side of the building adjacent to the transformer yard shall have a
solid wall (fire-rating the same as the building wall) that separates the
space from the transformer yard.
Commentary Note:
Note that this specification does not allow cable or electrical raceways
to enter/exit through the floor.
6.14 The concrete floor in front of switchgear shall be flush with the roller level of
lower breaker carriage rack and have a smooth surface to facilitate removal and
rolling of breaker. This floor area shall be surface hardened for rolling stock.
6.15 Underneath switchgear and controlgear, one of the following shall be provided
to ensure the equipment is maintained on an even plane:
6.15.2 The floor shall be horizontal in both planes with a maximum surface
height variation less than 5 mm per 3 meters.
6.16 Substation buildings shall have a minimum 2 hour fire rating and be constructed
in accordance with SAES-M-100 and where required SAES-O-100 and
SAES-O-109 standards.
6.17 A battery room and battery handling facilities shall be provided for stationary
batteries in accordance with SAES-P-103.
6.18 Circuit breaker testing facilities and operating tools shall be provided and
installed in the substation in accordance with SAES-P-116.
Page 9 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
Since providing for future double-ending will require additional floor space, this
should be addressed in the design basis or project proposal documents.
6.20 Substation buildings shall have a telephone and data communications. This
shall include connection to the plant local area network. SAES-P-126 mandates
a dedicated (stand lone) Ethernet network for the power monitoring system.
6.21 Substation buildings shall have provisions for mounting and protecting as-built
key one-line diagrams for ready reference of operating personnel.
6.22 Substation buildings shall have smoke detection systems per SAES-B-014.
6.23 Substation buildings shall have Distributed Control System (DCS) Input/Output
(I/O) ports available. This shall be implemented either by remote I/O racks(s)
and/or DCS controllers within the substation. Design, installation and
interconnection to plant DCS system shall be per the applicable SAES-J series
of standards.
Commentary Note 6.23:
7 Substation Yard
7.1.3 The intent of the above requirements is met by gate(s) which can be
opened to provide the required clearance.
Exception:
Page 10 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
Commentary Note:
7.2.1 For transformers containing 7570 liters and less of insulated oil:
Clearance shall be per 7.1 above.
7.2.2 For transformers containing more than 7570 liter of insulated oil:
a) The height of a fire barrier shall not be less than 300 mm above
the height of transformer tank, conservator (if applicable),
transformer bushing, and pressure relief vents, etc. (Figure 1).
7.3.2 For transformers containing more than 2500 liters of oil, the following
oil containment/drainage system shall be provided:
Page 11 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
ii) The steel grading mesh size shall be less than 25 mm².
7.4 Transformer Neutral Ground Resister (NGR) shall be located in the substation
yard. NGR shall not be mounted on a transformer.
7.5 The substation yard shall be completely paved as a plant area in accordance with
the requirements of SAES-Q-006. The thickness of the combined asphalt layers
shall not be less than 10 cm.
Commentary Note 7.5:
The high surface resistivity of an asphalt-aggregate mixture under both wet and
dry conditions reduces the number of ground grid conductors required to obtain
safe step and touch potentials during ground faults.
Page 12 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
7.7 Equipment located in the substation yard shall not be accessible from the roof of
the substation building.
X
2 hours Firewall
Building
Building
Substation
X
2 hours Firewall
X
<X <X
Generic
2m
1 hour Firewall 600 mm
Building 2 hours
Substation
Firewall
300 mm
600 mm
2m
600 mm
6.1m
6.1m
Figure-1
Page 13 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
6.1m
6.1m
Figure-2
7.8 120 VAC utility receptacles shall be provided with the following characteristics:
7.8.3 Outdoor units shall be equipped with self-closing covers which are
weatherproof when the covers are closed.
7.9 The outdoor high voltage substation and switchyard (69 kV and above) shall be
in accordance with the following:
Page 14 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
Page 15 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
7.10 Exposed equipment insulators, except for surge arresters, shall have a minimum
leakage distance of 40 mm per kV line-to-line of the nominal system voltage.
Page 16 of 17
Document Responsibility: Electrical Substations Equipment Standards Committee SAES-P-119
Issue Date: 5 October 2009
Next Planned Update: 26 May 2014 Onshore Substations
Ratings in the table are based on solidly grounded systems which is the Saudi
Aramco standard for these nominal system voltages. Ungrounded or resistance
grounded systems require higher arrester ratings. MCOV is "Maximum
Continuous Operating Voltage".
Revision Summary
26 May 2009 Revised the “Next Planned Update”. Reaffirmed the contents of the document and reissued
with minor revision.
5 October 2009 Minor revision.
Page 17 of 17