Weekly HSE Report - 13-05-2023
Weekly HSE Report - 13-05-2023
Weekly HSE Report - 13-05-2023
Date: 13/05/2023
AGENDA
HS&E STATISTICS
INCIDENT SUMMARY
KEY ISSUES
OPEN/CLOSE OBSERVATION & NCR
REPORTED NEAR MISS
PROJECT RELATED UPDATES
WELFARE FACILITY
HSE BEST PRACTISE
ENVIRONMENTAL BEST PRACTISE
HSE MILESTONES & ACHIEVEMENTS
1 Week Look Ahead
5. NO. OF INCIDENT/ACCIDENT 0 1 1
Lagging Indicators
1.2
0.8
0.6
0.4
0.2
0
15-Feb
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
KEY ISSUES
SN CONTRACTOR KEY ISSUES ACTION TAKEN
(Long Pending)
2 BENAN •
•
Proper Internet connection not provided
Some of medical items are not provided as per MOH requirements In Progress of rectification
• No Equipment/machinery/devices checklist maintained (Long Pending)
• Delay in report submission Daily , weekly & Monthly
• Lack of HSE documentation & site supervision
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
OPEN/CLOSED OBSERVATION & NCR
SN CONTRACTOR OPEN OBSERVATION CLOSED OBSERVATION
1 RPCO 2 5
2 BENAN 1 3
1 RPCO 0 2
2 BENAN 3 0
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
RPCO OPEN/CLOSED OBSERVATION
Doc: PW-2022001B-C0000-JAS-HSE-RPT-000001
Project Name : Project - W Observation Raised by: Abhinav.D.J
Observation Closed by: ILYAS KHAN
Package Name: Advance Work Package-A Date of Issue : 06/05/2023 Date of Close: 11-05-2023
Observation Number 006 Contractor Name : RPCO
Risk Rating Date
No. H&S Observation Details Photo Corrective Action Closeout Photo
& Time Frame Closeout
10-May-23
Observed damaged water tank support structure & Re-astablish the water tank support structure with
toilet container at crusher area. Proper entry point Imminent Danger - additional leader, provided the stairs at entrance
1 door of toilets porta cabin and erected the door
(Stairs) , Ladder to support during filling & Automatic Immediately
Door closure to be provided. closer as wel.
9-May-23
In process of hiring
Open
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
RPCO OPEN/CLOSED OBSERVATION & NCR
RPCO NCR (OPEN/CLOSED)
SN CONTRACTOR NCR issued on ACTION TAKEN
1 RPCO • RPCO not complied as agreed date 26-Feb-23 stipulated in the comment CLOSED
sheet. (PW-2022001B-C0101-JAS-PCM-NCR-000001)
• RPCO to provide visible Sta. number in the roads (PW-2022001B-C0101-JAS-
PCM-NCR-000002 )
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
BENAN OPEN/CLOSED OBSERVATION
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
BENAN OPEN/CLOSED OBSERVATION & NCR
BENAN NCR (OPEN/CLOSED)
SN CONTRACTOR NCR issued on ACTION TAKEN
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
REPORTED NEAR MISS
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
INCIDENT SUMMARY
PACKAGE CONTRACTOR INCIDENT INCIDENT BRIEF DECRIPTION ROOT CAUSE ACTION STATUS
CLASSIFICATION DATE
A RPCO Property damage 15-02-23 Electric pole hit by unknown vehicle Poor Illumination
at incident
Hard
barriers
Closed
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
PROJECT RELATED UPDATES
SN DESCRIPTION PHOTOS
RPCO;
1. Station (15+500 to 15+750 and 15+750 to 15+950) spreading, grading,
levelling and compacting 4th BACKFILL 30CM layer of Subgrade
Material (READY FOR FDT)
2. Station (9+000 to 8+000 and 10+000 to 9+000) spreading, grading,
levelling and compacting SUBBASE 20CM layer.
3. R1 – Clearing/Backfilling Works from 0+200 up to St. 0+400 and
Laying Backfill Layers between 0+000 to 0+200
4. R2: (1+000 to 1+650) Excavation/ Slope Scaling of Benches.
5. R2: (0+900 to 1+000) Rock filling EMBANKMENT SLOPE 2nd Layer
6. R2 – Excavation/ Backfilling from St. 0+700 to 0+900
7. R3 – Laying Backfill Layers between 15+200 to 16+000.
8. R3 – Laying SUBBASE Layer starting from St. 10+000 down to
9+000, from St. 9+000 down to 8+000 and from St. 12+300 down to
11+000.
9. Fence – 1B: Barbed Wires installation up to 1+500 and Extension Arms
installation up to 3+000.
10. Fence – 1B: Excavation Works from St. 0+000 up to 3+300 and
Concrete foundation Pouring up to 1000 concreted posts.
11. Fence – 1B: Grading from St. 2+000 up to 5+500.
12. Site Office FDT for BACKFILL Layer for under office buildings areas.
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
PROJECT RELATED UPDATES
SN DESCRIPTION PHOTOS
1. BENAN
• Continue drilling BH M 122 at Monolith total depth 10.5m to 27m (stuck
drilling rods).
• BH M 113 at Monolith total depth 52m to 55m (Drilling rods stuck no
progress).
• (we faced total water loss at a depth of 15m & 24m).
• Continue drilling BH M 130 at Monolith total depth 78.5m to 80m.
(breakdown)
• Continue drilling at Secondary Wadi route 0 BH 7 total depth 0.0m to
15.0m.
• Continue drilling at Secondary Wadi route 0 BH 13 total depth 0.0m to
10.5m.
• Continue Angle drilling BH M 102 at Monolith depth 0.0m to 2.0m.
• The lifting operation was stopped at 3.45 pm.
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
WELFARE FACILITY
CONTRACTOR TOTAL EMPLOYEE’S HSE TOILET RESTING SHELTER PRAYER AREA
NAME AVAILABLE/REQUIRED AVAILABLE/REQUIRED AVAILABLE/REQUIRED AVAILABLE/REQUIRED
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th, 2023
HSE BEST PRACTISE
HSE BEST PRACTISE HSE BEST PRACTISE
PHOTO PHOTO
BENAN - TBT conducted regarding the topics of General safety rules, and
BENAN - TBT conducted regarding the topics of Working at Elevated area & procedure.
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th-2023
ENVIRONMENTAL BEST PRACTISE
ENVIRONMENTAL BEST PRACTISE ENVIRONMENTAL BEST PRACTISE
PHOTO PHOTO
BENAN: Housekeeping on daily basis. BENAN: Housekeeping at monolith for environmental protection & Control.
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th-2023
HSE BEST PRACTISE
HSE BEST PRACTISE HSE BEST PRACTISE
PHOTO PHOTO
RPCO – Providing chill drinking water to all working crew with in 100 meters of their
RPCO; access.
• Flagman assigned within 60 degrees of the rear end of vehicle when reversing.
• Also flagman's assigned with each working equipment.
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th-2023
HSE BEST PRACTISE
HSE BEST PRACTISE HSE BEST PRACTISE
PHOTO PHOTO
RPCO - Mass TBT conducted regarding the topics of General safety rules,
RPCO –RPCO hired toilets cleaner to maintain the cleaning and housekeeping Transporting personnels at equipment's strictly prohibited, and Fire Extinguisher
importance.
as part of welfare facilities.
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th-2023
ENVIRONMENTAL BEST PRACTISE
ENVIRONMENTAL BEST PRACTISE ENVIRONMENTAL BEST PRACTISE
PHOTO PHOTO
RPCO- RPCO -Spraying water at access road been maintained as part of safety &
1. Trash bins located at suitable points around site and in case of slightly full emptied environmental protection/Dust prevention plan on daily basis.
it in skip bin and dispose the skip bin each week by certified sub-contractor.
2. Provided separate food waste skip bin to dispose on daily bases to avoids
attracting of pests.
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th-2023
PROJECT MILESTONES/ACHIEVEMENTS
SN DESCRIPTION
RPCO –
• R1 - Monolith Haul Road finished survey and alignment.
Up to
• R2 – Cut and Fill on going .
• R3 - Grading sub base and base course infra structure.
1. • Fence 1 – (Monolith boarder) clearing, Grading & post installation
• Fence2 – (Project-w perimeter fence); Installing posts, Mesh and Tension
wires.
• RPCO is Sending additional Equipment's to increase productivity.
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th-2023
PROJECT MILESTONES/ACHIEVEMENTS
SN DESCRIPTION
BENAN : Up to
• Finish 12 BH on phase1.
1. •
•
5 BH in progress (phase 1).
Submit the interpretive report for permanent road (21 bh).
• Submit the draft report of Phase 1 (10 BH).
• Submit the MASW interpretive report .
• Submit the InSAR study report.
• Finish 10 BH on the secondary route 2 BH in progress.
• Add 2 rigs at the monolith.
PROJECT-W ADVANCE WORK PACKAGE-A HSE Data - From May 7th to May 13th-2023
ONE WEEKS LOOK AHEAD
RPCO • Precast progress for over all project for next week is 5.9%
BENAN •
•
Continue drilling 0 BH-07 at Wadi.
Continue drilling 0 BH-13 at Wadi.
• Continue Angle drilling at Monolith BH M-102.
• Continue drilling BH M 122 at Monolith (stuck drilling rods.
• Continue drilling BH M 113 at Monolith (Drilling rods stuck).
• Continue drilling BH M 130 at Monolith (breakdown).