02 Technical Specification
02 Technical Specification
Table of Contents:
1 General ..............................................................................................................2
1.1 Summary of main scope of supply ....................................................................2
1.2 Paint specification .............................................................................................2
1.3 Documentation ..................................................................................................2
1.4 Installation .........................................................................................................2
1.5 Classification .....................................................................................................2
1.6 Spare parts........................................................................................................2
1.7 Material specification.........................................................................................3
1.8 Others ...............................................................................................................3
1.8.1 Language ..........................................................................................................3
1.8.2 Units ..................................................................................................................3
1.8.3 Grease nipples ..................................................................................................3
2 Project data .......................................................................................................4
2.1 General design criteria ......................................................................................4
2.2 Windlass (W1/W2) ............................................................................................4
2.2.1 Cable lifter unit ..................................................................................................4
2.2.2 Anchor/Mooring winch.......................................................................................4
2.3 Mooring winch (M1-M4) ....................................................................................4
2.4 Brake test kit .....................................................................................................5
2.5 Piping diagram ..................................................................................................5
3 Technical Specification ....................................................................................6
3.1 Windlass............................................................................................................6
3.1.1 Cable lifter unit ..................................................................................................6
3.1.2 Anchor/Mooring winch.......................................................................................6
3.2 Mooring winch ...................................................................................................6
3.3 Brake test kit .....................................................................................................6
3.4 Piping diagram ..................................................................................................6
3.4.1 Isolation valves (Buyer supply) .........................................................................7
3.4.2 Counter flanges (Buyer supply).........................................................................7
3.4.3 Information ........................................................................................................7
Aker Pusnes AS
Page 1 of 7
CONFIDENTIAL
SHOULD NOT BE DISTRIBUTED AND / OR BE MADE AVAILABLE TO THIRD PARTIES WITHOUT OUR WRITTEN CONSENT
Doc. type Issued by/date
Doc. no. Rev by/Date
Rev No: 04
Title: General
Rev Date: 11.02.08
1 General
The complete spare part lists will be submitted together with the Certified (Working)
documents and the instruction manuals.
Aker Pusnes AS
Page 2 of 7
CONFIDENTIAL
SHOULD NOT BE DISTRIBUTED AND / OR BE MADE AVAILABLE TO THIRD PARTIES WITHOUT OUR WRITTEN CONSENT
Doc. type Issued by/date
Doc. no. Rev by/Date
Rev No: 04
Title: General
Rev Date: 11.02.08
Brake drum surface : See chapter 3.1 Windlass and 3.2 Mooring Winch
1.8.1 Language
All drawings, documentation and signs to be written in English language.
1.8.2 Units
All units to be according to SI/Metric system. However indication of pressure to be in
BAR.
Aker Pusnes AS
Page 3 of 7
CONFIDENTIAL
SHOULD NOT BE DISTRIBUTED AND / OR BE MADE AVAILABLE TO THIRD PARTIES WITHOUT OUR WRITTEN CONSENT
Doc. type Issued by/date
Doc. no. Rev by/Date
Rev No: 04
Title: Project data
Rev Date: 11.02.08
2 Project data
2.1 General design criteria
Ambient temperature : -20°C to +45°C (Outside)
0°C to +45°C (Inside)
Relative humidity : To be less than 95%
Vibration and shock : According to Class
Aker Pusnes AS
Page 4 of 7
CONFIDENTIAL
SHOULD NOT BE DISTRIBUTED AND / OR BE MADE AVAILABLE TO THIRD PARTIES WITHOUT OUR WRITTEN CONSENT
Doc. type Issued by/date
Doc. no. Rev by/Date
Rev No: 04
Title: Project data
Rev Date: 11.02.08
Aker Pusnes AS
Page 5 of 7
CONFIDENTIAL
SHOULD NOT BE DISTRIBUTED AND / OR BE MADE AVAILABLE TO THIRD PARTIES WITHOUT OUR WRITTEN CONSENT
Doc. type Issued by/date
Doc. no. Rev by/Date
Rev No: 04
Title: Technical Specification
Rev Date: 11.02.08
3 Technical Specification
3.1 Windlass
Each windlass is of a combination of a cable lifter unit and an anchor/mooring winch
that consists of the following:
− Non auto-tension mooring winch with two (2) declutchable split drums and one (1) warping
end
− The band brake(s) is of manually operated spring-applied type
− The mooring winch gear is of enclosed type
− Brake drum of mooring winch to be of SUS304
− Hydraulic motor
− The speed & direction of the mooring winch is to be operated locally from the winch side
− Hydraulic jack with flexible hose and hand pump with manometer
− Connection bracket including bolts for mounting on the drum flange
− Storage box marked “WINCH BRAKE TEST KIT” including part list & test procedure
Aker Pusnes AS
Page 6 of 7
CONFIDENTIAL
SHOULD NOT BE DISTRIBUTED AND / OR BE MADE AVAILABLE TO THIRD PARTIES WITHOUT OUR WRITTEN CONSENT
Doc. type Issued by/date
Doc. no. Rev by/Date
Rev No: 04
Title: Technical Specification
Rev Date: 11.02.08
3.4.3 Information
Hydraulic system
The hydraulic system is based on a ring main system with the following pressure
characteristics:
Design working pressure, P- : 250 bar (Actual working pressure to be confirmed by the
line yard)
Safety valve setting pressure : 270 bar
Design working pressure, T- : 10 bar
line
Piping
The shipyard is responsible for all pipe work/installation including calculation of pipe
wall thickness and material. For recommendations on pipe installation, please refer to
“PUSNES INSTRUCTIONS / RECOMMENDATIONS FOR INSTALLATION AND
STARTING UP”, PS 8104. Pusnes shall inform the yard the minimum inner pipe
diameters in order to meet our requirement to oil flow.
Hydraulic oil
Type of hydraulic oil and viscosity class shall be in accordance with
“RECOMMENDED OIL TYPES FOR PUSNES HYDRAULIC POWER UNIT”, PS
1954.
Aker Pusnes AS
Page 7 of 7