ARCHITECTURAL WORKS
GENERAL REQUIREMENTS 15,000
SITEWORK 10,000
400X400 CERAMIC FLOOR TILE 300 pcs 260.00
200X200 PORCELAINFLOOR TILE 200 pcs 200
122X244 VINYL TILE BOARD 250 pcs 70
400X400 MARBLE FLOOR TILE 250 pcs 250
PERMACOAT S/G BEIGE 10 L 200
PERMACOAT S/G LATEX 10 L 200
PERMACOT S/G LATEX WHTE 10 L 200
PLASTER BOX CEILING 50 sqm 300
40X40 CEILING TILE 100 sqm 350
FURNITURES 50 pcs 500.00
DOORS AND WINDOWS 30 pcs 1,000
LABOR 5 day 350
TOTAL COST:
15,000
10,000
₱ 78,000.00
₱ 40,000.00
₱ 17,500.00
₱ 62,500.00
₱ 2,000.00
₱ 2,000.00
₱ 2,000.00
₱ 15,000.00 bakit sobrang pogi ni erwin bernie veras marzan
₱ 35,000.00
₱ 25,000.00
₱ 30,000.00
₱ 1,750.00
₱ 335,750.00
₱ 272,000.00
₱ 350,000.00
₱ 300,000.00
₱ 49,920.00
₱ 32,000.00
₱ 310,250.00
₱ 416,000.00
₱ 81,000.00
₱ 1,200,000.00
₱ 117,000.00
₱ 3,150,000.00
₱ 800,000.00
₱ 7,078,170.00
₱ 133,540.00
₱ 12,600.00
₱ 19,950.00
₱ 122,000.00
₱ 24,000.00
₱ 312,090.00
₱ 510,400.00
₱ 36,600.00
₱ 53,550.00
₱ 3,490,000.00
₱ 28,560.00
₱ 4,119,110.00
₱ 215,600.00
₱ 21,000.00
₱ 31,500.00
₱ 410,000.00
₱ 291,000.00
₱ 12,800.00
₱ 981,900.00
₱ 112,420.00
₱ 8,415.00
₱ 19,631.50
₱ 332,000.00
₱ 288,000.00
₱ 48,000.00
₱ 808,466.50
₱ 1,315,600.00
₱ 119,100.00
₱ 103,250.00
₱ 1,395,000.00
₱ 48,000.00
₱ 2,980,950.00
₱ 92,400.00
₱ 6,750.00
₱ 14,140.00
₱ 130,000.00
₱ 5,600.00
₱ 248,890.00
₱ 16,529,576.50