Carried out Plate Load Test on stone M/s. Keller Ground Engineering 1.82
column up to 60 MT on 1.68 M² Plate Pvt. Ltd, 203-Wellington B/Park-1, (Excluding material)
2
at Kandla Port, Gandhi-dham,Gujrat. D.P.Road, Off Andheri Kurla Road.
Pr Project-Finish
Marol, Andheri (E), Mumbai – 400059.
Carried out soil investigation work at M/s Gannon Dunkerley & Co.Ltd 0
Anpara, UP, for Water Treatment Plant B-228, Okhla Ind.Area, Phase-1,(I (Excluding material)
for NTPC, Anpara – D. New Delhi – 110020 Pr Project-Finish
3
(I
Providing Test Pile of 600mm dia M/s. IVRCL Infrastructures & 5.68
by DMC Method, and conducting Projects Ltd. (Excluding material)
Pile Load Test, Lateral Test and IVRCL House # 35, Suyojana CHS,
Pr Project-Finish
4 Pull Out Test at Rihand NTPC Lann No. 5, Koregaon Park,
Phase-III, Rihand-UP. Pune- 411001, Maharastra.
Carried out Plate Load Test at AREVA M/s. Keller Ground Engineering2 4.48
Site on 500mm & 900mm dia Stone India Pvt Ltd. 219 – Best Arcade (Including material)
Column & Pile Load Test as Vertical, building, Plot – 3, Pocket-VI. Pr Prooject-Finish
5 Pull out & Lateral Test on 600mm dia pile Se Sector – 12, Dwarka, N.Delhi-75.
Pull Out Test at Rihand NTPC
Phase-III, Rihand-UP.
Carried out soil investigation work and M/s. Keller Ground Engineering 1.43
Plate Load Test at Goindwal Sahib for India Pvt Ltd. 219 – Best Arcade (Including material)
Bearing capacity of soil, building, Plot – 3, Pocket-VI Pr Project-Finish
6 Amritsar, Panjab. Sector – 12, Dwarka, N.Delhi-75.
19 Carried out soil investigation work along M/s. DSC Limited. 2.67
with Lab Testing for design & construction Flat No. 901, Tower-3, (Including machinery)
of Multi Story Car Parking at Greater- Palm Apartments, Sectot-30, Project Finish
Kailash-1, Delhi for MCD, Delhi. South City – 1, Gurgaon -122001
20 Carried out Pile Load Test on 1000mm dia M/s. J.Kumar Infraprojects Ltd 13.16
Pile for Design & Construction of Viaduct 16 – A, Andheri Industrial Estate. (Including Instruments)
& Two Elevated Station, Rohini Sect-18 & Veera Desai Road, Andheri Project Going on
Badli to Jahangirpuri, of MRTS for DMRC (West)
Mumbai - 400053.
21 Carried out Deflection Test for Rly Bridge M/s. Larsen & Toubro Ltd, 13 5.51
For 3rd Rly Line const. between Panskura ECC (Including Instruments)
& Kharagpur for Rail Vikas Nigam Ltd. L & T House, Ballard Estate, Project Finish
P.O.Box 278, Mumbai-400001
22 Providing Pile Construction work of 1000 M/s. Coastal Projects Limited 30.56
mm dia by Rotary Method (T.Mountain No. 304 - O, Road No. 78 (Including machinery)
Machine) for 2nd Part of Nellore Barrage Film Nagar, Jubilee Hills Project-Finish
Cum Bridge of Package - 6, AP. Hyderabad, AP.
24 Providing Soil Investigation for Bridges M/S Neel Construction Links 1.43
For Bagodara-Wataman-Tarapur-Vasad Private Limited. (Including Equipment)
Road Section of SH -8 at KM 17+280 870,Sector-15/II ,Gurgaon Project Going on
In the Gujrat (Cup & Pup) Haryana - 122001
4.34
Carrying out Vertical Routine Pile Load M/S Rohan Rajdeep Tollways
26
(Static) testing on 1200 mm dia Cast in-Situ- Limited. 3.75
Pile with maximum Kentledge weight of The ―Revene‖,First floor 805, (Including Equipment)
656 Tone carrying Test as per IS:2911 Bhndarkar Institute Road Project Going on
Part-4:1985. Pune-411004,Maharastra.
Carrying out Pile works with Hydraulic Rig M/S IVRCL Limited,
For the Project: Construction of 4100 units ―MIHIR‖,8-2-350/5/A/24/1B, 652.104
27
Housing unit(under Phase-I of 15000 units) for Road No.2 Bamjara Hill (IncludingMachineries)
relocation of underserved settlements in the city Hydrabad-500034 (AP)
of Colombo,(Sri Lanka).
Urban Development Authority(UDA) of Sri
Lnaka.
Conducted single Column Load Test at M/s. Keller Ground Engineering 10.56
Foundation level of the column ,as per Pvt. Ltd, 203-Wellington B/Park-1, (Including Equipment)
28
IS-1528 part-1. D.P.Road, Off Andheri Kurla Road. Project Finished
a project of Gamesa Wind Turbine Pvt Ltd. Marol, Andheri (E), Mumbai –
59.
Conducting Soil Investigation and Pile M/S J Kumar Infraprojects Ltd. 3.76
Integrity Test, at Badli Station, 16-A,Andheri Industrial (Including Equipment)
29
a CC02 DMRC Project. Estate,Veera Project Going on
Desai Road ,Andheri(W)
Mumbai-400053
Conducting Vertical Initial Pile load Test and M/S J Kumar Infraprojects Ltd.
routine pile load test(Static) on 1000mm 16-A,Andheri Industrial 10.67
dia cast in situ pile up to 1170 MT load carrying Estate,Veera (Including Equipment)
30 test as per IS:2911.and Conducting Desai Road ,Andheri(W) Project Finished
High Strain Dynamic Testing on RC Board Mumbai-400053
Pile dia 1000mm using pile driving analyzer.
a CC02 site of DMRC project.
31 Conducting soil Investigation bore holes up to M/S Jindal Poly Film Limited 1.85
10 mts and collecting Soil/Rock samples Igatpuri-Nasik, (Including Equipment)
Including Lab Testing works intensity. Maharastra. Project Going on
33 Carried out Plate Load Test on single and M/s. Keller Ground Engineering 8.42
group stone column on 2.05M² & 3.55M² Pvt. Ltd, 203-Wellington B/Park-1, (Excluding material)
Test Plate for Storage tank for. D.P.Road, Off Andheri Kurla Road. Project Going on
Delhi Jalborad. Marol, Andheri (E), Mumbai – 59.