Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

TD 76m New

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Bill of Quantities (BOQ)

Project :A/K/S/C W-13 Tuludimtu Neighborhood Construction Of Dich-Lot 1(N)….Concrete Pipe


Location: Tuludimtu, Addis Ababa
Client : Akaki Kality Sub City Woreda-13 Community Mobilaization Office
Contractor: ---------------------------------------
Contrat
Item Description Unit Unit Rate Amount
Qty
1 Excavation & Earth Work
1.1 Clear and remove top soil to an average depth of 200mm. M2 114.00 49.00 5,586.00

1.2 Structural excavation in loose and dry soil to 1500mm depth M3 159.60 485.59 77,500.16

1.3 Structural excavation in soft rock to 1500mm depth M3 1.00 1,069.00 1,069.00
1.4 Supply and compact 15 cm red Ash under RC pipe. M3 5.32 600.00 3,192.00
Cart away excavated material to a convinent place of
1.5 M3 159.60 185.88 29,666.45
maximum distance 5 km.
Total carried to Summary… (1) 117,013.61
2 Concrete Pipe Work
Supply and construct 10 mm lean concrete quality C-5, with
2.1
minimum cement content of 150 kg /m3, of concrete:
a) Under masonary wall at end walls M2 0.20 307.84 61.57
2.2 Supply and install Diameter 80cm Concrete Pipe ML 76.00 4,500.00 342,000.00
Total carried to Summary… (2) 342,061.57
3 Backfill
3.1 Backfill and compact well with appropriate selected materials M3 121.42 850.00 103,204.96
Total carried to Summary… (3) 103,204.96
4 Man hole

Build manhole on line to keep the pipe by 200mm class-C


4.1
with mortar (1:4) & two cotes of cement plastering (1:3).

a) Lean concrete M2 2.88 365.00 1,051.20


b) Construct SB block class-C wall M 2
7.68 2,618.00 20,106.24
c) Concrete of class C-25 M 2
2.00 1,600.00 3,200.00
d) Form work M2 0.80 687.65 550.12
e) Grade 40 reinforcement (8mm) Kg 12.78 113.52 1,450.79
Total carried to Summary… (4) 26,358.35
TOTAL (1+2+3+4) 588,638.49
Contractor profit 111,841.31
15% VAT 105,071.97
GRAND TOTAL 805,551.77

ፕሮጄክቱን የሚከታተል በለሙያ ስም -------------------- ፍርማ------------------------ቀን--------------------------


ስራዉ እንዲሰራ ያዛዘ ሃላፍ ስም------------------------------ ፍርማ-----------------------ቀን---------------------------
Bill of Quantities (BOQ)
Project :A/K/S/C W-13 Tuludimtu Neighborhood Construction Of Dich-Lot 1(N)….RC Pipe
Location: Tuludimtu, Addis Ababa
Client : Akaki Kality Sub City Woreda-13 Community Mobilaization Office
Contractor: ---------------------------------------
Contrat
Item Description Unit Unit Rate Amount
Qty
1 Excavation & Earth Work

1.1 Clear and remove top soil to an average depth of 200mm. M2 114.00 49.00 5,586.00

Structural excavation in loose and dry soil to 1500mm


1.2 M3 159.60 485.59 77,500.16
depth
1.3 Structural excavation in soft rock to 1500mm depth M3 1.00 1,069.00 1,069.00

1.4 Supply and compact 15 cm red Ash under RC pipe. M3 5.32 600.00 3,192.00
Cart away excavated material to a convinent place of
1.5 M3 159.60 185.88 29,666.45
maximum distance 5 km.
Total carried to Summary… (1) 117,013.61
2 Concrete Pipe Work
Supply and construct 10 mm lean concrete quality C-5,
2.1 with minimum cement content of 150 kg /m3, of
concrete:
a) Under masonary wall at end walls M2 0.20 307.84 61.57
2.2 Supply and install Diameter 80cm RC Pipe ML 76.00 7,000.00 532,000.00
Total carried to Summary… (2) 532,061.57
3 Backfill
Backfill and compact well with appropriate selected
3.1 M3 121.42 850.00 103,204.96
materials
Total carried to Summary… (3) 103,204.96
4 Man hole
Build manhole on line to keep the pipe by 200mm class-
4.1 C with mortar (1:4) & two cotes of cement plastering
(1:3).
a) Lean concrete M2 2.88 365.00 1,051.20
b) Construct SB block class-C wall M 2
3.75 2,618.00 9,817.50
c) Concrete of class C-25 M 2
2.00 1,600.00 3,200.00
d) Form work M 2
0.80 687.65 550.12
e) Grade 40 reinforcement (8mm) Kg 12.78 113.52 1,450.79
Total carried to Summary… (4) 16,069.61
TOTAL (1+2+3+4) 768,349.75
Contractor profit 145,986.45
15% VAT 137,150.43
GRAND TOTAL 1,051,486.63

ፕሮጄክቱን የሚከታተል በለሙያ ስም -------------------- ፍርማ------------------------ቀን--------------------------


ስራዉ እንዲሰራ ያዛዘ ሃላፍ ስም------------------------------ ፍርማ-----------------------ቀን---------------------------

You might also like