PRODUCT INCLUDED:
products. These are: Encoder unit print, Hall landing Indicator Module
The four products are all included in a whole indication system, which adopts
dot matrix display technique. It can be modified very easily for customers and display
the content by applying floor definition software operated in WIN9X, WIN2000, WIN
Work principle: Encoder converts Gray code and other lift messages into
communication wire, the code will be transmitted to the indicators. Module A &
Module D will indicate the contents after receiving it. On the contrary, car indicator
can accept gray code from lift controller and other status signals independently.
The system can support up/down arrow, numbers 0-9, English characters,- and
special graphics and characters. It also can provide special messages such as “out of
service” both in English & Chinese(Module A & Module D can display, but car
indicator can not) Font such as 0-9, A-Z, __ 2-bit and 10 3-bit number such as LG1
signals between English and Chinese, VANDER version and API version can be
available.
Note: Do not install J1 jumper cap of API indicators at usual state. Changes are prohibited without
special requirements.
¾ Office buildings
o
6 Tamb Operating temperature 0 70 C
Table 1.1
Note 1:
Car indicator (57910071, 57910529 & 57910117) can be referred to item 1,2,6
Note 2:
The results are only on basis of theory, and just for reference.
o
Tamb Operating temperature 0 75 C
o
Tstg Storage temperature -25 85 C
Table 1.2
Note: Power consumed for Encoder (57910068) is 1W; for Module A (57910069,57910115) & D
(57910070,57910116) are 3.5W; for car indicator (57910071, 57910529& 57910117) is 4W.
Attention:
Stress above those listed may cause permanent damage to the device. This is a stress rating only
and functional operation of the device at those or any other conditions above those indicated in the
operation listings of this specification is not implied. Exposure to maximum rating conditions for
Mounting
Installation Procedures
Installing Encoder(57910068)
IMPORTANT: Before install the encoder, be sure to disconnect the lift shaft cable and
The first thing for installing the encoder is to connect the DC power 24V to J3
Then, turn on the CB switch. The encoder PCB "LED" will light on, which
Use the multimeter to check whether the voltage in position 1 and 2 of J3 terminal
is normal or not ( 24V-30V). Also, check whether the voltage of "S+" and "S-" in
After checking the above, plug-in the lift control signal wires to the position of J3
and J4 terminal respectively. It should be sure that the control signal wires is correctly
Connect only one unit of Module A & D indicator into the encoder in machine
room. The scanning function of indicators will be shown, which means connection of
the system is OK. Then turn off the power of encoder unit.
Turn on power of encoder again, the indicator will show the update corresponding
Now, connect the four vertical cables LR-U, LR-D, LW-U, LW-D into the
encoder J4 for pin 1, 2, 3 and 4 respectively. It should be sure that the vertical cables
REMARK: The encoder will transmit the signal once time only there is a change of lift
control signal. If no change of control signal, the encoder will not take any action.
indicator. (Refer to Encoder part.) And take sponge off before installation.
check whether the pressure is within the allowable limits on every step.
The first step, make sure the horizontal cable is connected properly and use
multimeter to measure pin signal wire, and check whether signal is correct or not.
The second step, plug-in the indicator, scanning function will show. Then does
The second step, please plug power wire into power socket.
The third step, turn on power, scanning function will display immediately, then
REMARK: If only scanning function displays, that means is no change from lift signal
Because of installation with electricity, touch is prohibited. Peel sponge off only
before installation.
Encoder no function:
Check whether the Encoder PCB signal " S+" and "S-" are correct or not.
Check whether the sequence of Gray code Signal and control wire is right or not.
If the wrong display sequence appears, please check Gray code signal wire. And
No display function, please check to see if power wire is connected correctly. Or Gray
¾ Make sure the rightness in placing the RS485 terminal before using it.
57910068 Lift
Encoder Grade code
Select Enable
Top floor
Module A (57910069,57910115)&
D (57910070 &57910116) series of
indicator
485S-orR+
S-
RS232/RS422.485
Encoder RS485 RS232 Computer port
57910068
Converter
S+
485S+orT+
Figure2.2
Note: please disconnect the two wires in using display before using it. Then connect with
Functional table
z = Active X = "Don't care" for active or inactive
Diagram
Figure 2.3
Note: “0” stands for non-short connected; “1” stands for short-connected.
Unit dimension (W x H) 60 x 40 mm
Table 3.1
Table 3.2
Interface connections
Diagram
Figure 3.1
Figure 3.2
Figure 3.3
Figu re 3.4
J1 Truth table
2 1 0
Status API/VANDER O/S in Chinese O/S
INDICATOR
API INDICATOR, O/S,
0 0 0
O/S in Chinese
API INDICATOR, Out
0 0 1
of service
API INDICATOR, O/S in
0 1 0
Chinese
COMPATIBLE WITH
0 1 1
OTHER SETTINGS
VANDER INIDCATOR,
1 0 0
O/S, O/S in Chinese
VANDER INIDCATOR,
1 0 1
out of service
VANDER INIDCATOR,
1 1 0
O/S in Chinese
Factory test
1 1 1
Table 3.4
57910068
Encoder Gray code& Lift
board control signal
Machine room
controller
Select Enable
indicator
indicator
S+ S- 0V 24V
Figure 3.5
Module A & D indicators can be connected at the same. (Amounted to 128 pieces at most)
PART 4
Car indicator(57910071, 57910529, 57910117)
Physical data
Diagram
Figure 4.1
Figure 4.2
Note: “1” stands for short connected; “0” stands for non-short connected.
Block diagram
I) Principle
Figure 4.3
Note : For details, refer to Landing indicator Module A & D’s block diagram.
485S-orR+
S-
Car indicator RS232/RS422.485
57910071/ RS485 RS232 Computer port
57910117 Converter
S+ 485S+orT+
Figure 4.4
Note: please disconnect the two wires in using display before using it. Then connect with
J1 Truth table
Status 0 1 2 3
Receive 485 signals 1 0 0 0
0 1 0 1
0 1 0 0
0 0 1 1
0 0 1 0
0 0 0 1
Factory test 1 1 1 1
Table 4.3
Floor definition adopts new communication protocol, which send the defined
indication contents to Encoder and car indicator according to entering floor code.
Note: Floor encoding has been set according to the demands of customers before their
leaving factory.
Operating environment
platforms. The computer should be have at least a com port, and the com port nunber
should be 1 or 2. The USB-RS232 convertor can be used if the computer does not
have com port, but remember to set the USB com port number to 1 or 2.
Functions
Define the display content of stops in direct interface, and write the display
contents to Encoder and car indicator correspondingly between “stop” and “display”.
Software setting
User have to create two paths under path.ini which is under setting catalogue before use
it ,one path is [File] for customer saving files which is defined by customers, another path is [Test]
for customer saving report of test。
The blue background interface is classified into 2 parts, one is auto input,
z Input by hand: User can edit the content of display column directly .
There are 3 columns: code, stop, and display. And the state can be switched by
auto/manual button.
How to edit:
(1) Auto input: Please enter commission No, and then click programming button ,
related message will be displayed on the column of display according user previous
setting. Operator ID means operator No, and Material ID means encoder board No. or
monitor No.
(2)Input by hand: User can edit the column of display directly ,and remain operation is the
How to send:
(1)Click button to select com port number. The baud rate must be 4800bps.
(1) Click Send button ,a window will be appeared after communication success, click “OK”
a report of test will be created。
Note: You must be sure computer port, converter, encoder or car indicator are
Procedures:
be in receiving state.
4. Edit the codes you want, and save it. Then Click “SEND” button. The signals will
be sent to PCB. Take off the two wire of 485S+ or T+ & 485S- or R+ port.
place of J1. Turn on power, encoding can be tested and supervised. If connection
Communication diagram
S- 485S-orR+
Encoder &
Car indicator RS232/RS422.485
57910068 RS485 RS232 Computer port
57910071/ Converter
57910117 485S+orT+
S+
Figure 5.1
Note: please disconnect the two wires in using display before using it. Then connect with the
Figure 5.2
Part 6
Compatible card for Module A & Module D(57910122)
The system is compatible with Encoder of other suppliers by means of compatible
card (57910122).
When Module A & D landing indicators work with Encoder of other suppliers,
“interface” in both English and Chinese will show. Then insert it. The communication
will be ok.
If communication wires of S+ & S- are not connected correctly, “signal” both in
English & Chinese will show. This information is for reminding installation people
“S+/S-” signal wire connection error. Please connect and try it again, then the
communication will be ok.