Rebuilding Manual
OK HeliCap2 23 Speed
3093009-0100
CAP30 Speed
TechPub_2614345_0110 - RM_3093011_0102fro.fm
WARNING
Read and follow all safety precaution instructions throughout this
manual and on safety signs attached to this equipment.
Failure to follow all safety precaution instructions could result in death or
serious injury.
The rebuilding must only be performed by personnel mandated by Tetra Pak.
and all Tetra Pak products are trademarks belonging to the Tetra Pak Group.
The content of this manual is in accordance with the design and construction of the machine or
equipment at the time of publishing. Tetra Pak reserves the right to introduce design modifications
without prior notice.
The English language version of this document contains the original instructions. All other language
versions are translations of the original instructions.
This document was produced by:
Tetra Pak Packaging Solutions
Via Delfini 1
41123 Modena
Italy
Additional copies can be ordered from Tetra Pak. When ordering additional copies, always provide the
document number.
Doc. No. RM-3093011-0102
Issue 2012-08
1 Introduction
2 Rebuilding Information
3 Rebuilding Instructions
RM
Rebuilding Manual
4 Enclosed
Documentation
OK HeliCap2 23 Speed
3093009-0100
TechPub_2614345_0110 - RM_3093011_0102fro.fm
Issue 2012-08
CAP30/Speed 662850-0200 Valid for the following volumes, Package Types and
Caps:
TechPub_2614345_0110 - RM_3093011_0102fro.fm
UK 3117855-0100 UK Mach. Adapt. for HeliCap2 23 Speed
MKC 3132890-0100 MKC Hardware&Software Upgrade Jan11
1 Introduction
TechPub_2614345_0110 - RM_3093011_0102intro.fm
TechPub_2614345_0110 - RM_3093011_0102intro.fm
Personnel Requirement . . . . . . . . . . . . . . . . . . . 1 - 5
Reference Documents. . . . . . . . . . . . . . . . . . . . . 1 - 9
Manufacturer . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 - 11
Support and Feedback . . . . . . . . . . . . . . . . . . . . 1 - 11
TechPub_2614345_0110 - RM_3093011_0102intro.fm
This page intentionally left blank
Personnel Requirement
The sentences below are translations of the text “The rebuilding must only be
performed by personnel mandated by Tetra Pak” located on the front page of
this manual.
BG
Реконструкцията трябва да се извършва само от персонал,
упълномощен от Tetra Pak.
CS
Rekonstrukce musí být prováděna pouze pracovníky pověřenými firmou
Tetra Pak.
DA
Ombygningen må kun udføres af personale bemyndiget af Tetra Pak.
NL
Het reviseren mag uitsluitend door Tetra Pak erkend personeel worden
uitgevoerd.
ET
Ümberehitust tohivad teostada ainult Tetra Paki poolt volitatud töötajad.
TechPub_2614345_0110 - RM_3093011_0102intro.fm
FI
Muunnostyön saa tehdä vain valtuutettu Tetra Pak -asentaja.
FR
La conversion ne doit être effectuée que par du personnel agréé par
Tetra Pak.
DE
Die Wiedererrichtung darf nur von Personal ausgeführt werden, dass von
Tetra Pak beauftragt wurde.
EL
Η ανακατασκευή πρέπει να πραγματοποιείται μόνον από άτομα που είναι
εξουσιοδοτημένα από την Tetra Pak.
HU
A felújítást kizárólag a Tetra Pak által megbízott személyzet végezheti.
IT
La modifica deve essere effettuata solo da personale autorizzato da
Tetra Pak.
LV
Pārbūvi jāveic Tetra Pak pilnvarotam personālam.
LT
Atstatymą gali atlikti tik Tetra Pak paskirtas personalas.
PL
Przebudowę może wykonać tylko personel upoważniony przez Tetra Pak.
(Cont'd)
(Cont'd)
PT
A remodelação só deve ser feita por pessoal mandado pela Tetra Pak.
RO
Reconstrucţia trebuie realizată numai de către personal mandatat de
Tetra Pak.
SL
Predelavo lahko izvede le osebje, ki je v Tetra Pak-u odgovorno za
vzdrževanje.
SK
Prestavba musí byť vykonávaná iba pracovníkmi poverenými firmou
Tetra Pak.
ES
Solamente personal con mandato de Tetra Pak debe llevar a cabo la
reconstrucción.
SV
Ombyggnaden får endast utföras av personal som bemyndigats av Tetra Pak.
IS
TechPub_2614345_0110 - RM_3093011_0102intro.fm
Endursmíð má aðeins vera í höndum starfsmanna sem Tetra Pak hefur
viðurkennt.
NO (Bokmål)
Ombyggingen skal kun utføres av personer som er oppnevnt av Tetra Pak.
NO (Nynorsk)
Ombyggingen skal kun utføres av personer som er oppnevnt av Tetra Pak.
max Maximum
MKC Mandatory Kit Corrective
MKS Mandatory Kit Human and
Product Safety
MM Maintenance Manual
OK Optional Kit
OE Optional Equipment
OM Operation Manual
PE Polyethylene
PM Packaging Material
PT PullTab
RH Right Hand
RK Rebuilding Kit
RM Rebuilding Manual
S Slim (package shape)
SA Strip Applicator
SPC Spare Parts Catalogue
Sq Square (package shape)
TBA Tetra Brik Aseptic
TMCC Tetra Pak Multi-purpose
Compact Controller
TPOP Tetra Pak Operator Panel
TS Transversal Sealing
UK Upgrade Kit
UP Update Pages
Safety Precautions
Before starting any work on the machine, it is compulsory to read the Safety
Precautions chapter in any of the existing manuals of the machine.
TechPub_2614345_0110 - RM_3093011_0102intro.fm
which, if not avoided, may result in minor or moderate
CAUTION injury. It may also be used to alert against unsafe
practices.
Reference Documents
• UP-3260217-0101
TechPub_2614345_0110 - RM_3093011_0102intro.fm
TechPub_2614345_0110 - RM_3093011_0102intro.fm
• The Rebuilding Instructions chapter provides the instructions for
installing the rebuilding kit and updating the machine manuals.
• The Enclosed Documentation chapter contains individual documents
needed during and after the installation of the rebuilding kit. Instructions
for these documents are described in the Rebuilding Instructions chapter.
After the rebuilding has been completed, recycle the Rebuilding Manual
according to local practices and regulations. If there is an UP associated with
the Rebuilding Manual containing update pages, recycle the UP according to
local practices and regulations after updating the machine manuals.
Manufacturer
This Tetra Pak rebuilding kit has been manufactured by:
Tetra Pak Packaging Solutions
Via Delfini 1
41123 Modena
Italy
TechPub_2614345_0110 - RM_3093011_0102intro.fm
This page intentionally left blank
TechPub_2614345_0110 - 01_RM3093011_01en.fm
TechPub_2614345_0110 - 01_RM3093011_01en.fm
This page intentionally left blank
(Cont'd)
(Cont'd)
Hotmelt Applicator
• Nozzle (1)
TechPub_2614345_0110 - 01_RM3093011_01en.fm
1
1 1 Nozzle
(Cont'd)
(Cont'd)
Cap Sorter
• Sections (1)
• Brush holder (2)
• Shute (3)
1
TechPub_2614345_0110 - 01_RM3093011_01en.fm
1 Section
2 Brush holder
3 Shute
(Cont'd)
(Cont'd)
Machine Body
• Heating chamber (1)
• Flange seal (2)
TechPub_2614345_0110 - 01_RM3093011_01en.fm
1 Heating chamber
2 Flange seal
(Cont'd)
(Cont'd)
Cap Holder
• Cap holder (1)
1 Cap holder
(Cont'd)
TechPub_2614345_0110 - 01_RM3093011_01en.fm
(Cont'd)
Cap Sequencer
• Guide (1)
• Guide rail (2)
• Clamp (3)
TechPub_2614345_0110 - 01_RM3093011_01en.fm
3
1 Guide
2 Guide rail
3 Clamp
(Cont'd)
(Cont'd)
Cap Conveyor
• Guide rail (1)
1
TechPub_2614345_0110 - 01_RM3093011_01en.fm
1 Guide rail
TechPub_2614345_0110 - 01_RM3093011_01en.fm
2.3 Preparations
2.3.1 Site Preparation
Before starting any rebuilding work on the machine:
• Make sure that the machine is available and that the rebuilding work can
be completed without interruption.
• Establish an adequate safe working area around the machine. Make sure
that no items stand in the installation area.
If any part of the rebuilding kit is not present, create a claim notification in
SAP/R3 using transaction code IW51 (Create Service Notification).
If any damage to the crate contents has occurred during transportation,
create a discrepancy notification in SAP/R3 using the same transaction code,
TechPub_2614345_0110 - 01_RM3093011_01en.fm
IW51.
Take photographs of the damage and enclose the photographs with the
discrepancy notification.
Tool/Equipment Notes
Setting tool Lens TP No. 90459-4931
valid for TBA 1000 S HeliCap2 23
Setting tool Template TP No. 3047353-0000
valid for TBA 1000 S HeliCap2 23
Setting tool TP No. 3077734-0000
Setting tool (Digital) Caliper
TechPub_2614345_0110 - 01_RM3093011_01en.fm
This page intentionally left blank
TechPub_2614345_0110 - 02_RM3093011_01en.fm
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3.4.3 Declaration for Machinery Part(s) . . . . . . . . . . . 3 - 93
3.4.4 Obsolete and Recommended Spare Parts . . . . 3 - 93
WARNING
Risk of burns.
Nearby components may be hot.
a) Remove the screw (1), the washer (2) and the arm (3), collecting the
sleeve (4) and the spring (5).
b) Change the arm (3) and spring (5) the bushings (6).
c) Assemble in the reverse order with the new parts.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
6 1 Screw
2 Washer
2
3 Arm
5 4 6
4 Sleeve
5 Spring
6 Bushing
Disassembly
a) Step the machine to PREHEATING.
b) Set the temperature of the hotmelt unit at 90÷100°C, see the MM 6.5.1-5
Set Tank, Hose and Gun Temperatures on page 6-46.
c) Remove the screws (1) and the cover (2).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
2 1
1 Screw
2 Cover
(Cont'd)
(Cont'd)
d) Disconnect the hose (3) from the pump (4).
e) Loosen and remove the screw (5).
f) Loosen the screws (6) and remove the cylinder head (7).
g) Remove the cylinder (8).
6
TechPub_2614345_0110 - 02_RM3093011_01en.fm
4
8
3 Hose
4 Pump
3 5 Screw
6 Screw
7 Cylinder head
8 Cylinder
(Cont'd)
(Cont'd)
Pump Disassembly
a) Loosen the nut (1) and remove the piston cups (2) the piston cup
washers (3) and the piston seal washer (4).
b) Change the o-rings (5) and (6).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
2
6 1 Nut
2 Piston cup
3 Piston cup washer
4 Piston seal washer
5 O-ring
6 O-ring
(Cont'd)
(Cont'd)
Piston Assembly
a) Install the cylinder (1).
b) On the workbench, put in shape the new piston cups (2) and (3) into the
6:1 ratio piston cup sleeve (4) by means of the new piston cup
washers (5) and (6).
Note! Insert the piston cup (2) and the piston cup washer (5) from the
bottom and the piston cup (3) and the piston cup washer (6) from the top of
the piston cup sleeve (4).
3
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Cylinder
2 Piston cup
1 3 Piston cup
4 Sleeve
5 Piston cup washer
6 Piston cup washer
(Cont'd)
(Cont'd)
Pump Assembly
a) Install the o-rings (1) and (2) onto the piston cup sleeve (3).
b) Install the piston cups (4) and (5), the piston seal washer (6) and the
piston cup washers (7) and (8) into the 6:1 ratio piston cup sleeve (3).
c) Install the 6:1 ratio piston cup sleeve (3) and tighten the nut (9).
d) Install the cylinder head (10) and tighten the screws (11).
e) Install the o-rings (12) and (13).
11
10
12
9
8
1
TechPub_2614345_0110 - 02_RM3093011_01en.fm
5
2
6
3 1 O-ring
2 O-ring
3 Piston cup sleeve
4 Piston cup
4
5 Piston cup
6 Piston seal washer
7 7 Piston cup washer
8 Piston cup washer
9 Nut
13 10 Cylinder head
11 Screw
12 O-ring
13 O-ring
Assembly Cover
a) Install the cover (1) and tighten the screws (2).
b) Attach the sign (3) on the cover.
1 2 3
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Cover
2 Screw
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
2
1 Lever
2 Cover
3 Nozzle
3
3
WARNING
Risk of burns
These parts and others close by may be hot.
a) Remove the cover, see the MM 4.3.1-2 Hotmelt Gun - Remove and
Install Cover.
b) Release the four screws (1) and add spacers (2) until within 2 mm of the
distance A. For distance A see, 13.1-1 Pressures/Adhesive/Temperature/
Nozzle.
c) Peel off the layers from the shim (3) until distance A is obtained between
the nozzle (4) and the cap (5).
d) Tighten the screws (1).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
2
4
5
A
1 Screw
2 Spacer
3 Shim
4 Nozzle
5 Cap
(Cont'd)
(Cont'd)
Hotmelt Gun Applicator Setting
Note! Valid for machines from T Order:T75722/00011.
Note! The hotmelt equipment must be at operating temperature. Check the
MM for the temperature of different glues.
Note! Do not let adhesive go on the machine parts.
WARNING
Risk of burns.
Hot adhesive. Wear safety glasses, protective gloves and other protective
clothing to avoid injuries from hot adhesive.
a) Remove the cap sequencer guides see, 8.1.1-1 Guide - Removal and
Installation.
b) Remove the cover, see the MM 4.3.1-2 Hotmelt Gun - Remove and
Install Cover.
CAUTION
The nozzles are delicate.
Handle the nozzles (1) with care to avoid any damage to their top (2).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
c) Loosen and remove the nozzles (1).
1
1
1 Nozzle
2 Top
(Cont'd)
(Cont'd)
d) Check the guns (3) are touching their two reference pins (4).
e) Install the template (5) onto the inner cap guide mounting.
3 5
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3 Gun
4 Pin
5 Template
(Cont'd)
(Cont'd)
f) Using the template set the guns Z alignment to the distance A.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
A
(Cont'd)
(Cont'd)
g) If the distance is not correct adjust it by loosening the two fixing
screws (6) and adjusting the two Z regulating screws (7).
h) Tighten the screws (6) when the correct distance is achieved.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
7 6 7
6 Screw
7 Screw
(Cont'd)
(Cont'd)
i) Loosen the two fixing screws (8) just a little in the outer guns only.
j) Move the guns (3) into the “Y setting slots” (9) of the template (5).
k) Let the loosened guns adjust them selves inside the template slot.
l) Tighten the fixing screws (8) of the guns.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3 3
5 8
9
3 Gun
5 Template
8 Screw
9 Slots
(Cont'd)
(Cont'd)
m) Loosen the screws (10)
n) Move the guns inside the templates “X setting slots”.
o) Let the gun module adjust itself in reference to the template (5).
p) Tighten the four screws (10).
Note! Check that the gun group can move freely inside the template (5).
q) Remove the template (5).
10 10
TechPub_2614345_0110 - 02_RM3093011_01en.fm
10
5 Template
10 Screw
(Cont'd)
(Cont'd)
Note! Do Not adjust the centre gun (11) when fine setting.
r) To move the left hand gun:
– to the left, release the lock nuts (12) and turn the screws (13) until
they touch the gun, then lock the nut (12). Loosen the screws (8) and
place your feeler gauge with the distance required between the
screw (13) and the gun. Tighten the screws (8) making sure that the
gun is touching the feeler gauge.
– to the right, loosen the screws (13) and place your feeler gauge with
the distance required between the screw (13) and the gun. Move the
screw (13) until it touches the feeler gauge and lock the nut (12).
Release the screw (8) and move the gun to the screw (13), tighten the
screws (8).
s) To move the right hand gun:
– to the left, loosen the screws (13) and place your feeler gauge with the
distance required between the screw (13) and the gun, then lock the
nut (12). Release the screws (8) and move the gun until it touches the
screw (13).
– to the right, loosen the screws (8) and place your feeler gauge with the
TechPub_2614345_0110 - 02_RM3093011_01en.fm
distance required between the screw (13) and the gun. Tighten the
screws (8) making sure that the gun is touching the feeler gauge.
Note! .Move the screws (13) away from the gun before going to production.
.
11
8 8
8 Screw
12 13 12 11 Gun
12 Nut
13 Screw
(Cont'd)
(Cont'd)
t) Install the three nozzles (1).
u) Install the cap guides see, 8.1.1-1 Guide - Removal and Installation.
v) Install the cover, see the MM 4.3.1-2 Hotmelt Gun - Remove and Install
Cover.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Nozzle
WARNING
The cap sorter is high.
These components are in a high position, be sure to use suitable equipment
to reach them.
a) Remove the protection (1).
b) Loosen the nut (2) to manually rotate the cap sorter.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
2
1 Protection
2 Nut
(Cont'd)
(Cont'd)
c) Remove the eight screws (3) and the four sections (4).
Note! Rotate the feeder (5) to access to the sections (4).
d) Assemble in the reverse order with the new sections (4).
4
3
5
4
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3 Screw
4 Section
5 Feeder
(Cont'd)
(Cont'd)
e) Tighten the nut (2).
f) Install the protection (1).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
2
1
1 Protection
2 Nut
3
1
2
1 Screw
2 Discharger
3 Pin
(Cont'd)
(Cont'd)
Change Guide
a) Remove the screws (1) and the guide (2).
b) Assemble in the reverse order with the new guide (2).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
2 1 1 Screw
2 Guide
(Cont'd)
(Cont'd)
Cap Sorter Discharger Installation
a) Loosen without remove the screws (1) and (2).
b) Put in position the discharger (3).
c) Push downward the discharger (3) and tighten the screws (4).
d) Tighten the screws (1) and (2).
1
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3 4
2
2
1 Screw
2 Screw
3 Discharger
4 Screw
(Cont'd)
(Cont'd)
Note! The procedure is correct if the discharger (3) is the closest to the
reference surface (5).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
5
3 Discharger
5 Surface
(Cont'd)
(Cont'd)
Cap Sorter Discharger Lock
a) Lift the locking handles (1) and (2) up to lock the discharger (3) in the
correct position.
Note! Check that the locking handles keep pushed the discharger (3) in the
correct position. If the discharger (3) changes its position after the
handles (1) and (2) have been locked, proceed with the instruction b).
1
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Handle
2 Handle
3 Discharger
(Cont'd)
(Cont'd)
b) For each of the locking handles, remove the cap (4), if present.
c) Tighten the screw (5) (one rotation can be enough) to increase the
distance A.
d) Adjust the position of the screw (6).
e) Repeat from point a) on page 3-29.
5 4
A 6
4 Cap
5 Screw
TechPub_2614345_0110 - 02_RM3093011_01en.fm
6 Screw
1
1
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Nut
2 Air injector
(Cont'd)
3 - 32 (96)
(Cont'd)
Hole ø5.5 mm
Quote “H”
Pneumatic Panel
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3 Rebuilding Instructions 3.1 Mechanical Installation
(Cont'd)
c) In the installation of the air injector 1 (3), if the distance H is less than 53
mm install the air injector 1 (3) in the lower hole (4) and put a plug in the
upper hole (5).
d) In the installation of the air injector 1 (3), if the distance H is more or
equal than 53 mm install the air injector in the higher hole (4) and put a
plug in the lower hole (3).
e) In the installation of the air injector 4 (6), if the distance H is less than 57
mm install the air injector 1 (3) in the lower hole (4) and put a plug in the
upper hole (5).
f) In the installation of the air injector 4 (6), if the distance H is more or
equal than 57 mm install the air injector in the higher hole (4) and put a
plug in the lower hole (3).
Note! The air injectors 4 (5) have to be installed in the higher hole (4).
6 3
2
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
1
5
4
1 Nut
2 Air injector
3 Lower hole
4 Upper hole
5 Air injector 1
6 Air injector 4
(Cont'd)
(Cont'd)
Check the Air Injectors
Note! Check all the air injectors.
a) Check the drawing on page 3-32 if the air injector (1) has to be mounted
straight, upwards or downwards.
b) Check that the hole (2) is angled and aligned with the air injector (1).
c) If the hole (2) is not aligned with the air injector (1), adjust the
inclination of the hole (2) by means of a drilling machine (3).
2 2
1
1
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3 2
1 Air injector
2 Hole
3 Drilling machine
(Cont'd)
(Cont'd)
Install the Air Injectors
a) Install the air injector (1) and tighten the nut (2).
Note! Check that there are no gaps between the air injector (1) and the
frame (3).
2 2
1
1
3 3
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
1
3
3
1 Air injector
2 Nut
3 Frame
(Cont'd)
(Cont'd)
Perform Air Connections
a) Install an L-connection (1) or a plug (2) according to the modification
drawings, see the drawing on page 3-32.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 2 1 Plug
2 L-Connection
(Cont'd)
(Cont'd)
b) Check that the air injectors are connected to the correct pressure
regulator, see the drawing on page 3-32.
c) Check that the pressure regulator (1) is set to 2 bars, the pressure
regulator (2) is set to 4 bars, the pressure regulator (3) is set to 1-2 bars,
see the drawing on page 3-32.
d) At the start-up of the machine, check that the air coming from the air
injectors allows the passage of the caps.
4
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
2 5
3
7
6
1 Pressure regulator
2 Pressure regulator
3 Pressure regulator
4 Nozzle 50WI65
5 Nozzle 50WI67
6 Nozzle 50WI68
7 Nozzle 50WI66
8 Nozzle 50WI64x
9 Nozzle 50WI64
a) Install the new air injector (1) using the screw (2).
b) Connect the air pipe (3) to the air injector (1).
2
1
3
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Injector
2 Screw
3 Air Pipe
3 4 2 1
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Cam
2 Cam
3 Cam
4 Screw
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
1 PRODUCTION CONTROL
2 Cap Sorter Icon
(Cont'd)
c) Select any of the buttons (3), (4), (5), (6) or (7) to adjust the value.
d) Touch the OK button (8) twice to confirm the setting.
e) When all the settings are correct touch the recipe button (9) and save, see
3.3.2-2 Touch Screen - Saving Recipe Settings on page 3-92.
Setting Value
Slim Cap Stream Cap HeliCap2 23
Time to Start Load TBD 0.25Sec 0.2Sec
Time to Stop Load TBD 0.45Sec 0.5Sec
Time to Start Elevator TBD 0.55Sec 0.2Sec
Time to Stop Elevator TBD 0.55Sec 0.5Sec
5
3
6
7
4
TechPub_2614345_0110 - 02_RM3093011_01en.fm
8
9
X Position
a) Loosen the four screws (1) to free the plate (2).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Screw
2 Plate
(Cont'd)
(Cont'd)
b) Measure the distance A between the beam (3) and the cap conveyor (4).
c) Make the distance B between the beam (5) and the cap conveyor (4) the
same as the distance A, by means of the screws (6).
B 5
4
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3
A
3 Beam
4 Cap conveyor
5 Beam
6 Screw
a) Release the screw (1) and adjust the bracket (2) to set the distance A.
b) Release the screw (3) and adjust the bracket (2) until the distance B is
reached between the lever (4) and the disc (5), tighten the screws (1)
and (3).
c) Adjust the sensor (6) until the distance C is reached between the
lever (4) and the sensor (6).
Note! The distances A, B and C are reported in the drawings on page 3-32.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
6
4
5
1 Screw
3
2 Bracket
2 3 Screw
4 Lever
5 Disc
1 B 6 Sensor
2
TechPub_2614345_0110 - 02_RM3093011_01en.fm
D
C
A
E
B
1
1 Screw
2 Sensor
WARNING
Risk of burns.
The preheating equipment is very hot. Failure to observe this information
could result in severe burns.
a) Loosen the screws (1) and remove the heat guard (2).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
1 Screw
2 Heat guard
(Cont'd)
(Cont'd)
a) Loosen the screws (3) and remove the flange seal (4) and the heating
chamber (5).
b) Assemble in the reverse order with the new parts.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3 Screw
4 Flange seal
5 Heating chamber
a) Loosen the screws (4) and remove the cam module (3)
b) Loosen the screws (1) and remove the cap holder (2).
c) Install the new cap holder (2) and tighten the screws (1).
d) Install the cam module (3) and tighten the screws (4).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3
1 Screw
2 Cap holder
4 3 Cam module
4 Screw
2
3
4
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
1 Screw
2 Guide
1 3 Screw
4 Guide rail
5 Screw
6 Clamp
(Cont'd)
(Cont'd)
Set Roof
a) Remove the screws (1) and the bracket assembly (2).
b) Remove the screws (3) and the roof (4).
c) Insert shims (5) until the distance A is reached.
Note! The bracket assembly (2) is cap dependent, see latest SPC.
Cap Distance A
Slim Cap 1000 12.8 mm +0 / -0.2 mm
Stream Cap 1000 18 mm +0 / -0.2 mm
HeliCap2 23 16 mm +0 / -0.1 mm
HeliCap 27 18.4 mm +0 / -0.1 mm
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3
2
1
1 Screw
2 Bracket assembly
3 Screw
4 Roof
5 5 Shim
a) Adjust the nuts (1) to set the distance A between the guides (2) making
sure that the distance A is equal at both ends.
Note! The steering guides (2) are cap dependent, see latest SPC.
A
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Nut
2 Guide
a) Set the distance A on the sensor (1) by adjusting the nuts (2).
Note! When the fingers (3) are open the LED on the sensor (1) should
be on.
A = 1.0 mm
TechPub_2614345_0110 - 02_RM3093011_01en.fm
A
1
2
1 Sensor
2 Nut
3 Finger
(Cont'd)
(Cont'd)
b) Set the distance B between the fingers (3) by adjusting the distance C
using the nut (4) and the damper (5).
Note! Turning the damper (5) counter clockwise will increase the gap.
Note! If the stop fingers (6) trap the next cap (7) repeat step b) until
position (8) is achieved.
.
B 6
3
6
TechPub_2614345_0110 - 02_RM3093011_01en.fm
7 8
5 4
3 Finger
4 Nut
5 Damper
6 Stop finger
7 Next cap
8 Position (8)
(Cont'd)
(Cont'd)
c) Set the tension of the spring (9) by adjusting the nuts (10) until the
distance D is obtained.
10 9
TechPub_2614345_0110 - 02_RM3093011_01en.fm
D = 20 mm D
9 Spring
10 Nut
1
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Latch
2 Guide rail
(Cont'd)
(Cont'd)
Install new Guide Rail
a) Install the new guide rail (1).
b) Close the latches (2).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
1 Guide rail
2 Latch
Set Y Cam
Note! Valid only for HeliCap2 23.
a) Inch the machine to 330 degrees.
b) Check that the distance A is correct between the pushdown (1) in the cap
holder and the pushdowns in the end stroke position (2).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 2 2
A
1 Pushdown
2 End stroke pushdown
(Cont'd)
(Cont'd)
c) Place a straight edge (3) under the pushdowns (2), release the screws (4)
and move the cam (5) until the distance A is obtained. Tighten the
screws (4).
Note! Removing the cap holder (6) will help during this setting.
6 5 2 3 2
TechPub_2614345_0110 - 02_RM3093011_01en.fm
A = 4 mm
A
2 Pushdown
3 Straight edge
4 Screw
5 Cam
6 Cap holder
Set Z Cam
Machine Status Mains Power OFF
Air OFF
SPC Reference 662802-0100
Note! This adjustment is for the pushdown fingers to the applicator only.
CAUTION
Application pressure
Do not adjust the pushdown pressure here, see the MM 6.1.1-1 Package
Conveying - Set Height.
(Cont'd)
TechPub_2614345_0110 - 02_RM3093011_01en.fm
(Cont'd)
a) Inch the machine to 330 degrees and check the distance A between the
pushdown finger (1) and the bottom of the cap holder claw (2).
b) Release the screws (3) and turn the screws (4) to raise or lower the
height of the push down (5).
Note! Keep the distance B equal at both ends of the pushdown.
5
1
2
4
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3
B
1 Pushdown finger
2 Cap holder claw
3 Screw
4 Screw
5 Pushdown
Set X Cam
Machine Status Mains Power OFF
Air OFF
SPC Reference 662802-0100
1
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Screw
(Cont'd)
(Cont'd)
b) Turn the two screws (2) to move the pushdown (3) and set the distance A
so that the pushdown is centred on the cap. Tighten the screws (1).
c) Check that the distance B is equal between the cam (4) and the belt (5) at
both ends.
A B
2
TechPub_2614345_0110 - 02_RM3093011_01en.fm
4
1 Screw
2 Screw
3 Pushdown
4 Cam
5 Belt
Set Zero
Machine Status Mains Power OFF
Air OFF
SPC Reference 662802-0100
3
2
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Straight edge
2 Pushdown holder
3 Zero tool
(Cont'd)
(Cont'd)
b) Turn the main power on.
c) Touch the SYSTEM SETUP button (4) and login see, 3.3.2-1 Touch
Screen - Login As Service Technician on page 3-88.
d) Touch the MAINTENANCE button (5).
e) Touch the APPLICATOR UNIT button (6).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
5 4
(Cont'd)
(Cont'd)
f) Touch the ZERO button (7)
g) Touch the ON button (8).
h) Touch the OK button (9) for three seconds. The background of the ON
button (8) should go green.
i) Touch the EXIT button (10).
10
8
TechPub_2614345_0110 - 02_RM3093011_01en.fm
7 ZERO button
8 ON button
9 OK button
10 EXIT button
3
1
TechPub_2614345_0110 - 02_RM3093011_01en.fm
A
1 Screw
2 Screw
3 Picking cam
(Cont'd)
(Cont'd)
Fine Setting
a) Inch the machine slowly around so that caps are collected by the cap
holders.
b) Make sure that the cap is not held by more than the distance B. This will
make sure that the cap holder lever does not touch the cap sequencer.
c) If the distance B is incorrect, repeat the Coarse Setting procedure and
steps a) and b) of this procedure.
StreamCap SlimCap HeliCap2 23 HeliCap27
Dimension B Dimension B Dimension B Dimension B
4.5 mm 5.5 mm 5. mm 6.5 mm
B
TechPub_2614345_0110 - 02_RM3093011_01en.fm
(Cont'd)
(Cont'd)
Gripper Cam - Z Adjustment
Note! Before setting the cams (1), set the cap holder group see 7.3.1-3
Guide Bracket - Set X Position (No Positioning Device Only).
a) Release the screws (2).
b) Using the screw (3), adjust the gripper cam (1) to change the distance A.
c) Tighten the screws (2).
d) Check that the distance A is equal at each end of the cam (1).
Note! Check that the grippers (4) are holding the cap before the cap
completely leaves the guides (5).
2 A 3
TechPub_2614345_0110 - 02_RM3093011_01en.fm
4
1 Cam
2 Screw
3 Screw
A = 4.5 mm
4 Gripper
5 Guide
Release Cam
Note! Before setting the cams, set the cap holder group see 7.2.1-3 Cap
Holder - Set Y Position.
a) Release the screws (1) and then use the screw (2) to adjust the release
cam (3) to set the distance A making sure that the cap is still being
gripped.
b) Tighten the screws (1).
Note! Make sure that the distance A is equal at both ends of the cam (3).
A = 9 mm
TechPub_2614345_0110 - 02_RM3093011_01en.fm
A 2
3
1
1 Screw
2 Screw
3 Release cam
(Cont'd)
(Cont'd)
Application Cam
a) Inch the machine to 360 degrees.
b) Release the screws (1) and then use the screw (2) to adjust the position
of the applicator cam (3) until the stroke at the spring is the distance A.
c) Tighten the screws (1).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
A
A = 19.5 mm ±0.5
1 Screw
2 Screw
3 Applicator cam
(Cont'd)
Release and Application Cam - with Vision System
a) The release and applicator cam (2) is moved into position by the
motor (3) and the vision system, see 12 Optional Equipment.
b) Position the pin (4) in the zero slot (5).
c) Close all doors and guards.
3
2
TechPub_2614345_0110 - 02_RM3093011_01en.fm
4 5
1 Guide cams
2 Release and applicator cam
3 Motor
4 Pin
5 Zero slot
(Cont'd)
(Cont'd)
d) Touch the MAINTENANCE button (6).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
6 MAINTENANCE button
(Cont'd)
(Cont'd)
e) Touch the VISION SYSTEM button (7).
f) Touch the ZERO button (8).
g) Touch the ON button (9).
h) Touch the OK button (10) for three seconds. The background of the ON
button (9) should go green.
i) Touch the EXIT button (11).
7
TechPub_2614345_0110 - 02_RM3093011_01en.fm
11
10
7 VISION SYSTEM button
9 8 ZERO button
9 ON button
10 OK button
11 EXIT button
(Cont'd)
(Cont'd)
Note! Set the machine to zero degrees.
j) Rotate the cam (12) checking that the roller (13) stays in contact with the
cam (2) during the total rotation on the cam (12).
2 13
TechPub_2614345_0110 - 02_RM3093011_01en.fm
12
2 Cam
12 Cam
13 Roller
(Cont'd)
(Cont'd)
Set X Position
a) Inch the machine to 15 degrees and centre the cap (1) between the guides
(2) on the cap sequencer.
b) Loosen but not remove the screw (3).
c) Move the cap carrier (4) by means of the screw (5) until that the cap (1)
is centred between the guides (2).
d) Repeat for all cap carriers.
2 2
= =
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Cap
2 Guide
5 3 Screw
3 4 Cap carrier
5 Screw
The distance A, between the too long package queue sensor (1) and the DE
unit (2), must not exceed 15 m for Family packs and 20 m for Portion packs.
Distance B. This is the distance required to empty the cap applicator. The
distance is package dependent, see the table on the next page.
1 2 3 4 5 6 7 8 9 12 11
10
TechPub_2614345_0110 - 02_RM3093011_01en.fm
A B
a) Perform a package sample and collect six consecutive packages from the
conveyor after the machine, see the MM.
b) Open the caps (1) and empty the packages (2).
c) Cut the packages (2) and remove the grey area shown in the picture.
d) Number the samples from 1 to 12 (3) by means of a pen.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
1
1 Cap
2 Package
3 Number
(Cont'd)
(Cont'd)
e) Remove the aluminium layer (4) from the bottom of the cap (5).
5
TechPub_2614345_0110 - 02_RM3093011_01en.fm
4 Aluminium layer
5 Bottom of the cap
(Cont'd)
(Cont'd)
f) Insert the bottom of the cap (5) into the template (6) and check that it
doesn’t rotate.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
(Cont'd)
(Cont'd)
Note! Use a (digital) caliper to check the position of the cap on package.
g) Measure the maximum distance Y between theY-reference (7) of the
template and the packaging material (8).
h) Measure the maximum distance X between the X-reference (9) of the
template and the packaging material (8).
Note! Be sure that the measure is taken between the template and the
board of the hole: the caliper shouldn’t touch the cap.
i) Put the measures in the tables of pages 3-82 and 3-82.
j) Repeat from g) to i) for all the 12 packages.
Y 9
X
TechPub_2614345_0110 - 02_RM3093011_01en.fm
7 Y-reference
8 Packaging material
9 X-reference
(Cont'd)
(Cont'd)
Position of the Cap on Package Table
a) Repeat from a) on page 3-78 to i) on page 3-81 other times.
b) Calculate the average values of columns X and Y between the 3 values
collected for every cap holder.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3(first sample)
3(second sample)
3(third sample)
Average 3
(Cont'd)
(Cont'd)
(Cont'd)
c) Subtract ‘5’ to every average and put these values in the following table:
TechPub_2614345_0110 - 02_RM3093011_01en.fm
e) Check the offsets:
Alignment
WARNING
Risk of burns
These parts and others close by may be hot.
Note! This procedure checks the alignment of the three nozzles relative to
the centre line of the cap sequencer.
This alignment can be checked using a test facility incorporated in the TPOP
program. To check the glue application proceed as follows.
a) Make sure that the machine is at PREPARATION.
b) At the control panel, touch the PRODUCTION CONTROL button (1).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1
1 PRODUCTION CONTROL button
2 SERVICE button
(Cont'd)
(Cont'd)
d) In the SERVICE PARTS (3), touch the HOTMELT PATTERN TEST
button (4).
e) Touch the ON button (5) to active the function and press the STEP UP
button (6).
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3 SERVICE PARTS
4 HOTMELT PATTERN TEST button
5 ON button
6 STEP UP button
(Cont'd)
(Cont'd)
f) Perform a pattern test, see Alignment on page 3-85.
g) Use a calibration lens (1) TP90459-4931 to check that the distance from
the cap edge to the glue bead is centred in Y direction. In example: if the
distance Y1= 2 mm and the distance Y2=3 mm change the Y offset of
+0.5mm.
h) Repeat for the X direction.
Note! If the glue is not well positioned, set it correctly according to the MM,
4.3.1-9 Hotmelt Gun - Check.
y2 y1
x
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 Calibration lens
3.3.2 Appendix
3.3.2-1 Touch Screen - Login As Service Technician
Machine Status Mains Power ON
SPC Reference 2779070-0100
1 2 3 4 5
TechPub_2614345_0110 - 02_RM3093011_01en.fm
1 System setup button
2 User management button
3 Log off button
4 Log on button
5 Login window
(Cont'd)
(Cont'd)
d) Touch the USER button (6) to display the keyboard (7).
e) Use the keyboard (7) to type your user name, then touch the ENTER
button (8).
7
TechPub_2614345_0110 - 02_RM3093011_01en.fm
6 User button
7 Keyboard
8 Enter button
(Cont'd)
(Cont'd)
TechPub_2614345_0110 - 02_RM3093011_01en.fm
- partial access to the
configuration window
Operator - - Access to:
(default user - production control settings and
with no log on) functions
- alarm management
- basic recipe management
(Cont'd)
(Cont'd)
f) Touch the PASSWORD button (9) to display the keyboard (7).
g) Use the keyboard (7) to type your password, then touch the ENTER
button (8).
h) Touch the ENTER button (10) to confirm the data entry.
The user is now logged on to the TPOP with the corresponding level of
access.
10
9
TechPub_2614345_0110 - 02_RM3093011_01en.fm
7 Keyboard
8 Enter button
9 Password button
10 Enter button
TechPub_2614345_0110 - 02_RM3093011_01en.fm
3 1 4
1 RECIPE button
2 RECIPE NAME
3 SAVE button
4 OK button
TechPub_2614345_0110 - 02_RM3093011_01en.fm
If indicated in the Technical Bulletin, the Operation Manual for the machine
must be replaced with the latest released version which includes the new
instructions related to this rebuilding kit.
If the new manual is available, make sure that old manual is discarded. If the
latest released version of the Operation Manual is not available:
• use the OM pages located in UP-Manual to update the existing OM
• if possible, remove and discard OM pages containing obsolete
procedures. If pages containing obsolete procedures can not be removed,
use a red permanent pen to cross out the procedure and clearly mark the
pages with the words ‘No longer valid’
• inform the person responsible that the latest released version of the
Operation Manual must be ordered for the machine.
TechPub_2614345_0110 - 02_RM3093011_01en.fm
This page intentionally left blank
TechPub_2614345_0110 - ed1_RM3093011_01en.fm
TechPub_2614345_0110 - ed1_RM3093011_01en.fm
This page intentionally left blank
I LIKE MY B BLANK
TechPub_2614345_0110 - ed1_RM3093011_01en.fm
TechPub_2614345_0110 - ed1_RM3093011_01en.fm
This page intentionally left blank
I LIKE MY B BLANK
TechPub_2614345_0108 - ed3_RM3093011_01en.fm
This page intentionally left blank
izjavlja, da je (so) sestavni del (deli) stroja: erklärt hiermit, dass diese Maschinenteile
Varnost sestavnega dela (sestavnih delov) stroja je preskuena pri namenski uporabi z Die Maschinenteile wurden untersucht und im Rahmen einer Risikoanalyse hinsichtlich ihrer
oceno tveganja. vorgesehenen Anwendung als sicher befunden.
Sestavni del (deli) stroja mora(jo) biti vgrajen(i) v stroj/opremo/sistem v skladu s priloenimi Die Maschinenteile sind gemäß beiliegender Anleitungen in Maschinen/Anlagen/komplexe
navodili. Einrichtungen einzubauen.
Modena 01/08/2012 Modena 01/08/2012
Slovenina/Slovenian Deutsch/German
FORM 5297 version 2011-10-27 FORM 5297 version 2011-10-27
erklærer, at følgende maskindele: declara que este (estos) componente(s) de las máquinas:
Det er blevet bekræftet ved hjælp af en risikovurdering, at maskindelene er sikre til den Se ha comprobado la seguridad del (de los) componente(s) de las máquinas en el uso para
tiltænkte anvendelse. el cual está(n) destinado(s) mediante una evaluación de riesgos.
Maskindelene skal inkorporeres i maskinen/udstyret/ El (los) componente(s) de las máquinas deberán integrarse en el conjunto de la instalación
det komplekse anlæg i overensstemmelse med de anvisninger, som følger med. de la máquina/equipo de acuerdo con las instrucciones adjuntas.
Modena 01/08/2012 Modena 01/08/2012
Dansk/Danish Español/Spanish
FORM 5297 version 2011-10-27 FORM 5297 version 2011-10-27
Tetra Pak Tetra Pak
Vakuutus koskien Déclaration concernant
koneiston osia la (les) pièce(s) de machine
Tetra Pak Packaging Solutions S.p.A. Tetra Pak Packaging Solutions S.p.A.
Via Delfini 1 Via Delfini 1
41123 Modena 41123 Modena
Italy Italy
vakuuttaa, että tämän koneen osa(t): déclare que la (les) présente(s) pièce(s) de machine :
Riskin arvioinnissa on varmistettu, että koneiston osa(t) ovat turvallisia, kun niitä käytetään Une évaluation des risques a établi que l'application prévue de la (des) pièce(s) de machine
niiden käyttötarkoituksen mukaisesti. est sûre.
Koneiston osa(t) tulee sisällyttää koneeseen/laitteistoon/laitekokonaisuuteen oheisten La (les) pièce(s) de machine doi(vent) être intégrée(s) à la machine / à l'équipement /
ohjeiden mukaisesti. à l'installation complexe conformément aux instructions jointes.
Modena 01/08/2012 Modena 01/08/2012
# & () () : verklaart dat dit/deze machineonderdeel/machineonderdelen:
() () ( ) () Het machineonderdeel/de machineonderdelen is/zijn in een risicobeoordeling veilig
!" ( ) #$%. bevonden voor de bedoelde toepassing.
() () %%!( $) Het machineonderdeel/de machineonderdelen zal/zullen volgens de bijgaande instructies in
/ &/$ $% #! . de machine/apparatuur/installatie worden ingebouwd.
Modena 01/08/2012 Modena 01/08/2012
erklærer at denne maskindelen / disse maskindelene: declaramos que a(s) peça(s) componente(s) desta máquina:
Etter en risikovurdering er det fastslått at det er trygt å bruke maskindelen(e) i den tiltenkte A(s) peça(s) componente(s) desta máquina foi(ram) considerada(s) segura(s) no que se
anvendelsen. refere à sua aplicação de destino pela avaliação de riscos.
Maskindelen(e) skal monteres i maskinen/utstyret / den komplekse A(s) peça(s) componente(s) desta máquina deverá(ão) ser incorporada(s) no conjunto de
installasjonen i henhold til instruksjonene som følger med. instalação da máquina/equipamento/instalação complexa de acordo com as instruções
Modena 01/08/2012 Modena 01/08/2012
Norsk/Norwegian Português/Portuguese
FORM 5297 version 2011-10-27 FORM 5297 version 2011-10-27
Áhættumat hefur staðfest að vélhlutinn er öruggur fyrir áformuð not. La parte/i della macchina è stata verificata ed è risultata sicura nelle sue applicazioni
Vélhlutinn mun verða felldur inn í vél-/tækjabúnað og vélasamstæður og kerfi samkvæmt previste mediante una valutazione dei rischi.
meðfylgjandi leiðbeiningum. La parte/i della macchina verranno incorporate nella macchina/apparecchiatura/ installazione
complessa conformemente alle istruzioni in dotazione.
Modena 01/08/2012 Modena 01/08/2012
Íslenska/Icelandic Italiano/Italian
FORM 5297 version 2011-10-27 FORM 5297 version 2011-10-27
Tetra Pak Tetra Pak
Deklaration Vyhlásenie
av maskinkomponenter o strojárskom dielci (dielcoch)
Tetra Pak Packaging Solutions S.p.A. Tetra Pak Packaging Solutions S.p.A.
Via Delfini 1 Via Delfini 1
41123 Modena 41123 Modena
Italy Italy
Till följd av lämplig riskanalys har produkten (produkterna) ansetts säkra för avsedd Na základe hodnotenia rizík bolo overené, e strojársky dielec (dielce) sú bezpené
användning. pri jeho pouití na urený úel.
Produkten (produkterna) skall anslutas/monteras till maskinen/utrustningen/anläggningen i Strojársky dielec (dielce) bude zabudovaný do stroja/zariadenia/
enlighet med bifogade anvisningar. komplexnej intalácie v súlade s priloenými pokynmi.
Modena 01/08/2012 Modena 01/08/2012
Svenska/Swedish Slovensky/Slovak
FORM 5297 version 2011-10-27 FORM 5297 version 2011-10-27
Strojní souásti byly na základ; posouzení rizika schváleny jako bezpené pro Masinaosa(d) on riskihindamise abil tunnistatud nende eesmärgipärase kasutamise korral
zamýlené pouití. ohutuks.
Strojní souásti musí být zalen;ny do stroje/vybavení/komplexní instalace Masinaosa(d) ühendatakse masina, seadme või kompleksse paigaldisega vastavalt lisatud
podle p<iloených pokyn=. juhistele.
Modena 01/08/2012 Modena 01/08/2012
*etina/Czech Eesti/Estonian
FORM 5297 version 2011-10-27 FORM 5297 version 2011-10-27
Tetra Pak Tetra Pak
Nyilatkozat Apliecinjums
a gépalkatrészekrl par manas dau(m)
Tetra Pak Packaging Solutions S.p.A. Tetra Pak Packaging Solutions S.p.A.
Via Delfini 1 Via Delfini 1
41123 Modena 41123 Modena
Italy Italy
A gépalkatrészek biztonságát a rendeltetésszer? alkalmazás során kockázat értékeléssel Ma@nas daBas(u) dro@ba ir pJrbaud@ta no riska novQrtQjuma viedokBa tJm paredzQtJ
ellen>riztük. pielietojuma jomJ.
A gépalkatrészeket a kísér> utasításoknak megfelel>en kell a gépbe/berendezésbe/komplex Ma@nas daBa(as) ir paredzQta(as) iekBauanai ma@nJ/iekJrtJ/sareW@tJ instalJcijJ saskaXJ
installációba beépíteni. ar pievienotajJm pamJc@bJm.
Modena 01/08/2012 Modena 01/08/2012
Magyar/Hungarian Latviski/Latvian
FORM 5297 version 2011-10-27 FORM 5297 version 2011-10-27
Mechanizmo dalies(-iY) sauga numatyto taikymo sZlygomis buvo patikrinta vertinant rizikos Cz]^ci maszyny zosta_y zbadane pod kZtem ryzyka i ocenione jako bezpieczne dla
veiksnius. zastosowa` zgodnych z przeznaczeniem.
Mechanizmo dalis(-ys) bus prijungta(-os) prie mainos/[renginio/kompleksin\s [rangos Cz]^ci maszyny winny zosta{ zamontowane w maszynie/wyposa|eniu/z_o|onej instalacji w
laikantis gautY instrukcijY. sposób zgodny z za_Zczonymi instrukcjami
Modena 01/08/2012 Modena 01/08/2012
, ( ) : declar c aceste componente de utilaj:
, ( ) ~ Componentele utilajului au fost verificate ca fiind sigure în aplicaiile
. pentru care au fost proiectate, printr-o evaluare a riscurilor.
( ) ~ / / Componentele utilajului trebuie încorporate în cadrul mainii/echipamentului/
, ~ ~ . instalaiei complexe în conformitate cu instruciunile însoitoare.
Modena 01/08/2012 Modena 01/08/2012
TechPub_2614345_0110 - RM_3093011_0102lab.fm
Label for 55 mm binder Note! This page is generated automatically.
TechPub_2614345_0110 - RM_3093011_0102lab.fm