BMR Gandhak Rasayan
BMR Gandhak Rasayan
BMR Gandhak Rasayan
Products Details
Product Name: Gandhak rasayan Gandhak rasayan
Product Type Oral Powder (Churna) Pack Size 50/100 gm
DDA. Mfg. Lic. No: 4005 Doc. No. SHC/MFR/BMPR/PC-19
Batch No: S019 Batch Size: 50 kg
Manufacturing Date Feb 2021 Expiry Date 2 years from the date of
manufacturing
Product Start Date 2079/04/06 Ending Date 2079/04/11
1. Manufacturing Precautions: Wear the indicated cleaned gown/ apron, head cover,
nose mask,
Gloves, Safety goggles, shoes/ slipper etc while
production.
Clean & observe daily hygiene on production area &
equipments.
2. Pack Size: 10/100 gm
3. Self Life: 3 years from the date of manufacturing.
4. Storage Precaution: Store in a cool & dry place (below 250c), protect from
direct sun light,
Do not refrigerate.
Weighing the individual ingredients as required and collect in a dry and clean poly bag.
Transfer the weighted ingredients to the disintrigation area.
Total Kg 20
2. Disintrigation Process:
- Inspect the area for clearance.
- Inspect the room & machine cleanness & condition.
- Put the status label in suitable area.
- Disintrigate (Break in to small pieces) to the materials.
5. Mixing Process:
- Inspect the area for clearance.
- Inspect the room & machine cleanness & condition.
- Put the status label in suitable area.
- Mixed with homogeneously above Gandhak Powder and Mishree Powder for a hour in equal
quantity.
6. Drying Process:
- Inspect the area for clearance.
- Inspect the room & machine cleanness & condition.
- Put the status label in suitable area.
- Dry the product on fluid bed dryer for 45 minutes.
7. Sieving Process:
- Inspect the area for clearance.
- Inspect the room & machine cleanness & condition.
- Put the status label in suitable area.
- Pass the product through mesh # 80 size mesh as per sieving SOP.
9. Filling Process:
- Inspect the area for clearance.
- Inspect the room & equipment cleanness & condition.
- Put the status label in suitable area.
- Recheck the filling machine idly and set for require weight.
- Keep the product on hopper of machine.
- Start switch bottom and fill the product as require.
- Sealed by alu. Foil continuously.
Batch No.
Mfg Date
Exp Date
MRP. Rs.
Done by
Done by
Checked by
Approved by
Yield
Taken Sample pcs from each box Total Taken Sample (Pcs) Taken Date & Time
Label Batch Average Cap Corrugated Approximate Leakage
Print/ Coding Wt. Capping Box Wt.
Over Packing/
Print Labeling
Done by Received by
(Date & Signature) (Date & Signature)
Remarks if any:-
.....................................
Released by
(Date & Signature)
No of Cartons Released:
Control Sample:
………50…….. 6Pcs.
gm
…………100….. 6Pcs.
gm
CONCLUSION: In the opinion of the under signed, the product referred to above was found to comply/
Does not comply with respect to the specification and hence can be supplied for market.
Released By
…………………………
QAD In-charge
Mfg. Date: Feb 2021 Exp. Date: 3 years from the date of manufacturing