Ipcr 23 24
Ipcr 23 24
Ipcr 23 24
I, Jackie B. Canzon , of the Las Pinas Manpower Training Center commit to deliver and agree to be rated on the attainment of the following targets in accordance
with the indicated measures for the period of July 1, 2023 to September 30, 2023
Rating
MFO Success Indicators Actual Accomplishments REMARKS
Q1 E2 T3 A4
Strategic Priority No. Measures Targets
Prepare reports (Grading
sheet,enrollment,drop outs made confidently realiable and true passed the
1. report ,candidates for graduation and 100%Submit all papers need in the admin 3 3 3 3 Very Satisfactory
requested document
others)
100% prepared the training plan and training Studied And completely created a tarining plan
2. Prepare Training Plan and Schedule 3 3 3 3 Very Satisfactory
schedule under Tesda Circular
Updating teaching materials allign in Tried and true strategies easy to learen by
3 100% allign in new set up of teaching and learning 3 3 3 3 Very Satisfactory
CBLM in Smaw under Tesda trainees
5 Conduct Instutional Assessment 100 % trainees passed 100 % trainees passed 3 3 3 3 Very Satisfactory
6 Committee in Graduation batch 160 helped as a team well done 3 3 3 3 Very Satisfactory
Final Average Rating 3 3 3 3 Very Satisfactory
Comments and Recommendations for Development Purposes
Discussed with Date Assessed by Date Final Rating by Date
I certify that I discussed my assessment of the