Pump PA-101 is used to transfer water from vessel TA-101 to three different locations i.e. B, C, D.
** Watch our Process Design Engineering course free on YouTube @ Payos Academy **
D
5
1 barg
TA-101 E 10 m
Vessel 4 150 m
4 bar
3 bar g 2 barg F C
3
120m 10 m 4m
B
80 m
5m
1
4m
170 m
PA-101 2
valves Fittings
5m GV NRV Elbow Tee
A-B 1 0 4 3
B-C 2 1 1 1
B-F 1 0 2 2
F-E 2 1 7 3
F-D 2 0 4 2
Design Basis - Payos Academy
NPSH margin 1m
Pump efficiency
Flow above 60 m3/hr 75%
Flow below 30 m3/hr 60%
Other 68%
HMBD - Payos Academy
Stream no. Fluid VFR Density Viscosity Vapor pressure Temp
Min Normal Max
m3/hr kg/m3 cP bar 0c 0c 0c
1 Water 100 1000 1 0.123 20 34 50
2 Water 100 1000 1 0.123 20 34 50
3 Water 50 1000 1 0.123 20 34 50
4 Water 20 1000 1 0.123 20 34 50
5 Water 30 1000 1 0.123 20 34 50
**Watch our Process Design Engineering Course free On Youtube @Payos Academy**
Project Name Solvent recovery
Company Name Payos engineering
Project Number AB02d34 Sheet 1 of 1
Project location PREPARED CHECKED APROVED
REV NO. COMMENTS
DATE BY DATE BY DATE BY
Line Sizing Calculation 1 14-10-2023 ABC 15-10-2023 XYZ 16-10-2023 PQR NA
NA
2 14-10-2023 ABC 15-10-2023 XYZ 16-10-2023 PQR
PID no: AB-F345-TA12-003
Suction Discharge
Line from: Tank C D E B
Line to: Pump B B B Pump
Physical Property Data
Fluid Water Water Water
Viscosity Cp 1 1 1
Liquid Density kg/m3 1000 1000 1000
Temperature Data
Normal 34 34 34
Minimum 20 20 20
Maximum 50 50 50
Pressure Data
Upstream Pressure bar (g) 3 4.00 5.20
Pipe Data
Nominal Line Diameter inches 8 3 6
Pipe Schedule 40 40 40
Pipe Material Type Steel Steel Steel
Inside Diameter inches 7.8 2.8 5.8
Inside Diameter mm 198.1 71.1 0.0 0.0 147.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Friction factor 0.005 0.005 0.005
Flowrates
Mass Flow kg/h 100000 50000 100000
Design Volumetric Flow m3/h 100 50 #DIV/0! #DIV/0! 100 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Line Velocity m/s 0.90 3.50 #DIV/0! #DIV/0! 1.63 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Pres drop per 100m bar/100m 0.039 0.213 #DIV/0! #DIV/0! 0.096 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Line Losses
Pipe Length m 9 84
Number of 90o bends 1 1
Number of valves 1 2
Check Valves 0 1
T-Piece straight run 0 1
T-Piece as elbow 0 0
Other Pressure Drops
Elevation Increase m 0 4 0
Other Pressure Drops bar 0.5 0
Summary
Line Losses bar 0.154 0.329 #DIV/0! #DIV/0! 0.150 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Static Pressure Gain/loss bar 0.000 0.392 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Other Pressure Drops bar 0.5 0 0 0 0 0 0 0 0 0 0 0 0
Total Pressure Drop bar 0.65 0.72 #DIV/0! #DIV/0! 0.15 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Downstream Pressure bar (g) 4.72 5.20 4.80
**Watch our Process Design Engineering Course free On Youtube @Payos Academy**
Project Name Solvent recovery
Company Name Payos engineering
Project Number AB02d34 Sheet 6 of 6
Project location Dubai PREPARED CHECKED APROVED
REV NO. COMMENTS
DATE BY DATE BY DATE BY
Pump Sizing Calculation 1 14-10-2023 ABC 15-10-2023 XYZ 16-10-2023 PQR NA
2 14-10-2023 ABC 15-10-2023 XYZ 16-10-2023 PQR NA