Rodrigo Guardhouse
Rodrigo Guardhouse
1
1
A107
B
E
A
D
C
2000 3500 1500 2000
2000
500
500
1700 420
1500
1
1260
500
100 mm
2
100
610
1 : 50
1
1
1
A106
A102
A104
600
2500
2500
2500
5500
C. TOILET
300 mm
300 mm
SECURITY STATION
1050
FLOOR PLAN
100
500
100 mm
100 mm
1500
1080 75
300 mm
150mm x 400mm RC COLUMN
PLASTER AND SKIM COAT FINISH
COMPLETE WITH PAINTING FINISH
1-
INTERNAL SKIM COAT PAINTED FINISH AND
-
A105
AS BUILT
DRAFTED BY:
DATE :
BIDDING
CEBU INSTITUTE OF AUTHOR
FLOOR PLAN
TOP OF RC BEAM
0-DRIVEWAY LEVEL
400 4770
500
1
150
1500
150
OPEN
2
1 : 50
2500
5500
OPEN
3
OPEN
FRONT ELEVATION
1500
500
4
STRUCTURAL ENGINEER
AS BUILT
DRAFTED BY:
DATE :
BIDDING
CEBU INSTITUTE OF AUTHOR
FLOOR PLAN
TOP OF RC BEAM
0-DRIVEWAY LEVEL
5170
80
1300
.0
0°
2000
B
1
1500
C
1 : 50
5°
2100
800
2000
3500
10500
1200
D
500
80
.0
E
0°
1500
STRUCTURAL ENGINEER
AS BUILT
DRAFTED BY:
DATE :
BIDDING
CEBU INSTITUTE OF AUTHOR
FLOOR PLAN
TOP OF RC BEAM
0-DRIVEWAY LEVEL
5170
2850
4
500
1
1500
500
3
800
1 : 50
1500
2500
5500
2
500
REAR ELEVATION
1500
500
1
100
STRUCTURAL ENGINEER
AS BUILT
DRAFTED BY:
DATE :
BIDDING
CEBU INSTITUTE OF AUTHOR
FLOOR PLAN
TOP OF RC BEAM
0-DRIVEWAY LEVEL
400 3500 1270
5170
1500
80
.0
0°
E
500
1500 1300 800
2000
1500
1
500
100
D
1200
1 : 50
3500
10500
2100
800
2000
5°
C
700
1500
2100
RIGHT SIDE ELEVATION
B
2000
80
.0
1300
0°
A
STRUCTURAL ENGINEER
AS BUILT
DRAFTED BY:
DATE :
BIDDING
CEBU INSTITUTE OF AUTHOR
FLOOR PLAN
TOP OF RC BEAM
5170
0-DRIVEWAY LEVEL
400 3500 1270
6
80
.0
1300
0°
2000
250 2100
B
300
1500
700
C. TOILET
76
1
C
50
350
800
1 : 50
2420
2100
SECURITY STATION
10500
Section 1
1080
1080
D
1400 1300
1500
2700
2000
300
496
80
E
.0
0°
1500
AS BUILT
DRAFTED BY:
DATE :
BIDDING
CEBU INSTITUTE OF AUTHOR
FLOOR PLAN
TOP OF RC BEAM
0-DRIVEWAY LEVEL
5170
500
1500
OPEN
2
1
850
1 : 50
2500
5500
Section 2
3
OPEN
1500
500
4
AS BUILT
DRAFTED BY:
DATE :
BIDDING
CEBU INSTITUTE OF AUTHOR