Professional Documents
Culture Documents
Structural Steel Reconciliation
Structural Steel Reconciliation
Modified
Transfer Total Physical
Labour Bill due to Theoretical
SL ITEM ITEM DESCRIPTION Drawing Purchase from other Receipt at Stock as on
(fabrication) change in Balance
Site Site 31.08.2023
weight
Scrap 429
With respect to Drawing With respect to Executed
Qty Qty
Analysis Loss 1,385 920
Percentage of Loss 12% 7%
Consider, rolling margin 9% 4%
3%, Net Loss 1,025 547 MT