UCEP GAZIPUR TVET INSTITUTE

North Salna, Gazipur.


Project Name: Construction of one floor vertical Extension (3rd Floor) Date: 10/1/2024
Project Phase: Finishing Shift: 8:00 AM-05:00 PM
Site Engineer: Md. Asraful Hoque *M= Mason
Weather Condition: Sunny *H= Helper

Manpower Allocation Challenges/


Sr. No. Task Name: Masonry Carpentry Rebar Concrete Electrical Tiling Painting Plumbing Achievemets/ Progress Issues/Area of Upcoming Activities Comments
M H M H M H M H M H M H M H M H Concern

Earth Excavation For Septic Tank


1 - 4 - - - - - - - - - - - - - -
Exterior Wall Plaster Cutting Trees For Steel Shed Installtion
2 2 1 - - - - - - - - - - - - - - Soak-Well
Exterior Wall Plastering-
Tiling Work at Staff Room & Corridor
3 - - - - - - - - - - 3 3 - - - - Facing Brick Side
Electrical Work-SDB & MDB
Brick Work
4 2 2 - - - - - - - - - - - - - - Box

Washblock CC Casting Thai-Aluminum


5 1 1 - - - - - - - - - - - - - -
Washblock Tiles
6 - - - - - - - - - - - - - - - -
Louver/Curtain Wall
7 - - - - - - - - - - - - - - - -

8 - - - - - - - - - - - - - - - -
uPvc Door Installation
9 - - - - - - - - - - - - - - - -
Septic Tank & Soak-Well
10 - - - - - - - - - - - - - - - -
TOTAL MANPOWER COUNT: 5 8 0 0 0 0 0 0 0 0 3 3 0 0 0 0
#Special Instructions:

#Additional Notes:

Prepared By: Checked By: Authorized By: