CNNC

PROJECT TITLE:
MEP CLEARANCE
HAYYAN VILLAS ARIM 2 PROJECT (306) SHARJAH- UAE

Consultant : Al Wasl Al Jadeed (AWAJ) Request No : P01.24/ARIM2/MEPC/003


Contractor : China Nuclear Industry 22nd Construction Revision : 0
Company Ltd. (Sharjah Branch) Request Date : 11-Jan-2025
Clearance
Sub-Cont. : Anson Construction LLC Required /Civil 13-Jan-2025
WIR Date :

Civil Ref : P01.24/ARIM2/CIV/WIR/119


Mechanical Ref :
Electrical Ref :
Other Ref (If Any) :

Description:
CLEARANCE REQUIRED FOR FOOTING AND STRAP BEAM TO PROCEED WITH CONCRETE POURING
FROM GRID (1-16) x (A'-D) AT [3BTB-8], ZONE 1
CLEARANCE TO PROCEED CLEARANCE TO PROCEED
S# S#
Description ü Description ü
1 PCC 1 Block Works
2 Water Proofing 2 Plaster Work
3 Foundation / Strap Beam ü 3 Floor Screeding
4 Column Neck 4 Floor Water Proofing
5 Tie Beam 5 Floor Tiling
6 Slab 6 Ceiling Grid
7 Column 7 Ceiling Boarding
8 Parappet Wall 8 Painting
9 Upstand 9 External Façade
10 Other 10 Water Tank
11 11 Others

Subcontractor's Engineer ¨ Proceed ¨ Not to Proceed


MEP Project Engineer MEP QA _ QC Engineer MEP Project Manager
Mr. Abbas Mr. Asaithambik Mr. Prakash

Signature Signature Signature

Contractor's Engineer ¨ Proceed ¨ Not to Proceed


MEP CIVIL : QA/QC
Mr. Zucimo Mr. Hasan
Signature : Received By:

Remarks: