IR Bore Piling
IR Bore Piling
IR Bore Piling
To: Date:
LTA Time:
The work described below has been inspected by our Site Engineer and is complete
and ready for your inspection. A checklist is attached overleaf.
Location
Checked and Requested By:
Chainage
Activity
Other Description
Contractor's PM Name & Signature
The meeting noted that the information provided by the Contrator is adequate/not adequate*.
We have inspected the above referenced works and found them acceptable. You may proceed.
However, please return the completed checklist upon completion of the remaining work.
You cannot proceed. Please carry out corrective works as noted on the checklist and
submit a fresh request for inspection.
Other comments:
LTA
The above process for request for inspection of work by Contractor and approval by QP(S) is noted
___________________________________
LTA's representative/Date/Time
CHECKLIST FOR PILING WORKS (BORED PILE) No.
file:ER288:Irforms/Bore plg./pg2/2