Metro
Metro
Metro
City/State
Syestem
Date of
Operation
24-Oct-84
Kolkata
Kolkata Metro
1-Nov-95
Chennai
Chennai MRTS
24-Dec-02
Delhi NCR
Delhi Metro
20-Oct-11
Bangalore
Namma Metro
14-Nov-13
Gurgaon
8-Jun-14
Mumbai
Mumbai Metro
666
3-Jun-15
Jaipur
Jaipur Metro
29-Jun-15
Chennai
Chennai Metro
Under construction
9
Jun-16
Hyderabad
Hyderabad Metro
Page 1
S.No.
City/State
Syestem
10
Nov-16
Kochi
Kochi Metro
11
Mar-17
Lucknow
Lucknow Metro
12
May-17
Noida
Noida Metro
13
Jul-17
Navi Mumbai
14
2019
Nagpur
15
Date of
Operation
Ahmedabad &
Gandhinagar
Nagpur Metro
2020
In Planning
16
2021
Kanpur
Kanpur Metro
17
2021
Meerut
Meerut Metro
18
2021
Patna
Patna Metro
Page 2
S.No.
City/State
Syestem
19
2018
Vijayawada
20
Vijayawada Metro
21
Visakhapatnam
2027
Visakhapatnam Metro(Vizag
Metro)
22
2025
Kozhikode
23
2021
Guwahati
Guwahati Metro
24
2024
Bhopal
Bhopal Metro
25
2025
Indore
26
Date of
Operation
National Capital
Region
Indore Metro
2025
National Capital Region Metro
27
2022
Chandigarh Tricity Chandigarh Metro
Page 3
S.No.
City/State
Syestem
28
2028
Agra
Agra Metro
Varanasi
Varanasi Metro
Allahabad
Allahabad Metro
29
30
31
Pune Metro
Pune
32
Gwalior
33
Gwalior Metro
Bhubaneswar &
Cuttack
Bhubaneswar Metro
34
Date of
Operation
Dehradun Metro
Surat Metro
Nasik
36
Page 4
S.No.
City/State
Syestem
37
Srinagar
Srinagar Metro
Mumbai
38
Page 5
Date of
Operation
System Length
In Operation
Planned
Under
Construction
Lines
Stations
28.4km
120.25km
90km
24
19.34km
24.235km
4.5km
17
213km
126.547km
122.205km
6
160
31.52km
72km
10.78km
2
30
5.1km
7km
12
11.4km
105.5km
9.2km
32.5km
2.4km
10.100km
63km
35km
92km
71.6km
Page 6
System Length
In Operation
Planned
Under
Construction
Lines
Stations
22
25.6km
36km
29.7km
106.4km
38.2km
37.766km
84km
30km
60km
Page 7
System Length
In Operation
Planned
Under
Construction
26km[35]
22km
39km
22km
44.2km
85km
107km
381km
37.5km
Page 8
Lines
Stations
System Length
In Operation
Planned
Under
Construction
27km
25km
25km
30km
Page 9
Lines
Stations
System Length
In Operation
Planned
Under
Construction
63.27km
Page 10
Lines
Stations
Voltage
750 V DC Third
rail
25kV AC OHE
25kV AC OHE
750 V DC Third
rail
750 V DC Third
rail
Remarks
25kV AC OHE
rf
25kV AC OHE
25kV AC OHE
Page 11
Voltage
750 V DC Third
rail
Remarks
25kV AC OHE
N/A
25kV AC OHE
Construction began on 30
May 2015.[26]
750 V DC Third
rail
N/A
N/A
DPR being prepared.[31]
N/A
DPR being prepared.[32]
Page 12
Voltage
N/A
Remarks
DPR Approved by AP
Cabinet,Construction works
are yet to start,First Phase
scheduled to run from
August 2018 [36] Construction
work starts by June 2015[33]
[37][38][39]
N/A
N/A
N/A
N/A
DPR being prepared.[9][49]
25kV AC
25kV AC
25kV AC
N/A
Page 13
Voltage
N/A
N/A
Remarks
N/A
DPR being prepared[64]
N/A
Construction to start in
2017[66]
N/A
DPR being prepared[68]
N/A
DPR submitted[70]
N/A
N/A
Page 14
Voltage
Remarks
N/A
N/A
Page 15
S.No.
City/State
Syestem
Proposed
Date of
Operation
In Planning
1
Kanpur
Kanpur Metro
2021
Meerut
Meerut Metro
2021
Patna
Patna Metro
2021
Vijayawada
Vijayawada Metro
2018
Visakhapatnam
Visakhapatnam Metro(Vizag
Metro)
Kozhikode
2025
Guwahati
Guwahati Metro
2021
Page 16
2027
S.No.
City/State
Syestem
Proposed
Date of
Operation
Bhopal
Bhopal Metro
2024
10
Indore
Indore Metro
2025
11
National Capital
Region
2025
12
2022
13
Agra
Agra Metro
2028
14
Varanasi
Varanasi Metro
15
Allahabad
Allahabad Metro
16
Pune
Pune Metro
Page 17
S.No.
City/State
Syestem
17
Gwalior
Gwalior Metro
18
Bhubaneswar &
Cuttack
Bhubaneswar Metro
19
Dehradun Metro
20
Govt. of Haryana
21
Govt. of Haryana
22
Narela (Delhi) to
Kundli (Sonipat,
Karyana)
Govt. of Haryana
Surat
Surat Metro
24
Nasik
Page 18
Proposed
Date of
Operation
S.No.
City/State
Syestem
25
Srinagar
Srinagar Metro
26
Mumbai
Page 19
Proposed
Date of
Operation
System Length
84km
Remarks
30km
DPR being prepared.
60km
DPR being prepared.
26km[35]
22km
39km
22km
DPR Approved by AP
Cabinet,Construction works
are yet to start,First Phase
scheduled to run from
August 2018 Construction
work starts by June 2015.
DPR approved and submitted
by DMRC; awaiting cabinet
approval
Construction of Phase-1 to
be completed by December
2018.[43] DPR prepared and
to be submitted .
DPR approved and submitted
by DMRC on October 2014;
awaiting cabinet approval
44.2km
DPR being prepared.
Page 20
System Length
Remarks
85km
DPR being prepared.
107km
381km
37.5km
27km
25km
25km
DPR being prepared
31.515 km (phase 1)
Page 21
System Length
Remarks
Construction to start in
2017.
30km
DPR being prepared.
DPR submitted.
DMRC is conducting the
feasibilty report for the
proposed alignment
DMRC is conducting the
feasibilty report for the
proposed alignment
DMRC is conducting the
feasibilty report for the
proposed alignment
Page 22
System Length
Remarks
63.27km
Page 23
S.No.
City/State
Syestem
Date of
Operation
Under construction
Hyderabad
Hyderabad Metro
Jun-16
Kochi
Kochi Metro
Nov-16
Lucknow
Lucknow Metro
Mar-17
Noida
Noida Metro
May-17
Navi Mumbai
Jul-17
Nagpur
Nagpur Metro
2019
Page 24
S.No.
City/State
Ahmedabad &
Gandhinagar
Syestem
Date of
Operation
2020
In Planning
8
Kanpur
Kanpur Metro
2021
Meerut
Meerut Metro
2021
10
Patna
Patna Metro
2021
11
Vijayawada
Vijayawada Metro
2018
12
13
Visakhapatnam
Visakhapatnam Metro(Vizag
Metro)
Page 25
2027
S.No.
City/State
Syestem
Date of
Operation
14
Kozhikode
2025
15
Guwahati
Guwahati Metro
2021
16
Bhopal
Bhopal Metro
2024
17
Indore
Indore Metro
2025
18
National Capital
Region
2025
19
2022
20
Agra
Agra Metro
2028
21
Varanasi
Varanasi Metro
Page 26
S.No.
City/State
Syestem
22
Allahabad
Allahabad Metro
23
Pune
Pune Metro
24
Gwalior
Gwalior Metro
25
Bhubaneswar &
Cuttack
Bhubaneswar Metro
26
Dehradun Metro
27
Govt. of Haryana
28
Govt. of Haryana
29
Narela (Delhi) to
Kundli (Sonipat,
Karyana)
Govt. of Haryana
Page 27
Date of
Operation
S.No.
City/State
Syestem
30
Surat
Surat Metro
31
Nasik
32
Srinagar
Srinagar Metro
33
Mumbai
Page 28
Date of
Operation
System Length
In Operation Planned
92km
Under
Construction
Lines
Stations
22
71.6km
25.6km
36km
29.7km
106.4km
38.2km
Page 29
System Length
In Operation Planned
Under
Construction
37.766km
84km
30km
60km
26km[35]
22km
39km
Page 30
Lines
Stations
System Length
In Operation Planned
Under
Construction
22km
44.2km
85km
107km
381km
37.5km
27km
25km
Page 31
Lines
Stations
System Length
In Operation Planned
Under
Construction
25km
31.515 km
(phase 1)
30km
Page 32
Lines
Stations
System Length
In Operation Planned
Under
Construction
63.27km
Page 33
Lines
Stations
Voltage
Remarks
25kV AC OHE
750 V DC Third
rail
25kV AC OHE
N/A
25kV AC OHE
Construction began on 30
May 2015.
Page 34
Voltage
Remarks
750 V DC Third
rail
N/A
N/A
DPR being prepared.
N/A
DPR being prepared.
N/A
N/A
N/A
DPR Approved by AP
Cabinet,Construction works
are yet to start,First Phase
scheduled to run from
August 2018 Construction
work starts by June 2015.
DPR approved and submitted
by DMRC; awaiting cabinet
approval
Construction of Phase-1 to
be completed by December
2018.[43] DPR prepared and
to be submitted .
Page 35
Voltage
N/A
Remarks
N/A
DPR being prepared.
25kV AC
25kV AC
25kV AC
N/A
N/A
N/A
Page 36
Voltage
Remarks
N/A
DPR being prepared
25 kV AC through
overhead
catenary
N/A
Construction to start in
2017.
N/A
DPR being prepared.
N/A
DPR submitted.
DMRC is conducting the
feasibilty report for the
proposed alignment
DMRC is conducting the
feasibilty report for the
proposed alignment
DMRC is conducting the
feasibilty report for the
proposed alignment
Page 37
Voltage
N/A
N/A
Remarks
N/A
N/A
Page 38
Meka Group
304 Shiv Smriti Chambers,
49 Dr. A B Rd, Worli,
Mumbai, Maharashtra, India
Tel :
+91 22 40890000
Fax :
+91 22 40890001
Srishaila Constructions.
#515, 4th
Main, 1st cross,
1st stage, 4th block,
HBR Layout, Kalyan Nagar, Bangalore - 560043 Tel: 080 25440520
080 25437285 Fax: 080 25440520 info@srishailaconstructions.com
rajendra@srishailaconstructions.com
Web Address
http://www.meka.com/
www.srishailaconstructions.com
http://www.cccorpn.com/
http://ratnashreeconstructioncompany.com/
http://www.yojaka.co.in/
http://www.dbm.in/
City
System
Mumbai
Mumbai Monorail
Chennai
Kolkata
Coimbatore
Ranchi
Allahabad
Bangalore
Delhi
Indore
Kanpur
Navi Mumbai
Patna
Pune
Ahmedabad
Aizawl
Jodhpur
Kota
Nagpur
Nashik
Chennai Monorail
Kolkata Monorail
Coimbatore Monorail
Ranchi Monorail
Allahabad Monorail
Bangalore Monorail
Delhi Monorail
Indore Monorail
Kanpur Monorail
Navi Mumbai Monorail
Patna Monorail
Pune Monorail
Ahmedabad Monorail
Aizawl Monorail
Jodhpur Monorail
Kota Monorail
Nagpur Monorail
Nashik Monorail
Operations
began
System
length (km)
2-Feb-14
8.26
2018 57km
72km
25km
70.4km
60km
90km
63km
36.82km
32km
52km
30km
50km
130km
Lines
Stations
1
3
2
2
2
2
Notes
7
Centre approved Chennai monorail project
37 to be implemented under DBFOT model.
33
6
3
2
4
2
4