BSR 2021
BSR 2021
BSR 2021
01. As per the F.R. 425 of the Central Provincial Council, these standard rates are valid
from 01.01.2021 to 31.12.2021.
02. Value Added Tax (VAT) has not been included when preparing these rates. However,
if necessary, VAT can be added to the estimate by calculating 8% (or the approved
percentage) of the total value of Bill of Quantities (BOQ).
03. These rates were determined for all 03 districts of the Central Province, considering
the market prices in the last quarter of 2020 and the rates approved by the District
Price Committees.
04. The Building Schedule of Rates, Highway Schedule of Rates and the Irrigation
Schedule of Rates were initially prepared by Provincial Department of Engineering
Services, Provincial Road Development Authority (PRDA) and Provincial
Department of Irrigation respectively, and approved by the Provincial Price
Committee.
05. Building rates are valid for buildings up to four storeys only, highway rates are valid
for C, D, E and lower grade roads only and irrigation rates given are valid only for
minor irrigation work.
06. These rates have been prepared in accordance with the specifications approved by the
Construction Industry Development Agency (CIDA) and using materials conforming
to Sri Lanka Standards (SLS), British Standards (BS), American Standards (ASTM)
and Euro Standards (EURO). The approval of the Site Engineer shall be obtained
when it is required to use materials without their standards certified. Thus, the quality
of the construction work shall be ensured.
07. Approval has been granted for the use of certain major construction materials on the
request of some trading organizations after testing them under the supervision of the
Department of Engineering Services. The use of approved materials is recommended,
and in other cases it is the responsibility of the Engineer in charge to conduct proper
tests to ensure the quality of the materials.
08. The institution/ company carrying out the construction work shall take steps to ensure
the materials used meet the recommended standards. If additional tests are required as
per the engineering requirements, such expenses can be reimbursed only when the
materials tested meet the quality standards. In other cases the institution/ company
will have to bear the expenses of the tests.
09. The rates herein can be used to prepare Total Cost Estimates and to evaluate
competitive bids. These rates have been determined based on certain assumptions and
their accuracy may depend on many factors such as location of the site, availability of
materials, variation of labour wages, staff of the construction company, machinery,
financial capability, nature of other works being carried out by the company,
10. Transport charges for a distance of 10km are included in the rates. If the materials
have to be transported for more than 10km additional transport charge should be
added to the rate.
11. In the execution of a specialized work under provisional sum the applicable
attendance fee factor shall be 8% only.
12. The rates column should be selected depending on the total cost of the project when
preparing the estimates. If the Total Cost is Rs. Three Million or higher, items coming
under preliminaries should be included in the bill of quantities as a separate bill to the
estimate.
13. These rates have been prepared using conventional rate analysis methods. Rates shall
be prepared by using a work study for works that require specialized equipment or
machinery. Soft copies and hard copies of such rates shall be submitted to the Deputy
Chief Secretary (Engineering Service) of Central Province for approval.
14. Overhead and profit percentages related to Special Schedule of Rates (SSR) or In-lieu
Schedule of Rates (ISR) may be determined on Pro Rata basis by analysing rates for
similar works or as per the Condition of Contracts of Standard Bidding Documents.
16. In order to avoid adverse effects of price variations to the construction process, price
variation formulae given in the Standard Bidding Documents shall be incorporated for
all construction works with a construction period exceeding three months (as per the
Standard Bidding Documents or NPA Guidelines). The estimates should be provided
with provisions enabling payments for price variations.
17. These rates are valid only for measure and pay works, quality controlled by the
Engineer. These rates are not valid for other types of construction works such as
works, quality assured by the contractor etc.
Page
Building Schedule of Rates -01 to 69
ANNEX - 01
Drawings
ANNEX - 02
Approved Construction Material Price for
2021
BUILDING SCHEDULE OF RATES - 2021
Page
-
GENERAL NOTES I to XIII
- DEMOLITION/ ALTERATION / REPAIR
SECTION C -1 to 6
AND MAINTENANCE
-
SECTION D EXCAVATION AND EARTH WORK -7 to 9
-
SECTION F CONCRETE WORKS -10 to 13
- MASONRY WORKS/BRICK WORK/
SECTION G -14 to 15
BLOCK WORK
-
SECTION H WATER PROOFING -16
- STRUCTURAL METAL WORKS FOR
STEEL IN FRAMED STRUCTURES/
SECTION J ALUMINUM IN FRAMED STRUCTURES/ -17 to 18
METAL WORK IN UNFRAMED
STRUCTURES
-
SECTION K METAL WORK -19 to 22
-
SECTION L WOOD WORK -23 to 27
- PARTITIONS/LININGS/SUSPENDED
SECTION N -28 to 29
CEILINGS
SECTION P - ROOF COVERING / ROOF PLUMBING - 30 to 32
-
SECTION Q PLUMBING / SANITARY INSTALLATION -33 to 36
-
SECTION R MECHANICAL INSTALLATIONS -37
-
SECTION S ELECTRICAL INSTALLATIONS -38 to 56
-
SECTION T FLOOR / WALL / CEILING FINISHES -57 to 59
-
SECTION U GLAZING / INFILL PANELS -60
-
SECTION V PAINTING -60 to 61
-
SECTION W DRAINAGE SYSTEMS -62 to 64
-
SECTION X EXTERNAL WORK -65 to 66
-
TABLE 01 MANUAL TRANSPORT - 67
-
TABLE 02 MATERIAL TESTING RATES - 68 to 69
BUILDING SCHEDULE OF RATES (BSR) – 2021
This Document is valid from 1st of January 2021 to 31st of December 2021
Basic Prices
The basic prices approved by the Central Provincial Price Committee 2020 are used to
prepare the BSR for the year 2021.
General Notes
Only those materials which are specially mentioned in the descriptions should be used
and should be the best quality material, confirming to the requirements of the relevant
standard. (SLS, ISO or BS)
All the materials & the quality of the material should be approved by the Engineer,
described in the agreement.
I
Working Rates of this BSR are calculated as follows
a. For the projects where the Total Cost Estimate (TCE) is less than or equal 3 million
rupees
b. For the projects where the Total Cost Estimate (TCE) is over 3 million rupees
II
Following are the breakup of overheads,
Item Site Overhead Percentage
No.
1 Supervision of work (wages of work supervisors) 1
2 Supervision of labor (wages of gangers) 4
3 Temporary work :
a) Access road & maintenance 0.2
b) Accommodation for labor 0.7
c) Stores building 0.6
d) Fencing, Hording & Protection 0.3
e) Provision of water, Lights etc 0.3
f) Clearing 0.2
g) Stacking of building materials including cement & steel 0.4
Note: The contractor shall submit “As Built Drawings” with the final valuation (Bill), if
stated in the contract documents
III
Table-04
Item General Overhead Percentage
No.
IV
c. Following are the breakup of overheads for improvements and maintenance projects where
the total cost estimate (TCE) over 3 million rupees.
Separate preliminary bill shall be included.(Applicable site overhead percentages for the
preliminary bill shall be taken from Table – 05)
Overheads & Profit margin is taken as 16 % of the basic rates.
V
Measurements of painting (Doors, Windows & Partitions)
Measurement of painting when both sides are painted shall be calculated by multiplying the area of
one side of the door, window or partition painted by the coefficients as below.
Table-06
VI
Imported Materials
When imported materials are allowed to be used, it should be approved by the Engineer described in
the contract agreement.
Aluminium works
a. All aluminium metal work shall comply with specification AA6063, T5 or BS 1474 of 1972.
Special attention should be drawn to the following details.
Alloy – AA6063
Hardness – 71 – 81 Rockwell E
Temper – T5
Tensile strength – 155 N/sq.mm (minimum)
Anodizing Thickness– 10-15 Micron and should be confirmed to BS 3987 - 1974
Powder Coating Thickness– 60-80 micron and should be confirmed to BS 6496: 1984
Sample should be approved by Engineer / Architect
Thickness of extrusions for windows & partition – 1.2 mm + 10%
Thickness of extrusion for door – 1.5 mm + 10 % door
b. The colour anodized finish shall be a coating of non fading and hard organic type in dark Bronze
colour (Lower limit) compatible with the colour used.
c. All extruded aluminium alloy sections shall be bronze anodized to a thickness 15–20 microns.
The bidder should furnish a manufacturer’s certificate that the anodized finish complies with the
specified micron content.
d. Screws used in the construction of frames shall be high tensile stainless steel or a non-corrosive
material compatible with aluminium.
VII
Waterproofing
For waterproofing, cementitious, elastomeric or bituminous materials shall be used, according
to the situation. This should be approved by the Engineer described in the contract agreement.
For electrical cable sections given in BSR the following table should be followed
New
Conductor cross section Old method
method
mm2 a/dia. (inch)
a/dia. (mm)
mm2
1.0 1/1.13 1/0.044
1.5 1/1.38 1/0.054
1.5 7/0.53 3/0.029
2.5 7/0.67 7/0.029
4.0 7/0.85 7/0.036
6.0 7/1.04 7/0.044
10 7/1.35 7/0.052
16 7/1.70 7/0.064
25 7/1.35 19/0.052
30 19/1.53 19/0.064
Table-07
a = Number of strands
dia. = Diameter of a conductor
VIII
Method of Measurement
Bill of Quantities have been generally prepared in accordance with principles of the Standard
Method of Measurements for Building work in Sri Lanka (SLS 573 1999 )
The quantities of material, plant and labor required for the items are computed from known data
and experience.
Rates of each item include 10km distance for transport of sand, metal, steel, bricks when transport
distance exceeds 10 km additional cost should be added according to Material price and Transport
cost 2020.
Head transport rates refer Material price and Transport cost 2021. Necessity of head transport
should be decided by Engineer.
New rates shall be prepared for any item deviate from the description of the BSR.
All unit rates are in Sri Lankan Rupees.
IX
Timber
Under exceptional Circumstances, any equivalent timber to the given species may be
used with the approval of the Engineer.
Valance board
Local timber: Ginisapu, Gammalu, Suriyamara, Hulanhik. Kolon
Imported timber: Tulang
For sashes:
Local timber: Halmilla , Hulanhik, Sooriya mara, Kohomba
Imported timber: Thulang
X
State Timber Corporation
Timber Classifications
Extracted from http://www.timco.lk/stc/files/CLASSIFICATIONofTIMBER.pdf
on 28/12/2020
CLASSIFICATION OF TIMBER
(Logs & Sawn Timber)
Luxury Class :
Satin, Halmilla, Milla, Mahogany (Narrow leaved), Mahogany (Broad leaved), Jak
Special Class :
Tamarind (Hard Wood), Kumbuk, Eucalyptus microcorys
Class I :
Tawwanna, Uva Mandora, Munamal, Ubberiya, Eucalypus Pilularis, Eucalyptus Citriodora, Accasia
Melanoxylon, Panakka, Hora, Kirihambiliya, Urukanu or Uruhonda, Mandora, Pihimbiya, Etathimbiriya
or Ginikulu, Helamba, Del, Liyan, Neralu, Madan, Kon, Kirikon, Wanami, Mi, Na (Mesua ferrea),
Ketakela, Pathkela & Keeriya, Trestania comserta, Paramara, Hedawaka, Treated Grandis, Damba,
Dambu, Domba.
Class II :
All Dun species other than Thiniyadun, All Keena species other than Walukeena, Alubo, Dawata, Dawul –
Kurundu, Godapara, Halmandora, Panamora, Wa, Welipenna, Toona, Mihiriya, Karaw, Panu-Dan,
Rathatiya, Thimbiri, Derana, Na Imbul, Gonapana, Thiththeta, Kosganna, Kiripedda, Talang, Euclyptus
Grandis, Cypress, Ethdemata, Ginisapu, Ehela, Boron Treated Sawn Rubberwood, Alastoniya (Havari
Nuga), Boron Treated Sawn Pinus, Eucalyptus Robusta (Red Gum), Eucalyptus Globulus (Blue Gum),
Comporta, Redness, Coconut, Eucalyptus Thoraliyana, Eucalyptus Kamaldensis, Kaya, Eucalyptus
Tereticornis, Accacia docaran, Accacia mangium, Lunumidella.
Class III :
Aridda, Malabada, Diyathaliya, Pinus,Thelambu, Bath-hik, Atamba, Bulu, Kahata, Rubber, Rata-
Amba(Mango), Ratadel, Davu, Godakaduru,Gokatu, Sabbukku (Graviliya), Godakirilla, Mora,Kataboda,
Goraka, Tammarin (Sapwood), Bakme, Kakuna, Casurina (Kasa Kasa), Beli, Dunumandala, Batadomba.
Class III Others :
General Manager
State Timber Corporation
2019.12.03
XI
Cement Blocks
Test report shall be submitted by the contractor on compressive strength for every 500 number of
cement blocks supplied to the site. When the number of blocks involved for the project is less than
500, the necessity of the test shall be decided by the engineer.
Interlock Blocks
Test report shall be submitted by the contractor on compressive strength for every 800 number of
interlock blocks supplied to the site. When the number of blocks involved for the project is less than
800, the necessity of the test shall be decided by the engineer.
Fence Posts
Test report shall be submitted by the contractor on compressive strength of concrete (Rebound
Hammer Test) for every 15 number fence posts
XII
BUILDING SCHEDULE OF RATES
EFFECTIVE FROM 2021 JANUARY
RATE FOR
RATE FOR
SE. ITEM TCE
DESCRIPTION UNIT TCE ABOVE
NO NO. BELLOW
3M/Rs.
3M/Rs.
SECTION C - DEMOLITION /
ALTERATION / REPAIR AND
MAINTENANCE
DEMOLITIONS
Hacking up pavings
Demolishing Hacking up & clearing debris away of
1 C-001 floor paving brick or rubble inclusive of rendering. m2 173.00 188.00
ALTERATIONS
Supplying & fixing approved closet squatting foot rest
type (Orissa pan) with trap, supplied and fixed to
38 C-038 working order, including connection to sewer line. Rate nr 18,365.00 19,948.00
includes for breaking floor and concreting, cement
rendering in damaged areas.
39 C-039 Removing and re-fixing available wash basin. nr 3,619.00 3,931.00
Removing finishings
40 C-040 Paint removing from any surfaces with blow lamp. m2 345.00 375.00
Chipping & clearing debris away from brick wall
41 C-041 m2 259.00 281.00
plasters and floor rendering.
Chipping & clearing debris away from concrete wall
42 C-042 m2 388.00 422.00
plasters and concrete floor rendering.
Cement, lime and sand plaster, breaking the damaged
areas and replastering with 20mm thick 1:1:5 cement,
43 C-043 m2 1,383.00 1,503.00
lime and sand, finished smooth with lime putty.
Removing coverings
Disposal
Bailing out and cleaning of well total depth up to 3.0m
120 D-034 (measured, capacity of well below water table). m3 690.00 750.00
Filling
Filling earth and compacting (as approved by Engineer)
127 D-041 150mm layers in large quantities. Rate includes for m3 1,782.00 1,935.00
transport of 30 m.
Filling earth and compacting (as approved by Engineer)
128 D-042 150mm layers under floors. Rate includes for transport m3 1,998.00 2,171.00
of 30 m.
Compacting approved gravel, filled in 150mm layers by
129 D-043 manual tamping as specified. (Gravel available at site) m3 1,142.00 1,241.00
Insitu concrete
Mixing and placing in position concrete grade 30,
nominal mix 1:1:2 (20mm) using a concrete mixer
133 F-001 m3 29,124.00 31,635.00
including fuel / operator / handling/vibrator & curing.
Form Work
Sawn timber formwork in class III timber for ground
concrete work with side support or props, at ground
142 F-010 m2 1,461.00 1,587.00
level plinth beams, lintols etc. including fixing and
dismantling.
Sawn timber form work in class III timber with bearers,
143 F-011 joist and props including fixing and dismantling for m2 1,591.00 1,728.00
underside of first floor slab.
Sawn timber formwork in class III timber with side
144 F-012 support using props for columns mould including m2 2,887.00 3,136.00
fixing, and dismantling in ground floor.
Sawn timber form work in class III timber with bearers,
145 F-013 joist and props including fixing and dismantling for m2 3,604.00 3,915.00
underside of first floor beams.
Reinforcement
Mild steel reinforcement bend to shape laid in position
147 F-015 and tied with G.I. wire as directed.Including spaces & Kg 307.00 334.00
chairs.
Tor steel reinforcement bend to shape laid in position
148 F-016 and tied with G.I. wire as directed.Including spaces & Kg 307.00 334.00
chairs.
Flag Post
2400mm x 825mm x 450mm plat form with 75mm thick
1:3:6 (40mm) base & 2400mm x 300mm x 225mm step
in rubble and 75mm thick 1:2 :4 (20mm) concrete
topping. Inclusive of 1:3 cement and sand rendering
finished smooth with coloured cement floating and
149 F-017 polishing and providing three numbers No 66,262.00 71,974.00
2"dia.(O.D.),4.5mm tk. G.I.pipe flag post complete with
painting (two coats of metal primer and two coats of
enamal) and provide necessary arrangements for
hoisting the flag as per the drawing
No.CPC/CS/11/04/2017/Type-ST/02(i).
3300mm x 1350mm x 600mm platform for Flag Post
with 1:2:4 (20mm) concrete and 1:3 cement and sand
rendering finished smooth with coloured cement floating
and polishing and providing three numbers 2" dia.
(O.D.) (4.5mm tk) G.I.pipe flag post complete with
150 F-018 painting (two coats of metal primer and two coats of No 146,090.00 158,684.00
enamal) and provide necessary arrangements for
hoisting the flag. All shall be to working order as per the
drawing Nos..CPC/CS/11/04/2017/Type-ST/02(i).
CPC/CS/11/04/2017/Type-ST/02(ii).
Drain
Drain 225mm X 150mm (average depth) concrete
1:21/2:5 (25mm) 75mm thick, provide expansion joints
at 3000mm crs 12mm thick , 1:3 cement, sand rendering
155 F-023 finished smooth, including necessary excavation, form m 2,457.00 2,673.00
work, laying polythene membrane under concrete and
laid to required slope.
Drain 225mm X 300mm(average depth) concrete 1:2
1/2:5 (25mm) 75mm thick, provide expansion joints at
3000mm crs 12.5mm thick , 1:3 cement, sand rendering
156 F-024 finished smooth, including necessary excavation, form m 4,003.00 4,348.00
work, laying polythene membrane under concrete and
laid to required slope.
Drain 225mm x 450mm(average depth) concrete 1:2
1/2:5 (25mm) 75mm thick, provide expansion joints at
3000mm crs 12.5mm thick , 1:3 cement, sand rendering
157 F-025 finished smooth, including necessary excavation, form m 4,985.00 5,415.00
work, laying polythene membrane under concrete and
laid to required slope.
750mm wide ramp and 225mm X 150mm(average
depth) drain in 1:2 1/2:5(25mm) concrete 75mm thick
with 1:3 plaster finished smooth, including necessary
158 F-026 excavation, form work, providing expansion joints at m 4,320.00 4,683.00
3000mm crs and laying polythene membrane under
concrete and laid to required slope.
Flight of Steps
Constructing flight of steps in 1:2 1/2 :5(25mm)
concrete overall width 1.5m, waist 100mm on well
compacted ground, waist below ground level, curb walls
150mm thick overall height 450mm in outer surface.
160 F-028 Rate includes all formwork and 1:3 cement rendering m 14,636.00 15,898.00
finished smooth to exposed surfaces. size of steps 150
mm rise and 275mm tread.(Measured sloping length.)
WALLS
Brick work in 1:5 cement sand mortar 225mm thick
162 G-001 m3 21,348.00 23,188.00
(Nominal)and above in foundations up to D.P.C .
Brick work in 1:8 cement sand mortar 225mm thick
163 G-002 m3 21,598.00 23,460.00
(Nominal)in super structure in ground floor.
Brick work in 1:5 cement sand mortar 112.5mm thick
164 G-003 m2 2,713.00 2,947.00
(Nominal) in ground floor.
Brick work in 1:5 Cement Sand Mortar 225mm thick
165 G-004 m2 3,221.00 3,499.00
(nominal) Large brick in ground floor.
Brick work in 1:5 Cement Sand Mortar 150mm thick
166 G-005 m2 2,118.00 2,301.00
(nominal) Large brick in ground floor.
Masonry block work 100mm thick (Nominal) in walls
in cement and sand 1:5 motar using hollow blocks made
167 G-006 of cement and sand to the proportion of 1:10, m2 1,824.00 1,982.00
confirming to compressive strength not less than
2N/mm2 in ground floor.
Masonry block work 150mm thick (Nominal) in walls
in cement and sand 1:5 motar using hollow blocks made
168 G-007 of cement and sand to the proportion of 1:10, m2 2,100.00 2,281.00
confirming to compressive strength not less than
2N/mm2 in ground floor.
Masonry block work 200mm thick (Nominal) in cement
and sand 1:5 motar using hollow blocks made of
169 G-008 cement and sand to a proportion of 1:10, confirming to m2 2,745.00 2,982.00
compressive strength not less than 2N/mm2 in ground
floor.
PROJECTION
R.R masonry in 1:5 cement and sand motar in
170 G-009 m3 15,963.00 17,339.00
foundations.
R.R masonry in 1:5 cement and sand motar in
171 G-010 m3 17,507.00 19,016.00
superstructure.
Providing of weep holes in retaining walls with 90mm
dia. PVC down pipes including metal packing around
172 G-011 nr 598.00 650.00
inner mouth as directed, length of pipe up to 1050mm.
Windows
Fabricating and fixing Anodized aluminium glazed
window with openable sash with aluminium
architectural sections with 10 - 15 micron coating glazed
193 K-001 4.6 mm thick glass including all necessary rubber m2 17,111.00 18,586.00
beading, rawl plug etc.(The used sections are CA 1009,
CA 1010, CA 2005, 70SM 1011)
Fabricating and fixing Anodized Aluminium glazed
fanlight with openable sash with aluminium architectural
sections with 10 - 15 micron coating glazed 4.6 mm
194 K-002 thick glass including all necessary rubber beading, rawl m2 22,722.00 24,680.00
plug etc.(The Used sections are -CA-1009, CA 1010,
CA 2005, 70SM 1011)
Fabricating and fixing Anodized aluminium sliding
window with aluminium architectural sections with 10 -
15 micron coating glazed with 4.6mm thick glass
195 K-003 including all necessary rubber beading, rawl plug m2 12,919.00 14,032.00
etc.(The used sections are 70S 1001, 70S 1101 -1, 70S
1201 - 1, 70S 1401, 70S 1501, 70S 1601, 70S 1701)
Louvers
Fabricating and fixing Anodized aluminium louvers
panel fixed to aluminium window or doors with
aluminium architectural sections with 10 - 15 micron
199 K-007 coating including all necessary fitting etc.(Aluminium m2 23,730.00 25,775.00
window or door measured separately).(The used
sections are DG01, DG101, A -110 -AT)
Rolled shutters
Supply and fixing Zn/Al powder coated roller door
consisting 0.6mmthick zink aluminium Powder coated
sheet, pulleys, side plate with the racers and necessary U
209 K-017 channels. All complete to working order. Excluding the m2 8,678.00 9,426.00
covering box and electrical motor.
Grilles
Fabricating & fixing Special security grill fixed for
windows complete with perimeter & either side of
middle opening frame in 16mm x 5mm M.S flat &
5.2mm dia. minimum MS bars at 105mm c/c
210 K-018 horizontally and 135mm c/c vertically welded & fixed m2 9,024.00 9,802.00
to walls with rawl plugs, screws inclusive of two coats
of enamel paint and under two coats of anticorrosive
paint.as per detail drawing No.
CPC/CS/11/04/2017/TYPE-ST/09
Wire mesh
Fabricating & fixing security weld mesh door sash with
locking divice, in GI weld mesh 50mm x 50mm SWG
10, welded on 40mm x 40mm x 5mm MS angle frame
211 K-021 complete with application of two coats enamel paint m2 13,952.00 15,155.00
over two coats of anticorrosive paint complete .as per
detail drawing No. CPC/CS/11/04/2017/TYPE-ST/06
Metal fences
Chain link mesh fence 2.0m high (Gauge 12) with
48mm outer Dia. 3.2mm tk. GI pipe at 2.9m c/c up
rights and 21mm Outer Dia. 1.8mm tk. GI verticle
centre bracing . 48mm Outer Dia. 3.2mm tk. GI pipe at
top and bottom runners, including excavation foundation
213 K-023 concrete work 1:2:4(20mm) welding work, painting of m 9,404.00 10,215.00
two coats of etching primer and finished with one coat
of enamel etc.(Chainlink fence open area 2"x2") All as
per detail drawing No .CPC/CS/11/04/2017/Type-
CLF/01
JOINERY
TIMBER CEILLING
Supplying & Fixing 19mm thick Lunumidella tongued
226 L-013 and grooved Ceiling , under side of rafters, on existing m2 2,062.00 2,240.00
timber frame work.
Supplying & Fixing Flat Lunumidella tongued and
grooved Ceiling 19mm thick complete with timber
frame class 1 100mm x 50mm joists at 0.6m crs. Rate
227 L-014 included for application of wood preservative on timber m2 4,828.00 5,244.00
frame work twice. (Painting measured separately).
ASBESTOES CEILLING
Flat asbestos ceiling Supplying & fixed with wire nails
to 100mm x 50mm joists at 1.2m c/c & 50mm x 50mm
bearers @ 0.6m c/c in class 1 timber including 35mm x
12mm beadings and 50mm x 35mm cove mouldings of
228 L-015 approved timber. Rate included one coat of primer, two m2 4,987.00 5,417.00
coats of emulsion paint to underside of ceiling and two
coats of wood preservative(stain) to timber frame work.
TIMBER DOORS
DOOR,WINDOW FRAMES
Supplying & fixing door, window frames new, measured
245 L-032 length of timber using treated kempas, 95mm x m 1,238.00 1,345.00
45mm (Nominal).
SECTION N - PARTITIONS/
LININGS/SUSPENDED CEILINGS
DEMOUNTABLE PARTITONS
Fabricating and fixing TYPE-01 Anodized Aluminium
partition with aluminium architectural sections with 10 -
15 micron coating glazed and panelled with 3mm ,
265 N-001 plastic coated ply board to both sides,at bottom and m2 6,997.00 7,600.00
4.6mm thick glass at top.(The used section SPR 105,
SPR 106, SPR 110, SPR 107, SPR 4521)
ZN/AL SHEET
Supplying & fixing 0.47mm thick colour Zn/Al. roofing
278 P-005 sheets with self drilling screws (fasteners) on frame m2 2,037.00 2,212.00
work - Frame work measured separately.
Supplying & Fixing 0.47mm thick Zn / Al sheets- Tile
profile,with self drilling Screws (Fasteners) on frame
279 P-006 m2 2,116.00 2,298.00
work -Frame Work Measured Seperatly (Single &
Double roof).
Supplying & Fixing 0.47mm thick Zn / Al sheets ,Tile
profile ,with self drilling Screws (Fasteners) on frame
280 P-007 m2 2,171.00 2,359.00
work - Frame Work Measured Seperatly) . (Hip roof)
ASBESTOS SHEETS
Supplying and fixing new asbestos roofing sheets
confirming to SLS 9 on existing framework with new
282 P-009 nut and bolts, apply two coats of emulsion paint under m2 1,901.00 2,065.00
side of sheet etc. (Frame work measured separately).
FLASHING/RIDGES/CAPPINGS
ROOF PLUMBING
Supplying and fixing Gutters 0.47mm thick colour Zn
291 P-018 /Al 457mm girth with brackets not exceeding 0.6m crs. m 1,674.00 1,819.00
rate includes for specials.
Supplying and fixing PVC gutters square type 150mm
with PVC brackets not exceeding 225mm fixed to
292 P-019 m 1,050.00 1,140.00
valance board using 20 mm wire nails, rate includes for
specials.
Fabricating and fixing Valley gutters and flashing in GI
sheets G22, including application of two coats of hot tar
293 P-020 m 1,808.00 1,964.00
and blinding with sand (timber board measured
separately) 900mm wide.
Supplying & Fixing 0.47mm thick Zn / Al Valley
294 P-021 m 1,714.00 1,861.00
gutters including Screws. Nominal girth 470mm .
Supplying and fixing class1 Timber boarding , 20mm to
25mm thick for valley gutters, flashings etc, inclusive of
295 P-022 applying two coats of wood preservative (stain) ( Only m2 5,794.00 6,294.00
up to 4.6m2 of roof area).
Pipes
Supplying and laying Pipes pvc with specials, size
301 Q-001 63mm dia. in waste water lines, vent pipes etc. (Type m 792.00 860.00
400/ Class 4)
Supplying and laying Pipes PVC with specials, size
302 Q-002 m 914.00 993.00
50mm dia. in wastes of sinks. Type 600.(PNT 7)
Supplying and laying Pipes PVC type 600 (PNT 7) with
303 Q-003 specials, size 40mm dia. in waste of wash basins. m 471.00 512.00
Water Tanks
Supplying and installing 1000 L capacity water tank
made of polymer materials of approved quality on sand
330 Q-030 nr 16,640.00 18,074.00
bed. Rate for only water tank. PVC pipes, valves,
fittings measured separately.
Supplying and installing 2000 L capacity water tank
made of polymer materials of approved quality on sand
331 Q-031 nr 29,241.00 31,761.00
bed. Rate for only water tank. PVC pipes, valves,
fittings measured separately.
Supplying and installing 500 L capacitywater tank made
of polymer materials of approved quality on sand bed.
332 Q-032 nr 10,879.00 11,817.00
Rate for only water tank. PVC pipes, valves, fittings
measured separately.
Cocks
Supplying and fixing Ball cock brass size 20mm dia.
333 Q-033 nr 1,498.00 1,627.00
heavy quality.
Supplying and fixing Ball cock plastic size 25mm dia.
334 Q-034 nr 495.00 538.00
Supplying and fixing Ball cock plastic size 20mm dia.
335 Q-035 nr 419.00 455.00
Supplying and fixing Ball cock plastic size 32mm dia.
336 Q-036 nr 669.00 726.00
Valves
Supplying and fixing Gate valve ,brass, size 20mm dia.
337 Q-037 nr 1,530.00 1,662.00
heavy quality.
Supplying and fixing Gate valve, brass, size 32mm dia.
338 Q-038 nr 2,066.00 2,244.00
heavy quality.
SECTION R - MECHANICAL
INSTALLATIONS
Split type air conditioning machines
Supply and installation of 12000BTU split type air
351 R-001 conditioner (Non-inverter type) unit in working nr 108,958.00 118,351.00
order.(Up to 5m Piping & casing Installation)
Supply and installation of 12000BTU split type air
352 R-002 conditioner(Inverter type) unit in working order.(Up to nr 122,252.00 132,791.00
5m Piping & casing Installation)
Supply and installation of 18000BTU split type air
353 R-003 conditioner ( Non Invertor type) unit in working nr 142,935.00 155,257.00
order.(Up to 5m Piping & casing Installation)
Supply and installation of 18000BTU split type air
354 R-004 conditioner (Inverter type) unit in working order. (Up to nr 155,872.00 169,310.00
5m Piping & casing Installation)
Supply and installation of 24000BTU split type air
355 R-005 conditioner ( Non Invertor type) unit in working order. nr 148,638.00 161,452.00
(Up to 5m Piping & casing Installation)
Supply and installation of 24000BTU split type air
356 R-006 conditioner (Inverter type) unit in working order. (Up to nr 173,396.00 188,344.00
5m Piping & casing Installation)
Supply and installation of 36000BTU split type air
357 R-007 conditioner ( Non Invertor type ) unit in working order. nr 318,675.00 346,147.00
(Up to 5m Piping & casing Installation)
Supply and installation of 36000BTU split type air
358 R-008 conditioner ( Invertor type) unit in working order. (Up nr 539,943.00 586,490.00
to 5m Piping & casing Installation)
368 S-010 Supply and installation of 2 x 1.5 mm2 Cu/PVC/PVC + m 275.00 299.00
2.5 mm2 E cables concealed in conduits.
369 S-011 Supply and installation of 2 x 2.5 mm2 Cu/PVC/PVC + m 359.00 390.00
2.5 mm2 E cables concealed in conduits.
Supply and installation of 2 x 4 mm2 Cu/ PVC/ PVC +
370 S-012 m 552.00 599.00
4 mm2 E cables concealed in conduits.
Supply and installation of 2 x 6 mm2 Cu/PVC/PVC + 6
371 S-013 m 793.00 861.00
mm2 E cables concealed in conduits.
396 S-038 Supply and installation of 2 x 1.5 mm2 Cu/PVC/PVC + m 339.00 368.00
2.5 mm2 E cables concealed in casing.
397 S-039 Supply and installation of 2 x 2.5 mm2 Cu/PVC/PVC + m 423.00 460.00
2.5 mm2 E cables concealed in casing.
Earthing Electrodes
Supply and installation of of 4 feet Cu earth electrode
442 S-084 with 16mm diameter and other accessories in working nr 2,234.00 2,427.00
order.
Supply and installation of 5 feet GI pipe with 2 inch
443 S-085 diameter as an earth electrode and other accessories in nr 5,377.00 5,841.00
working order.
Point wiring through conduits for Socket
outlets -13A, Data & Telephone.
498 S-140 Supply and installation of 15 W CFL globe (CFL bulb nr 631.00 685.00
shall be 5 stars rated or greater) in working order.
Supply and installation of 7 W LED Globe in working
499 S-141 order (Efficacy shall be eaqual or greater than 80 lm / nr 425.00 461.00
W).
Supply and installation of recessed type 1200mm x
300mm fluorescent lamp fitting completed with polished
500 S-142 aluminium double parabolic louver and 2 numbers of nr 5,727.00 6,220.00
36 W,1200mm fluorescent bulbs in working order.
(with electronic ballest)
Supply and installation of recessed type 600mm x
600mm fluorescent lamp fitting completed with polished
501 S-143 aluminium double parabolic louver and 3 numbers of nr 5,998.00 6,515.00
18 W,600mm fluorescent bulbs in working order.
(With electronic ballest)
Supply and installation of 1200mm fluorescent lamp
fitting completed with prismatic diffuser and 1 number
502 S-144 nr 1,946.00 2,113.00
of 36W,1200mm fluorescent bulb in working order.
(With electronic ballest)
Installation of Fans
Supply and installation of of type 1( complied with SLS
814) ceiling fan 1400mm dia. complete with 5 speed
577 S-219 humfree (electrical switch size 85X85mm) regulator, nr 11,561.00 12,558.00
safety switch and safety wire in working order -
Excluding Wiring .
Supply and installation of type 1 (approved by the
engineer) wall fan with speed regulator in working order-
578 S-220 nr 15,260.00 16,575.00
excluding wiring. ( Prime cost- Rs.12120.00 *
Excluding VAT)
Supply and installation of type 1 (approved by the
engineer)of 200mm dia. exhaust fan with auto shutter in
579 S-221 nr 10,634.00 11,550.00
working order -excluding wiring. ( Prime Cost -
Rs.7676.00 * Excluding VAT)
Supply and installation of of type 1 (approved by the
engineer) 300mm dia. exhaust fan with auto shutter in
580 S-222 nr 13,680.00 14,859.00
working order -excluding wiring. ( Prime Cost - Rs.
10302.00 * Excluding VAT)
Supply and installation of type 1 (approved by the
581 S-223 engineer) Orbit fan in working order -excluding wiring. nr 19,946.00 21,666.00
( Prime Cost- 16160.00* Excluding VAT)
FLOOR FINISHES
Cement Sand Screed
Floor rendering with 1:3 cement and sand, normal
587 T-001 cement floated surface with expansion joints filled with m2 1,043.00 1,132.00
1:2 bitumen sand.( Rate including for curing)
Floor rendering with 1:3 cement and sand approved
588 T-002 coloured surface with expansion joints filled with 1:2 m2 1,255.00 1,363.00
bitumen and sand. (Rate including for curing)
62mm thick floor paved with brick, and rendering 1:3
cement , finishing smooth with gray cement floating
589 T-003 with expansion joints filled in 1:2 bitumen and sand. m2 3,322.00 3,608.00
(Rate including for brick paved with 2:5 lime mortar and
curing)
62mm thick floor paved with brick, and rendering 1:3
cement , finishing smooth with gray cement floating
590 T-004 with expansion joints filled in 1:2 bitumen and sand. m2 2,591.00 2,815.00
(Rate including for brick paved with 2:5 lime mortar
and curing). Bricks available at site.
100mm high skirting in cement and sand 1:3 projected
591 T-005 or flush to walls finished smooth with gray cement m 626.00 680.00
floating including forming groove.
100mm high skirting in cement and sand 1:3 projected
592 T-006 or flush to walls finished smooth with coloured cement m 660.00 716.00
including forming groove.
Extra over, for waxing and polishing coloured cement
593 T-007 m2 232.00 252.00
floor .
Concrete
Walls
1:1:5 cement, lime and sand plaster reveals 35mm to
602 T-016 m 363.00 394.00
150mm wide finished smooth with lime putty.
1:1:5 cement, lime and sand plaster to reveals 35mm to
603 T-017 m 293.00 318.00
150mm wide finished semi-rough.
16mm thick cement and sand 1:5 plaster to reveals
604 T-017B 35mm to 150mm wide finished semi-rough with wooden m 290.00 315.00
float.
16mm thick 1:1:5 cement, lime and sand plastering to
605 T-018 m2 1,071.00 1,163.00
walls finished smooth with lime putty.
16mm thick cement, lime and sand 1:1:5 plaster finished
606 T-019 m2 861.00 935.00
semi-rough with wooden float.
Plinth plaster 12mm thick in 1:3 cement and sand
607 T-020 m2 871.00 946.00
finished smooth with gray cement floating.
614 U-001 Supplying & fixing glass panes 3mm thick, m2 2,541.00 2,760.00
clear/pinhead, rate includes for necessary beadings etc.
Supplying & fixing glass panes 4.6mm clear / pinhead
615 U-002 m2 3,096.00 3,363.00
,rate includes for necessary beadings etc.
SECTION V - PAINTING
Plastered work
Paint emulsion two coats, after preparing and applying
616 V-001 m2 621.00 675.00
one coat of alkali resisting primer to walls.
Paint emulsion, applying one coat after cleaning and
617 V-002 m2 227.00 246.00
preparing surface.
Paint emulsion, applying two coats after cleaning and
618 V-003 m2 433.00 470.00
preparing surface .
Floor paint, applying one coat after cleaning and
619 V-004 m2 416.00 451.00
preparing surface .
Floor paint, applying two coats after cleaning and
620 V-005 m2 973.00 1,057.00
preparing surface .
Paint exterior emulsion, applying one coat after cleaning
621 V-006 m2 229.00 249.00
and preparing on surfaces .
Paint exterior emulsion, applying two coats after
622 V-007 m2 434.00 472.00
cleaning and preparing on surfaces .
Paint exterior emulsion, applying two coats for new
623 V-008 m2 671.00 729.00
walls after applying one coat of primer .
White or colour washing , applying one coat to walls.
624 V-009 m2 31.00 34.00
White or colour washing , applying one coat to walls
625 V-010 m2 73.00 79.00
after patching up and preparing surface.
White or colour washing , applying two coat to walls
626 V-011 after scraping to original plaster and patching up. m2 144.00 157.00
Manholes
Construction of manhole 600mm x 600mm x 600mm
internally complete with cement concrete 1:2:4 (20mm)
in 75mm thick base, 225mm tk.brick walls on top of
base slab and channelling & benching, 1:3 cement and
648 W-010 sand rendered in internal surfaces, 75mm thick RC. nr 21,271.00 23,105.00
cover slab r/f with 10mm tor steel @ 150mm c/c. both
ways, complete with lifting handles. Drawing
No.CPC/CS/11/04/2018/TYPE-MH/01
Soakage Pit
Construction of 1.2m diameter internal fully built type
soakage pit, built up 225mm thick brick work in 1:8
cement ,sand mortar invert depth from ground level
3.0m,on 225mm x 150mm ring beam 1:2:4(20mm)
concrete mix, including 1:3 cement,sand plaster
652 W-014 finished smooth with neat gray cement (0.9m invert nr 150,109.00 163,050.00
depth only) & 100mm high 1:2:4(20mm ) concrete ring
pad above ground level, complete with 75mm thick
RCC cover slab with lifting handle.All as per detail
drawing No.CPC/CS/11/04/2018/TYPE-SP/03.
Septic tank
Construction of septic tank for 30 persons. as per detail
drawing No. CPC/CS/11/04/2018/TYPE-SEPT/01-(i)
655 W-017 nr 178,847.00 194,265.00
and CPC/CS/11/04/2018/TYPE-SEPT/01-(ii)
SPECIAL ITEM
Supplying and laying type 400 pvc 110mm for sewer
line in medium soil, joints embedded in 1:3:6(40mm)
661 W-023 concrete including necessary excavation, back filling, m 1,272.00 1,382.00
and compaction, invert depth up to 600mm.
MISCELLANEOUS / GENERAL
Turfing
Cutting turf sods, loading to hand carts and transporting
up to 30 m, laying and watering for 30days. (Royalty for
670 X-005 m2 397.00 432.00
turf sods, and transport beyond 30m paid separately)
Fencing
Fence Barbed wire , 7strands 14 BWG with 4 points at
75mm crs and R.C.C posts 1:1 1/2:3 (20mm) concrete
1.70m high and section 150mm x 150mm at bottom and
100mm x 100mm at top, at 2.4m c/c , r/f with 4 nos
6mm dia. MS rods with 14BWG wire stirrups at 150mm
672 X-006 crs. Rate to include for excavation,1:3:6(40mm) cement m 2,176.00 2,363.00
concrete foundations to all posts and providing
straightening bolts with washers and nuts.All as per
detail drawing No .CPC/CS/11/04/2017/Type-ST/05
Bricks 1750
Metal /Rubbel 1600
0.58 0.70
Concrete Block 1800
Sand 1600
Steel 7850
Timber 750
Asbestos sheet 1900 1.35 1.70
Cement 1440
Lime 640
Soil Testing
1 S1 Particle Size Distribution Test 3,250.00
2 S2 Field Density Test 3,500.00
3 S3 Consolidation Test 15,400.00
4 S4 Direct Shear Test 11,300.00
5 S5 Hand Auger Investigation/meter length 1,600.00
6 S6 Atterbergs Limit Test 4,250.00
7 S7 Moisture Content Test 950.00
8 S8 Standard Compaction Test(Proctor) 5,850.00
9.2
Beyond 7.2m Depth 2,100.00 /m depth
Mobilization Charge :-
9.3 From 5km to 30km 5,500.00
9.4 From 30km to 100km 10,500.00
10 S10 Sieve Analysis (Soil) 3,250.00
11 S11 Califonia Bearing Ratio of Soil (CBR) 4,900.00
12 S12 DCP 5,650.00
13 S13 Modified Compaction Test 5,250.00
Aggregate test
14 A1 Aggregate Gradation Test 3,150.00
15 A2 Aggregate Flakiness Index Test 3,050.00
16 A3 Aggregate Elongation Test 2,650.00
17 A4 Sieve Analysis (ABC) 3,150.00
18 A5 Aggregate Impact Value 3,180.00
19 A6 Loss Angeles Abrasion Value 5,160.00
Concrete test
Page
- i to xv
GENERAL NOTES
- TRANSPORT -70 to 72
SECTION 1
- EXCAVATION ROADWAY AND -73 to 74
SECTION 2 FOUNDATION EXCAVATION
I
Highways Schedule of Rates – 2021
Provincial Road Development Authority
Central Province
General Notes
02 This Highways Schedule of Rates is prepared to use for works under the preview
of Provincial Road Development of Central Provincial Council Road sector.
03 In case, the resources are available at lesser rates depending on area and locality,
the Engineer shall use such rates in the BOQ for the preparation of Estimates
providing reasons.
04 Work has to be carried out as per (i) Slandered Specifications for Construction &
Maintenance of Roads and Bridge (S.S.C.M), issued by the Department published
by Road Development Authority – Ministry of Highways – Sri Lanka in 1989.
05 The description of all items in the bills shall briefly conform to that in the relevant
items appearing in this schedule so as to avoid any ambiguity. Control of material
and measuring & paying shall be carried out as per S.S.C.M. 104 to 106.6 However
provision for control of traffic and safety measures for the road users are not
included under such items rate shall be provided separately and paid on approved
S.S.R or on closely monitored work.
08 Certain items like extensive patching for maintenance etc. requires the prior
approval from CE. /General Manager.
I
09 Special schedule of rates have to be approved by the General Manager Road for
item that do not appear in this Highway Schedule of Rates.
All suitable earth, rock, steel or precast material and components available or
recovered from road excavation or demolition works shall be utilized in
construction work with the approval of the Chief Engineer and surplus disposes
as directed. In the case of bridge reconstruction works all bridge components such
as steel girders, deck plates, and reinforcement etc., which are dismantled, shall be
recovered and repaired for re use, these items should be taken to an inventory by
the Executive Engineer and kept stock under good care for reuse.
In the cause of rock blasting Material should be piled and taken to an inventory By
the Executive Engineer before authorizing for payments.
11 Transport
11.1 The rates for “transport” include all modes of transport up to maximum distance of
the stipulated range.
11.2 The most economical mode of transport shall always be adopted in transporting
materials. The rate of payment for transport shall be made under any relevant item
selected from code. T1-001 to T1-003b irrespective of the type of vehicles is used
11.3 The rates for transport including up to the maximum distance stipulated.
11.4 The rate for transport steel and cement in shall always be paid separately unless
otherwise directed.
11.5 Transport of aggregate, soil, Emulsion and premix materials shall always be paid
separately unless otherwise directed.
11.6 Rate for rubble transport up to 3 m shall be selected from item code T1-002 to T1-
003b supported with justifiable reasons.
II
12 Excavation (S.S.C.M. 301-303)
The rates given in this schedule if not otherwise stated are intended for manual
excavation
12.2 The rates are included for excavation and loading or depositing up to 30 meters.
Transport of excavated material more than 30 meters shall always be paid
separately unless otherwise directed. In case of foundation excavation for structure,
backfilling and compaction to be considered separately unless otherwise specified.
12.3 Additional excavation required for working space shall be decide by the Engineer
and shall be paid at the same rate applicable to the item.
12.5 Similarly for Roadway Excavation with quantities more than 300 cu.m, rates given
under item codes E1-027, E1-028 and E1-029 shall be adopted. When deviation
from above rates in necessary, -payments shall be made on approved S.S.RR Based
on actual site records (machine hours) or on work studies carried out under close
supervision by the Engineer, after obtaining of the Technical Committee.
12.6 The rates include for excavation and loading or depositing up 25 meters. Transport
of excavated material more than 25 meters shall always be paid separately unless
otherwise directed. In case of foundation excavation for structure, backfilling and
compaction to be considered separately unless otherwise specified.
12.7 Construction of cofferdams that are necessary shall be paid separately. (S.S.C.M.
3002.6) Rates under items ST1-018, ST1-019, & ST1-020 are not applicable for
bridge construction work. For bridge works, it shall be payable on SSRR based on
closely monitored work studies or on day works at HSR/ machine hours,
depending on the site condition.
12.9 Rates under Items E1-001 to E1-019 are not applicable for the excavation for
foundation of bridge structure. Payment for such excavation shall be made on
approved S.S.RR based on closely monitored work studies or on day works at
HSR/ machine hours, depending on the site conditions.
III
12.10 Trench excavation for utility services and reinstatement shall be according to
S.S.C.M. 305 and shall be read in conjunction with the procedure to be followed by
agencies when trenching highways. Under no circumstances pedestrians and traffic
using the road shall be allowed to suffer or inconvenienced due to trenching work.
Adequate notice have to be given to the public necessary safety precautions have to
be taken in advance.
13.1 Except where otherwise stated, the rates include preparing depots, loading and
pilling
13.2 The rates for items Bo-302 to BO- 313 include the cost of blasting materials.
13.3 In exceptional cases such as limestone, “dug out” aggregate, special rates for items
BO shall be approved by the General Manager.
13.4 Transport of aggregate and rubble not included in the rates shall be paid
separately.
13.5 Blasting operations shall be carried out as recommended in S.S.C.M. 306 and all
works in blasting operations shall conform to the guidelines given in the National
Environmental Act. No. 47 of 1980 and any subsequent amended
13.6 Prior approval shall be obtained from the Provincial General Manager for the use
of 19 mm hand broken aggregate.
IV
14 Earth filling & compaction (S.S.C.M. 304, 400 & 600)
14.1 Approved Soil that is pilled shall be spread, watered and well compacted by rolling
as per Standard Specifications.
14.2 The rates for earth compaction include the cost of watering.
14.3 Rates given for the item EW1-003, EW1-004, EW1-005, EW1-006, EW1-007,
EW1-008 and EW1-009 on loose volume are for the work where the % density is
not specified. If the rates to be deiced on compacted volume basis, the rates for
loose volume shall be adjusted by multiplying the specified factor corresponding to
the required % density by the factor given in table below.
% Density Factor
1. For standard density not less than 95% 1.35
2. For standard density not less than 100% 1.42
14.6
(i) The normal output of earth compaction per day will be 66 Cubic Meters using 8-10
ton Road Roller
(ii) For earth work in widening of existing roads where the average width is less than
15 meters, the output of earth compaction using 8-10 ton Road Roller shall be
considered as 50 Cubic Meters per day.
14.7 Use of small compaction equipment shall be allowed only if the space is restricted
for operating 10 ton Road roller or equipment.
15.1 P1-001 to P1-004 does not include the cost of rubble, which shall be paid for
separately. The coverage of paving is as follows.
i. For pitch paving 225mm thick 026 cu.m of rubble per square Meter
V
ii. For pitch paving 150mm thick 017 cu.m of rubble per square Meter
iii. For flat paving 225mm thick 0.21 cu.m rubble per square Meter
iv. For flat paving 150mm thick 0.15 cu.m rubble per square Meter
15.2 Rubble/rip rap paving shall be carried out to avoid damages by watercourses, slip,
and slides to road embankments. Action shall be taken to include this item to
routine/periodic maintenance flood damage items.
(i) For paved roads scarified for full width and for strip metaling 14.5 to 19.7 sq.m
shall be compacted with 1 cu.m of new 50mm aggregate.
(ii) For construction of new bases and for edge correction 100sq.m shall be compacted
with 8.8-10.0 cu.m of new 50mm aggregate spread in two layers to 100mm loose
thickness.
16.2 Edge correction shall be 0.6m (approx) in width and edge strengthening shall be
1.2m (approx) in width using 100, 50, & 19 mm aggregate conforming to S.S.C.M
1103.
16.3 Strip metaling shall be considered only when the surface section to be metaled is in
narrow strips less than 1.2m in width.
16.4 For construction of new bases, where aggregate compaction of the 19mm and
50mm is required 1.0 cu.m of 19 mm aggregate is adequate for compacting with 10
cu.m of 50mm.
16.5 The normal quantities of aggregate that shall be compacted per day as follows:
(i) For full width of paved road including scarifying and/or hand picking the surface
will be 12.75cu.m of new aggregate per day (8 hours).
VI
(ii) For construction of new bases, 23.5 cu.m of new aggregate per day (8 hours).
(iii) For strip or edge correction including loading scarifying and/ or handpicking the
surface, 9.90 cu.m per day (8 hours).
(i) The rates for items from R1 – to R1 – include the necessary re transport of metal
and no further re transport could be paid.
(ii) The rates for metal consolidation include transport of water.
(iii) Certificate of payments for metal involved should be based on metal pile
measurements. .
(iv) For Extensive patching the prior approval of the Chief Engineer should be
obtained maximum quantity involving in normal patching is decided by the deputy
General Manager (Construction). .
(v) The Executive Engineer/Technical Officer will carry out of physical check of
bitumen issued to contractors.
(vi) For this analysis the grading of the base course for 1 m3 as followed.
No Material Composition
For the use at site, prior approval of CE/DD roads should be obtained for
gradation.
VII
Before certifying the payment for the item S/-001 to S/-040 a (section 7) the
technical Officer has to measure that the actual rate of application of bitumen and
the material return to be adjusted, according to rate of application.
The rate for item M1-001, M1-004 and M1-007 to M1-0013 include the necessary
re-transport of aggregate and no further re-transport costs shall be paid.
16.8 The actual scarified area (which is not necessary the bitumen surfaced area) shall be
paid for in item M1-002 & M1-003. Normally 0.3m width (approx.) shall be
reckoned as requiring scarifying for edge correction.
16.9 Tempering and sharpening for scarifies tines are included in the rates for item M1-
003 and shall not be paid for separately.
16.11 Before certifying the payment for the item S/-001 to S/-040 a (section 7) the
technical Officer has to measure that the actual rate of application of bitumen and
the material return to be adjusted, according to rate of application. It is the
responsibility of the Technical Officer to maintain the applying rate of bitumen
within the given range.
17.1 The rates exclude the cost of loading, unloading and transporting but include
spreading suitably in the vicinity unless otherwise directed.
17.2 Culvert inlets and outlets should be cleaned before and after the rains.
17.3 For clearing choked culvert (item DR1-012) with head room/ diameter less than 1
meter, day works rates shall be adopted.
17.4 Drains should be cleared before commencing any types of surfacing (S.S.C.M 501-
507)
VIII
18 Bridge, Culvert, retaining walls, ECT. (S.S.C.M 1001-1010)
Note;
(i) The cost of shuttering is not included in the rate, and shall be paid separately.
(ii) The cost of hire charge for concrete mixer is included in the rates for concrete
using mixers.
(iv) For all concrete with 19mm aggregate, crusher plant materials shall be used unless
otherwise directed.
18.2 Only sand of approved quality shall be used for cement mix, mortars &
concretes.
18.3 The rate includes the cost of transport up to 30 meters on level ground in the
relevant items. Any vertical transport required in excess of first 1.5 meters upwards
or down wards shall be separately considered.
IX
Proportion Cement Aggregate
yield sand
Description [normal mix] or in 50 / Rubble
Unit (cu.m)
No Grade Kg. (cu.m)
1 cement concrete g 40 (19 mm) cu.m 8.26* 0.46* 0.79*
2 cement concrete g 30 (19 mm) cu.m 7.16* 0.48* 0.80*
3 cement concrete g 25 19 mm) cu.m 7.16* 0.50* 0.79*
g 25 (37.5mm+19 37.5=0.62*
cement concrete cu.m 5.86* 0.46*
4 mm )70% 30% 19.0=0.27*
5 cement concrete g 20 (19 mm ) cu.m 6.04* 0.53* 0.79*
6 cement concrete 1:1 ½:3 (19 mm) cu.m 8.12 0.60 0.91
7 cement concrete 1:2:4 (19 mm) cu.m 5.65 0.60 0.90
8 cement concrete 1:2:4 (37.5 mm) cu.m 5.65 0.60 1.00
9 cement concrete 1:3:6 (19 mm) cu.m 4.38 0.60 0.91
10 cement concrete 1:3:6 (37.5 mm) cu.m 4.38 0.60 1.00
11 cement concrete 1:4:8 (19 mm) cu.m 3.18 0.60 1.00
12 12.5 mm cement
1:2 mix sq.m 0.15 0.013 -
render
13 19.0 mm cement
1:2 mix sq.m 0.23 0.020 -
render
14 12.5 mm cement
1:3 mix sq.m 0.12 0.016 -
render
15 19.0mm
1:3 mix sq.m 0.19 0.024 -
cement render
Random Rubble
16 masonry in
1:6 mix cu.m 0.40 1.10
cement/sand
mortar
The above mix proportion for Grade concrete is given for estimation purposes.
The actual proportion for Grade concrete shall be directed by mix designs at sit
and the rates shall be adjusted with the approval of the Provincial General
Manager.
X
18.7 Ready mixed concrete;
Ready mix concrete shall be used only on the written approval of the General
Manager and for the procumbent of the material government tender procedure
The contractor for ready mix concrete shall be a copious supplier having minimum
of one year experience of supplying ready mix concrete to project acceptable to the
tender board and shall have sufficient & pumping facilities, laboratory facilities for
quality control and qualified staff.
Generally for 74.5 sq.m of 50mm thick compacted wearing surface, the quantities
of material required will be 3.5 cu.m 19mm to 3.2mm graded aggregate, 2.3cu.m
sand and 381 liters Bitumen and 91 liters of kerosene. If Emulsion is used, the
quantity of material required is 500 liters of Emulsion and 273 liters of water.
(ii) The rates include the cost of pipe, collars, rolling up to the distance of 30m
lowering to bed up to 1.8 meter depth, aligning and fixing.
(iii) Excavation and backfilling of trench is not included in the rates unless otherwise
mentioned.
19.1 All labour, plant, equipment and materials have to be provided by the contractor.
19.2 The Engineer should maintain performance records of all types of machinery for
future reference.
All traffic signs, kerbs, parapets, guardrails, barricading and Km posts should be
painted at least once a year.
XI
21 Quality control work; (S.S.C.M. 1600)
21.1 Special attention should be made to control the alignment, thickness and surface
regulation of pavement layers as per section 1601 of the S.S.C.M.
a. For the projects where the Total Cost Estimate (TCE) is less than or
equal 03 million rupees
Overheads & profit margin is taken as 26% of the basic rate.
Where,
Item Overhead Type Percentage
No
A Site Overhead 16%
B Profit 10%
Total Overhead & Profit 26%
Table-01
XII
Item Site Overhead Percentage
No
Table-03
Overheads Rate = Basic Rate + Overheads & Profit Margin
b. For the projects where the Total Cost Estimate (TCE) is over 03 million
rupees
Separate preliminary bill shall be included (Applicable site overhead
percentages for the preliminary bill shall be taken from table -03)
Overheads & profit margin is taken as 16% of the basic rate.
XIII
Item
No Overhead Type Percentage
A Site Overhead 6%
B Profit 10%
Total Overhead & Profit 16%
Table-02
Table-04
Method of Measurement
I. The Bill of Quantities have been generally prepared in accordance with principles of
the Standard Method of Measurements for Building works in Sri Lanka (SLS 573
1999)
Head transport rates given in Irrigation rate have to be taken for slop angle less
than 20 in hilly areas, when the slop angle exceeds 20o the head transport to be
referred to central provincial price committee report 2020. However, considering
site condition, engineer can decide the necessary Head transport.
XIV
II. A Confidential document and to be used for Central provincial council work only
IV. Additional should be prepared for any item deviate from the description or not
listed based on Irrigation rate Annalise / work study
Length 1m 3.281 ft
1 Cu.ft 0.028 m3
1 Sqrs 9.29 m2
1 cub 2.831 m3
1 sq.ft 0.092 m2
1 lb 0.453 Kg
1 cwt 50.802 Kg
1 gal 4.546 l
23 HSR Analysis is for internal use only. It cannot be produced in Court of law
as reference/ authority and thus is a privilege document.
XV
HIGHWAY SCHEDULE OF RATES-2021
Section 1 - Transport
See Section 1 of General Notes for Selection of Mode of Transport
2 T1-002 Transport of Sand, Soil and Metal upto 10 Km (Bulk) Cu.m 353.00 444.78
3 T1-003 Transport Sand, Soil and Metal Beyond Every Each 1Km (Bulk) Cu.m 25.80 37.80
22 T1-014 Unloading Barrels of Bitumen Inclusive of Rolling and Stacking Brls 15.65 17.00
44 T1-036 Loading and Unloading 152mm diameter 2.44m Long Hume Pipes No 113.00 122.50
45 T1-037 Loading and Unloading 229mm diameter 2.44m Long Hume Pipes No 131.50 143.00
46 T1-038 Loading and Unloading 305mm diameter 2.44m Long Hume Pipes No 261.00 283.50
47 T1-039 Loading and Unloading 457mm diameter 2.44m Long Hume Pipes No 434.50 471.50
48 T1-040 Loading and Unloading 610mm diameter 2.44m Long Hume Pipes No 566.00 615.00
65 T1- 052B Transport of steel each Subsequent 1.0 km to 9.0 km by any means 50kg 1.74 1.92
66 E1-001 Excavation in Loose Soil (Dry) [SSCM 301.2(IV)] Cu.m 811.00 881.00
67 E1-002 Excavation in Loose Soil (Wet) in Slips [SSCM 301.3(0)] Cu.m 1,000.00 1,085.00
Excavation in Ordinary Soil (Cutting Measurement) [SSCM
68 E1-003 Cu.m 1,190.00 1,290.00
301.2(V)]
Excavation in Ordinary Soil [Vehicle Measurement] [SSCM
69 E1-004 Cu.m 1,045.00 1,135.00
301.2(V)]
Excavation in Medium Soil (Cutting Measurement) [SSCM
70 E1-005 Cu.m 1,565.00 1,700.00
301.2(VI)]
Excavation in Medium Soil (vehical Measurement) [SSCM
71 E1-006 Cu.m 1,330.00 1,445.00
301.2(VII)]
Excavation in Hard Soil (Cutting Measurement) [SSCM
72 E1-007 Cu.m 2,325.00 2,525.00
301.2(VII)]
Excavation in Hard Soil (Vehicle Measurement) [SSCM
73 E1-008 Cu.m 1,975.00 2,145.00
301.2(VII)]
Excavation in Unclassified Soil (Cutting Measurement) [SSCM
74 E1-009 Cu.m 1,695.00 1,840.00
301.2 a(1)]
Excavation in Soft Rock (Cutting Measurement) [SSCM
75 E1-010 Cu.m 2,510.00 2,730.00
301.2(VII)]
Excavation in Mud\Marshy Material (Cutting Measurement)
76 E1-010A Cu.m 1,945.00 2,115.00
[SSCM 301.2(VII)]
Excavation Pit\Trench for Foundation in Ordinary Soil not
Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
77 E1-011 Cu.m 1,565.00 1,700.00
Exc. Material Deposited within 25m or as Directed. [SSCM 301.1-
.3]
Excavation Pit\Trench in Foundation in Medium Soil not
Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
78 E1-012 Cu.m 1,945.00 2,115.00
Exc. Material Deposited within 25m or as Directed. [SSCM 301.1-
.3]
82 E1-019 Excavation Soft Rock not Exceeding 1.5m depth [SSCM 301.2(II)] Cu.m 3,080.00 3,345.00
88 E1-025A Hard Rock Blasting Use for chemical Cu.m 13,280.00 14,425.00
89 E1-025B Hard Rock Blasting Use for chemical & Piling Cu.m 14,770.00 16,044.53
90 E1-026 Rock Requiring Blasting and Piling (Bank Measurement) Cu.m 5,600.00 6,085.00
Roadway Excavation in Unclassified Soil Using Machinery
91 E1-027 Cu.m 172.00 187.00
Excluding Loading and Piling (Cutting Measurement)
Loading Materials by Machinery in Roadway Excavations (Cutting
92 E1-028 Cu.m 211.50 230.00
Measurement)
93 E1-029 Trimming / Cambering by Motor Grader (Cutting Measurement) Cu.m 40.75 44.25
94 E1-029A Trimming / Cambering by Motor Grader (Cutting Measurement) Sq.m 8.15 8.85
96 A1-002 Blasting etc and Piling 150-225mm Rubble including Loading Cu.m 4,590.00 4,990.00
Blasting Sledging etc. and Piling 150-225mm Rubble using
97 A1-002A Cu.m 3,270.00 3,550.00
Compressor and Hand Held Drills including Loading
98 A1-003 Blasting etc. and Piling 100mm Aggregate including Loading Cu.m 5,050.00 5,485.00
99 A1-004 Blasting etc and Piling 75mm Aggregate incl/Loading Cu.m 5,810.00 6,310.00
100 A1-005 Blasting etc and Piling 50mm Aggregate incl/Loading Cu.m 6,940.00 7,540.00
101 A1-006 Blasting etc and Piling 37.5mm Aggregate incl/Loading Cu.m 8,075.00 8,775.00
102 A1-007 Blasting etc and Piling 25mm Aggregate incl/Loading Cu.m 9,965.00 10,825.00
103 A1-008 Blasting etc and Piling 19mm Aggregate incl/Loading Cu.m 14,125.00 15,344.67
50 mm Aggregate, Single Size Crusher Production Including
104 A1-009 Cu.m 2,040.00 2,215.00
Loading[SSCM 404.1-406.1 : Table 1701-4
37.5 mm Aggregate, Single Size Crusher Production Including
105 A1-010 Cu.m 2,725.00 2,960.00
Loading [SSCM 404.1-406.1 : Table 1701-4
19 mm Aggregate, Single Size Crusher Production Including
106 A1-011 Cu.m 3,250.00 3,530.00
Loading [SSCM 404.1-406.1 ]
12 mm Aggregate, Single Size Crusher Production Including
107 A1-012 Cu.m 2,610.00 2,835.00
Loading [SSCM 404.1-406.1 : Table 1701-4
Aggregate 37.5 mm Down Graded (SSCM-Table 1701.5 )
108 A1-013 Cu.m 2,725.00 2,960.00
Including Loading
109 A1-014 Crusher Fines 6.3 mm Down, Including Loading for 1.0 cu.m Cu.m 2,090.00 2,270.00
110 A1-014A Crusher Fines (DUST), Including Loading for 1.0 cu.m Cu.m 1,845.00 2,005.00
Aggregate 19 mm for Seal Coat Treatments as per SSCM Table
111 A1-015 Cu.m 3,250.00 3,530.00
1701-8, Including -Do-
Aggregate 12.5 mm for Seal Coat Treatments as per SSCM Table
112 A1-016 Cu.m 4,060.00 4,410.00
1701-8, Including -Do-
Blended aggregate for Rectification overlay, with 37.5 mm Single
size Aggregate and 19mm &12.5 mm Crushed Aggregated Mixed
113 A1-017 Cu.m 3,435.00 3,730.00
in the volume Ratio of 7:2:1: Including Mix. & Loading (Piling to
pay Separately)
114 A1-018 Piling Available Aggregate Cu.m 210.00 228.00
132 P1-002 Pitched Paving 150 mm Thick -do - Sq.m 384.00 417.00
133 P1-003 Flat Paving 150 mm Thick - do-- Sq.m 256.00 278.00
134 P1-004 Flat Paving 225 mm Thick - do-- Sq.m 340.50 370.00
199 S1-040A Sand sealing with emulsion crs-2 - Part A of Item S1-040 Sq.m 86.00 93.50
202 MN-003 Patching With hot Bitumen Using 28 Ltrs. Per 1/2 K.m. 1/2 K.m 6,655.00 7,230.00
203 MN-004 Patching With hot Bitumen Using 35 Ltrs. Per 1/2 K.m. 1/2 K.m 8,320.00 9,040.00
204 MN-005 Patching With hot Bitumen Using 42 Ltrs. Per 1/2 K.m. 1/2 K.m 9,985.00 10,845.00
205 MN-006 Patching With hot Bitumen Using 49 Ltrs. Per 1/2 K.m. 1/2 K.m 11,650.00 12,655.00
206 MN-007 Patching With hot Bitumen Using 56 Ltrs. Per 1/2 K.m. 1/2 K.m 13,315.00 14,460.00
207 MN-008 Extensive Patching for Every Additional 7 Ltrs. Hot Bitumen 1/2 K.m 1,665.00 1,810.00
208 MN-009 Patching with Cold Bitumen (CRS-1) Using 14 Ltrs per 1/2 K.m. km 2,140.00 2,325.00
209 MN-010 Patching with Cold Bitumen (CRS-1) Using 21 Ltrs. Per 1/2 K.m. 1/2 K.m 3,215.00 3,490.00
210 MN-011 Patching with Cold Bitumen (CRS-1) Using 28 Ltrs. Per 1/2 K.m. 1/2 K.m 4,285.00 4,655.00
211 MN-012 Patching with Cold Bitumen (CRS-1) Using 35 Ltrs. Per 1/2 K.m. 1/2 K.m 5,355.00 5,815.00
212 MN-013 Patching with Cold Bitumen (CRS-1) Using 42 Ltrs. Per 1/2 K.m. 1/2 K.m 6,425.00 6,980.00
213 MN-014 Patching with Cold Bitumen (CRS-1) Using 49 Ltrs. Per 1/2 K.m. 1/2 K.m 7,495.00 8,140.00
214 MN-015 Patching with Cold Bitumen (CRS-1) Using 56 Ltrs. Per 1/2 K.m. 1/2 K.m 8,565.00 9,305.00
219 DR-002 Cutting New Side Drains in Med. Soil Cu.m 1,520.00 1,650.00
220 DR-003 Cutting New Side Drains in Hard Soil Cu.m 1,940.00 2,105.00
221 DR-004 Cutting New Side Drains in Soft Soil Cu.m 2,150.00 2,335.00
222 DR-005 Cutting New Side Drains In Unclassified Soil Cu.m 1,520.00 1,650.00
Cutting side drains of std. Dimensions in unclassified soil using
223 DR-005A machine (Back hoe J.C.B) including shipping trimming and Cu.m 732.00 795.00
leveling bottom manually
224 DR-006 Cutting New Side Drains in Rock Cu.m 4,180.00 4,540.00
Turfing (Excluding Royalty, Transport and Watering Maintenance)
225 DR-007 Sq.m 232.00 252.00
[SSCM 802.3 (a)]
Watering and Maintaining Turf For Three Months Including
226 DR-008 Sq.m 294.50 319.50
Transport of Water
227 DR-009 Leveling & Trimming Earth Sq.m 31.00 33.75
228 DR-010 Clearing Silt Etc. from Kerbs & Channels (SSCM 12053) L.m 18.50 20.10
Cutting Scupper Drains on any Soil Other than Rock to and
229 DR-011 Average width of 0.75 m with proper Gradient and Ave. Depth of L.m 136.50 148.00
100 mm (SSCM 1304.3)
230 DR-012 Clearing and Desilting of Culverts (SSCM 1303.3) L.m 382.00 415.00
231 DR-013 Clearing Choked Culverts (With Head Room > 1m.) Cu.m 1,565.00 1,700.00
Cleaning desilting existing side drains and lead up drains to proper
232 DR-014 shape and gradient and transport of excavated materials from road L.m 46.50 50.50
side up to 100m
233 DR-015 Clearing Inlets and Outlets of Culverts Culverts 344.00 374.00
Forming Weep Holes Using P.V.C. Pipes of Int. Dia. Not less than
250 ST-017 L.m 713.00 775.00
100mm Complete with Dripledge and Surround Finish Smooth.
254 ST-021 Lifting Soil For Every 1.5 m Beyond the Initial 1.5m Cu.m 756.00 821.00
255 ST-022 Lifting Wedge Stones For Every 1.5 m Beyond the Initial 1.5m Cu.m 2,270.00 2,465.00
256 ST-023 Lifting Rubble or Concrete Every 1.5 m Beyond the Initial 1.5m Cu.m 1,135.00 1,230.00
258 ST-025 Lowering Rubble or Concrete Every 1.5m Beyond the Initial 1.5 m Cu.m 756.00 821.00
261 ST-028 Rendering 19 mm thick in cement sand Motar 1:2 mix (Rough) Sq.m 1,235.00 1,340.00
263 ST-030 Rendering 12.5 mm thick in cement sand Motar 1:3 mix (Rough) Sq.m 872.00 947.00
265 ST-032 Rendering 19 mm thick in cement sand Motar 1:3 mix (Rough) Sq.m 1,205.00 1,310.00
Mixing & Laying Manually Cement Concrete 1:4:8 (50 mm) with
269 ST-036 20% Plums (Volume Batching) Using Crusher Run Aggregate Cu.m 13,500.00 14,660.00
(excl. Transport of Aggregate & Piling)
289 ST-054 Fabricate & Lay M.S Bars as Reinforcement (Excl. Transport) kg 321.50 349.50
290 ST-055 Fabricate & Lay Tor Steel as Reinforcement (Excl. Transport) kg 321.50 349.50
317 ST-082 Supplying & Fixing 31 mm Thick Deck Planks of Class I Timber No 5,825.00 6,330.00
323 ST-088 Cleaning, Wire Brushing & Applying Tar on Steelwork, One Coat Sq.m 246.00 267.50
Cleaning, with Cotton Waste and Painting Steel Work with Enamel
324 ST-089 Sq.m 208.50 226.50
Paint, One Coat
Supplying and Fixing M.S. Dowels Spliced and Dove Tailed with
333 ST-098 Wedge at One End, 16mm dia, and 1m long, Boring Holes to 0.3m No 1,005.00 1,090.00
Depth in Fixing
Supplying and Fixing M.S. Dowels, Spliced and Dove Tailed with
334 ST-099 Wedge at One End, 20mm dia, and 1m Long, Boring Holes to No 1,245.00 1,355.00
0.3m Depth in Fixing.
Supplying & Fixing M.S.Dowels, Spliced and Dove Tailed with
335 ST-100 Wedge at One End, 25mm dia, and 1m Long. Boring Holes to No 1,665.00 1,805.00
0.3m Depth in Fixing.
367 RF-003 Painting White Back Ground on Parapets etc. & Stencilling nos. No 352.50 383.00
Casting STD K.M. Stones with R.C.C. [1:2:4(19 mm) & cement
369 RF-005 No 7,345.00 7,980.00
282.5 KG/Cu.m ] including curing, for "A" and "B" Class Roads
Casting STD K.M. Stones with R.C.C. [1:2:4(19 mm) & cement
370 RF-006 No 4,905.00 5,330.00
282.5 KG/Cu.m ] including curing, for "C" and "D" Class Roads
371 RF-007 Fixing Standard Type K.M. Stones in Any Soil No 2,005.00 2,175.00
Fixing new or Refixing Type Guard stones in Cement Concrete
372 RF-008 [1:3:6(37.5mm) and Cement 219 KG/Cu.m ] With Min. Cover No 949.00 1,030.00
75mmx 300 mm Depth
Casting Standard Type Guard Stones in Concrete [1:2:4(19mm) &
373 RF-009 No 2,500.00 2,715.00
Cement 282.5 KG / Cu.m]
375 RF-009P Casting Standard Type Guard Stones-Part 1of RF-009A No 7,630.00 8,285.00
376 RF-009Q Casting Standard Type Guard Stones-Part 2 of RF-009A No 833.00 905.00
377 RF-009R Casting Standard Type Guard Stones-Part 3 of RF-009A No 95,119.00 103,319.00
Section 13 - Miscellaneous
Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.
396 MS-001 Cu.m 16,510.00 17,930.00
Transport of Aggregate) (Site Made)
Patching Shallow Pot Holes. Depth Less 20mm using hot bitumen
1.2ltr/Sq.m & 12.5mm chips single size @ 13.75 cu. deci m/sq.m
398 MS-002 Sq.m 263.50 286.50
incld. hand tamping (rat. inc. cost of bitumen & mater.) (Excl.
Transport. of Aggregate & Bitumen)
Patching road with premix after preparing surface with 30% cut
399 MS-002A Cu.m 11,750.00 12,760.00
back
400 MS-002B Patching road with premix after preparing surface Cu.m 10,850.00 11,785.00
Patching Shallow Potholes, Depth Less Than 20mm Using 10-20%
Cutback Bitumen 1.2ltr/Sq.m and 12.5mm Chips, Single Size at
401 MS-003 Sq.m 276.00 300.00
13.75 CuDeci m/Sq.m including hand tamping (Excl. Tr. Agg,
Bitumen )
402 MS-003A Patching Shallow Potholes, Part 1 of Item No MS-003 ltr 93.25 101.00
Patching shallow pot holes, depth less than 20mm using emulsion
(Crs1) @ 1.2Ltr/Sq.m & 12.5mm cu.deci m/sqm including hand
403 MS-004 Sq.m 236.50 257.00
tamping transport of emulsion to site etc. Rate include cost of
emulsion and other materials) (Excl. transport of aggregate)
407 MS-005C Patching Potholes of Medium Depth - Part 3 of Item MS-005 Cu.m 17,600.00 19,120.00
Patching pot holes more then 75mm deep with water bound gravel
material using 50mm or 12.5 mm single size aggregate along with
411 MS-009 Sq.m 74.50 80.75
useable old aggregate obtain from picking and preparation of
surface inc. laying watering Spreading gravel of approved quality
422 MS-016B Correcting and Strengthening Edges Part B of the Item MS-016 Sq.m 2,185.00 2,370.00
426 MS-019A Patch Sealing of Pitted Surface, Part A of Item MS-019A Sq.m 18,660.00 20,270.00
427 MS-019B Patch Sealing of Pitted Surface, Part B of Item MS-019A Sq.m 65.75 71.25
474 SV-003 Supply of Skilled "A" Grade Labour Days 3,480.00 3,780.00
475 SV-004 Supply of Skilled "B" Grade Labour Days 2,900.00 3,150.00
476 SV-005 Clearing jungle (Light) to a Width of 1.22 meters for Survey work km 7,975.00 8,665.00
478 SV-007 Clearing jungle (Heavy) to a Width of 1.22 meters for Survey work km 15,950.00 17,330.00
479 SV-008 Supply of Labour for Chaining and Cutting Pages and Pegging km 2,215.00 2,405.00
481 SV-010 Surveying Including Fixing Pickets & Taking Angles km 4,430.00 4,815.00
482 SV-011 Changing Traverse Lines and Taking off-sets km 5,910.00 6,415.00
2021
PREPARED BY
PROVINCIAL IRRIGATION DEPARTMENT
CONTENTS
IRRIGATION SCHEDULE OF RATES
Page
- i to xii
GENERAL NOTES
- DEMOLISHER -98
SECTION I
- EXCAVATION AND EARTH -98 to 99
SECTION II WORK
Basic Rates
The basic prices prepared by the Central Provincial price committee 2021 - &
approved by the Deputy Chief Secretary (Engineering Services) are used to prepare
the IRRIGATION RATES- 2021.
General Notes
Only those materials which are specially mentioned in the descriptions should be
used and should be the best quality material, confirming to the requirements of the
relevant standard. (SLS or BS)
All the materials & the quality of the material should be approved by the Engineer,
described in the agreement.
Working Rates of this Irrigation Rate are calculated as follows
i
Profit margin – 10 %
Following are the breakup of overheads
For Total Cost Estimate is above 10 million
General overheads
1. Head office and rent, lights, telephone, stationery suppliers,
furniture etc. for same 0.6 %
2. Salaries of Head office Manager, Engineers, Technical assistances,
Draughtmen, Clerks, Stenos, Typists, Minor staff and Drivers 1.2 %
3. Transportation and subsistence of head office staff 1.0 %
4. Insurance, interest, and taxes on business 0.4 %
5. Legal expenses and consultancy fees 0.2 %
6. Workshop and yard rents, sheds, garages and supplies 2.2 %
7. Salaries of workshop and yard storekeepers, drivers,
foremen, mechanics and workmen 0.4 %
Total 6.0%
ii
9. Wages of job office staff 1.2%
10. Transportation of job office staff 0.4 %
11. i. Bonds for bid performance and fidelity Guarantee 0.3 %
ii. Insurance of work and workmen’s compensation 0.5 %
12. Interest in Capital Investment 1.6 %
Total 16.0%
Method of Measurement
The Bill of Quantities have been generally prepared in accordance with principles of the
Standard Method of Measurements for Building works in Sri Lanka (SLS 573 1999)
I. Head transport rates given in Irrigation Rate have to be taken for slope angle less than 20º
in hilly areas, when the slope angle exceeds 20º the head transport to be referred to central
provincial price committee report 2021. However, considering site condition, Engineer can
decide the necessary Head transport.
II. A Confidential document and to be used for Central provincial council work only.
IV. Additional rates should be prepared for any item deviate from the description or not listed
based on Irrigation Rate analysis/work study.
iii
EXCAVATIONS
Except as otherwise shown on the drawings or prescribed by the Engineer, open cut excavation for
foundations shall be made to the outlines and dimensions of the structures for which the foundation
is required. The Contractor shall make his own allowances for lateral excavations outside the limits
shown for foundations of the structure. Blasting operations for rock excavations shall be subject to
the requirements in clause 3.6. It shall be the responsibility of the Contractor to maintain the
stability of the excavated faces during construction by acceptable methods.
Excavated material shall be dumped sufficiently clear of the edges of excavation. The disposal of
excavated material shall be as described in Clause 3.7. Finishing of excavated surfaces shall be
done to the satisfaction of the Engineer so as to provide firm foundation upon or against which the
concrete or masonry is to be placed. Compaction of foundation by an approved method may be
required as directed by the Engineer. Rock excavation may require special blasting procedure such
as cushion blasting or pre- splitting as approved by the Engineer to ensure sound, unsheltered rock
after excavation. After blasting, scaling and trimming shall be done to remove slugger, weathered
and dummy rock and the loosened rock shall be removed by chiseling, picking, sledging and
barring. The final rock foundation surfaces shall present a rough outline and shall be free from steep
angles and sharp projections.
After preparation of the entire area to be occupied by the dam as described in Clause 5.1, a cut-off
trench shall be excavated in the dam embankment foundation to the established lines and grades as
shown on the drawings and /or as directed by the Engineer and all unsatisfactory and loose material
shall be removed to the extent directed by the Engineer. The removal of boulders may be required.
Disturbed foundation at the established level shall be corrected by approved compaction so that the
foundation has a dry unit weight not less than that in the disturbed condition. The longitudinal
slopes of the excavated trench in common material shall not be steeper than 3 horizontal to 1
vertical.
Rock excavation may require special blasting procedures such as cushion blasting or pre-splitting as
approved by the Engineer to ensure sound un-shattered rock after excavation to required level.
Accurate trimming of the slopes of excavations will not be required, but the other operations
described in Clause 3.6 to be done as closely as practicable to the established lines and grades.
The rock foundation shall not have a slope greater than the angle of friction of the rock neither
along nor across the dam axis. Where slopes are steep, the rock shall be benched to give near
horizontal seating, the benches themselves having downward slopes of 1:10 towards the upstream.
The alignments and cross-sectional dimensions shown on drawings will be subject to change by the
Engineer to adopt the foundation to the conditions disclosed by the excavation.
iv
3.3 Excavation for Canals
Canals shall be excavated to the specified width, depth, side slopes and gradient shown on the
drawing and/or established by the Engineer and shall be finished uniformly to the prescribed lines.
Rock excavation may require special blasting procedure such as cushion blasting or pre-splitting as
approved by the Engineer to ensure sound, un-shattered rock after excavation. In so far as
practicable, the finishing operations after blasting as described in Clause 3.6 required on canals.
MATERIALS
When drawings identifying borrow areas and/or quarries are not furnished by the Engineer, the
Contractor shall submit for the approval of the Engineer his proposals for the sources of
construction materials complying with these specifications. Approval of any borrow area/quarry
shall not be considered as approval of all excavations from the borrow area/quarry. Each part
excavated from the approved borrow area/quarry shall be subject to further approval by the
Engineer.
The location of any borrow area shall be subject to the requirements given below.
i. Borrow areas, as far as possible, shall not be located on the downstream of the dam.
ii. Borrow area located near the dam, shall be at a distance not less than three times the height
of the dam between the toe of the dam and edge of the borrow area.
Borrow areas adjacent to primary canals shall be located within the canal reservation adjacent to the
Operation and maintenance bund road/road reservation so that such borrow area could be connected
to function as road drains. Borrow areas may also be located on high ground in the vicinity of the
secondary and tertiary canals.
iii. Borrow area located other than as specified in (a) and (b) above shall be at the shortest
possible haul distance.
v
Table 1
0.36 mm sieve % 08 -
2.36 mm sieve % 50 -
Liquid Limit % 0 50
Plasticity index % 0 30
Materials from approved gravel quarries shall be tested periodically for the following
characteristics:
Materials from approved sand quarries shall be tested periodically for the following characteristics.
Rock samples from approved quarries shall be tested periodically for the following characteristics.
iii. Los Angeles Abrasion Test iv. Sodium or Magnesium Sulphate Soundness Test
vi
5.4 Turfing
After the slopes of the embankment have been dressed to line they shall be scarified in the locations
to be turfed. Where required a surface dressing layer of approved top soil shall be placed on the
scarified slopes to an approved thickness. The surface prepared shall be covered with layers of turf
sod consisting of squared not exceeding 300 mm square of dense living grass-growth of approved
species. The sod shall be carefully handled during transportation to minimize loss of earth. The
squares of turf shall be laid on the required locations in close contact to the required pattern which
may consist of strips, squares, parallelograms, etc. and then tamped firmly in place. Immediately
after placing, the turfed slopes shall be watered and kept moist until plant growth has been re-
established.
9.1 Reinforcement
This section is covered in the Specifications for Buildings Works Vol. I and reference should be
made to same.
Dowels shall consist of steel bars described in Clause 9.1 and shall be of the size length and shape
shown on the drawings or as directed. Dowels shall be fixed in the locations and to depths in holes
in foundations and / or concrete as shown on the drawings or as directed.
Holes shall be drilled to receive the dowels. The diameter of the hole shall be between 1.25 to 1.5
times the diameter of the dowel bar. After drilling, the holes shall be washed and cleaned
immediately prior to filling with grout or cement – sand – mortar mixed to the consistency and
proportions specified in the drawings or as directed. The dowel bars shall be thoroughly cleaned and
forced into place in the grout before the initial set of the grout and the dowel bars shall be vibrated
or rapped until the entire surface of the embedded portions of the dowel bars are in intimate contact
with the grout. Special care shall be taken to ensure against displacement of the dowel bars until the
initial set of the grout.
10.6.1 General
All concrete Construction shall conform to Clauses 10.1 to 10.5 inclusive and to the following
requirements for the more important types of concrete Construction. All structures shall be built to
the prescribed lines, grades and dimensions. The location of all Construction joints shall be subject
to approval. All timber, metal or other accessories necessary for the completion of the structure as
shown on the drawings or as directed shall be placed and attached. The cost of such work, for which
vii
specific unit prices are not provided in the bill of quantities, shall be included in the unit prices bid
for the work to which they are appurtenant.
The dimensions of each structure shown on the drawings will be subject to such changes as may be
found necessary by the Engineer to adapt the structure to any new information or newly disclosed
conditions resulting from excavation, from hydraulic model studies, from changes in equipment,
and from further design consideration by the Engineer that unit costs will be increased or decreased
as a result of such changes. A new unit price will be made for such increase or decrease in cost in
accordance with the General Conditions. Sequence of sections being Constructed shall be as
approved by the Engineer, and shall be such as to avoid initial stressing of reinforcement.
Forms for surfaces between adjacent blocks of the dam may be removed as soon as the concrete has
hardened sufficiently to prevent surface damage. The placing of concrete in the dam shall conform
to the requirements in Clause 10.6.1.2. Every effort shall be made to affect a regular, periodic
placement of successive lifts throughout the dam.
Concrete shall be deposited under water by approved bottom discharging water-tight containers or
funnel shapedtremieswhich shall be kept continuously full with concrete up to a level above the
water and which shall have the discharging bottom immersed in the concrete with the water. Special
care shall be taken to avoid segregation.
Supports and shoring for concrete overhangs shall remain in place unit all concrete below and
adjacent to the overhang is at least 14 days old.
Vertical contraction joints in the concrete of the dam will be provided for convenience in
construction and to provide for contraction of the concrete. The joints shall be constructed in
accordance with the drawings unless otherwise directed by the Engineer.
Fillets, projections, steps and similar features which are placed monolithically with concrete in the
dam and which are not covered specifically for payment elsewhere in these specifications will be
measured and paid for as concrete in dam.
Concrete in canal lining shall be done to the lines, grades and thickness shown on the drawing or as
directed by the Engineer. The thickness of the lining specified shall be considered as the minimum
thickness. Unless otherwise directed, forms shall not be required for the concrete lining on slopes
where the side slopes of the canal are 1 vertical to 1 horizontal or flatter. The concrete lining shall
be placed inside the design cross- sectional dimensions of the canal. Contraction joints specified in
clause 10.5.3 shall be required where fixed structures intersect the canal lining.
The bottom and side slopes of the canal, in material other than rock, shall be finished accurately to
the dimensions shown on the drawings or as directed, any over-excavations, weathering, runnels,
viii
etc. beingback filled with approved material similar to the natural in – place soils. Large over brakes
in rock excavation may be filled with an approved free-draining material to restore the cross –
section of the canal to the required dimensions. In other respects, the preparation of surfaces shall
conform to the requirements in specification for buildings. If blanket filter is specified, then the
blanket filter shall be placed upon the prepared surfaces and the material shall be moistened with
water immediately before placement of concrete. Filter drains if required shall be constructed before
placement of blanket filter and if blanket filter is not specified along with filter drains, the filter
drains shall be conditioned as for blanket filter immediately before placement of concrete.
Placement of concrete shall conform to the requirements in Para 10.6.1.3 except that forms shall be
used where shown on the drawings or as directed by the Engineer. Transverse grooves shall be
provided by cutting grooves on the surface of the lining while the concrete is still plastic, spaced 3.5
to 4.5 m apart or as shown on drawing or as directed by the Engineer. The depth of the grooves
shall be between 2.5 to 3.0 mm and the bottom width between 1.0 to 1.25 mm.
RUBBLE MASONRY
Stones for all masonry work shall be obtained from quarries approved by the Engineer and shall be
the best quality obtainable. Stones shall be free from imperfections such as cracks, sand holes, veins
and laminations. Stones shall be clear grained, dense, heavy, durable and hard. Granite, basalt,
quartzite and limestone are suitable for masonry work.
Stones for rubble masonry shall be flat bottomed and not less than 150mm deep in any part and
225mm wide. The average thickness of individual stones may vary between 150mm to 225mm.The
percentage of smaller stones shall not be more than 25%.
Cement sand and mortar shall conform to the requirements in the specifications for Building works
Vo1 I.
11.2 Mortar
Unless otherwise specified by the Engineer, the mix proportions for the mortar shall consist of 1
part of cement to 5 parts of sand by volume. The mortar shall have a dry consistency.
All stones used in rubble masonry shall be cleaned and wetted before use to ensure bonding to the
mortar. Surface area of individual stones shall be about 0.3m2 varying in depth between 150 to
225mm. Every stones shall be set flush in mortar, leaving no dry work or hollow spaces. The stones
shall be laid on their flat face, using the larger stones for the foundation courses. Smaller stones not
exceeding twenty five percent of the larger stones shall be carefully selected to roughly fit the
ix
spaces between the larger ones. Chips and spalls shall be wedged into the spaces between the
different sizes of stones, where necessary, to prevent thick beds of mortar. Rolling or sledging of
heavy stones on the surface of recently laid.
Rubble pitching construction for protection of earth slopes of canals and ramps of causeways from
erosion shall consist of quarried rock bonded together with cement – sand mortar of specified mix
proportion, constructed as lining of specified minimum thickness shown on the drawings or as
directed by the Engineer.
The surfaces of the earthwork to be protected with rubble pitching shall be first finished to the
prescribed slopes, any weathering, runnels etc. being backfilled with approved material similar to
the in –place soils. The surfaces so prepared shall be moistened with water, if required, and tamped
or rolled to the satisfaction of the Engineer.
The materials and mortar for rubble pitching shall conform to the requirements in Clause 11.1 and
11.2 respectively. Stones for pitching shall conform as far as possible to the dimensions in Clause
11.3 The stones shall be laid and hammered down on the prepared surfaces of the earthwork,
approximately plane but not smooth. The stones shall be hand – packed in such a manner that joints
between stones can be completely filled with cement – sand mortar. Stones with overhanging joints
shall not be allowed. The sides and top and bottom edges shall be left as wedges. The “bushings” or
protuberances of stones shall not project more than 15mm from the slopes of the joints. The rubble
pitching shall be finished to the prescribed slopes, the permissible tolerance being 25mm in a length
of 3 m. The finished surfaces of the pitching shall be planes without depressions or protuberances.
The rubble pitching shall be cured with water for a period of at least three days commencing from
the time of the final setting of cement.
Rip-rap construction for protection of earth slopes of canals shall consist of quarried rock
constructed as a lining of specified minimum thickness shown on the drawings or as directed by the
Engineer.
x
LIGHT DUTY GATES AND HOISTS
12.1 General
The gates and hoists required in Gated Regulators and Turnouts are considered in these
specifications as Light Duty Gates and Hoists. The Engineer will furnish the drawings for the
fabrication and manufacture of Light Duty Gates and Hoists. However, alternate drawings for
approval of the Engineer may be submitted, which shall show design features better than or equal to
those in the drawings furnished by the Engineer.
In the submission of alternate drawings, 3 prints shall be furnished, one of which will be returned
marked “APPROVED” or “APPROVED EXCEPT AS NOTED” or “RETURNED FOR
CORRECTION”. The fabrication and manufacture of the gates and hoists shown on drawings
marked “APPROVED” or “APPROVED EXCEPT AS NOTED” shall be proceeded with subject to
any corrections and / or exceptions indicated on the drawings. On drawings marked “RETURNED
FOR CORRECTION”, all observations on the drawings and /or in comments of the drawings shall
be attended to and 3 prints of new drawings submitted for approval in the same manner as the
original submission.
In the event the alternate proposals approved by the Engineer involve less cost, an adjustment in
price shall be made in favor of the Engineer at the time of granting the approval. The required gate
together with the specified hoist of same shall be made as shown on the approved drawings and
installed in the locations shown on the drawings or as directed by the Engineer.
15.1 General
Where structures are to be repaired or modified they shall first be cleared of all silt, stones,
vegetation and rubbish. No separate payment will be made for this operation, the costs of which
shall be deemed to be covered in the rates for other work.
Where it is required the contractor shall carry out all operations required for dealing with water in
conformity with Chapter – 2.
xi
15.4 Demolition of Existing Concrete/Rubble Masonry Structures
Measurement for payment shall be by volume as determined by the Engineer. Payment shall be
made at the unit rate bid per cubic meter or demolition of brickwork or masonry, mass concrete or
reinforced concrete as the case may be. These rates shall be deemed to include to the costs of all
operations described above except for the removal of gate frames and hoists etc. and concrete pipes.
The removal of gate frames and hoists shall be paid for in accordance with the unit rate bid per
kilogram.
Existing Concrete Canal Lining shall be heightened with in –situ mass concrete as shown on the
Drawings. The top of the existing lining shall be exposed as required and the joint surface prepared
in accordance with Clause 10.5 hereof. The in –situ mass concrete shall be placed and compacted
with suitable formwork to both vertical faces in accordance with Chapter - 10 hereof as appropriate.
After curing and setting, compacted fill shall be placed around the lining to the required level in
accordance with Clause 3.5 hereof.
Measurement for payment shall be made by volume of concrete as shown on the Drawings or
directed by the Engineer. Payment shall be made at the unit rate bid per cubic meter of mass
concrete in raising canal linings which rate shall be deemed to cover the costs of exposing and
preparing the surface of the existing linings as required and of formwork. Filling around the lining
above the existing embankment level shall be paid for separately.
Where ordered by the Engineer, existing canals and structures shall be cleared of all loose stones
rubbish and weed growth below full supply level.
Grass and other sort of annual vegetation on the canal banks within the reservation shall be cut
down completely. Local irregularities in the bed and banks shall be trimmed and the material spread
to give a tidy appearance, and local slippage in the banks shall be trimmed and the slope reduced to
render them stable.
Unless otherwise directed by the Engineer, where the banks are stable the slopes shall not be
reduced to conform to the standard cross- sections shown in the drawings, and care shall be taken
not to remove the vegetation cover completely if this could result in instability. All waste materials
resulting from clearing shall be burnt and / or transported and placed beyond the toe of the outside
side slope of canal embankment used as roadway or as directed by the Engineer.
xii
IRRIGATION SCHEDULE OF RATES - 2021
RATE FOR
RATE FOR
SE. ITEM TCE
DESCRIPTION UNIT TCE ABOVE
NO. NO. BELLOW
3M/Rs.
3M/Rs.
62 YIR 022 Chaining traverse lines and taking offsets km 4,919.00 4,919.00
Detail site surveys including spot levels chaining
pegging and establishing B.M. these surveys are
63 YIR 023 nr 26,840.00 26,840.00
breaches spills etc.witch should not exceed 150m ×
150m
Marching pay = 1 unskilled labour day for 4.8 kms.
64 YIR 024 km 373.00 373.00
5 Type plan for Barbed wire fence (10 Stands) CPC/CS/11/04/2018/TYPE - ST/12
6 CPC/CS/11/04/2017/TYPE - ST/10
Type plan for Casting & Erecting fence post ( 1.7 m High)
7 CPC/CS/11/04/2018/TYPE - ST/11
Type plan for Casting & Erecting fence post (2.25m High)
8 Type plan for pre fabricated chain link fence CPC/CS/11/04/2017/TYPE - CLF/01
12 Type Plan of Soakage pit 4-0M ( Loose soil) (folly built 1.2m) CPC/CS/11/04/2018/TYPE - SP/03
13 CPC/CS/11/04/2018/TYPE - SFVCM
Type Plan of Soakage pit 4-0H ( Hard soil) (Semi built 1.2m)
14 CPC/CS/11/04/2018/TYPE - SP/05
Type Plan of Soakage pit 6'-0" ( Loose soil) (Fully built 1.8m)
15 Type plan of septic tank for 30 person (Brick) CPC/CS/11/04/2018/TYPE - SEPT/01 -(i):
22 Type plan for security weld mesh in open type building CPC/CS/11/04/2017/TYPE - ST/07
23 Type plan for special security grill fixed to Aluminium CPC/CS/11/04/2017/TYPE - ST/08
windows
iK
24 Type plan for special security grill fixed to windows CPC/CS/11/04/2017/TYPE - ST/09
26 Type plan of truss for span 20丨.0"-30’.0" ( Space of truss 15'- CPC/CS/11/04/2018/TYPE - ITR/02/1,2,3 ,
20)
27 Type plan of truss for span 30,.0,,-40,.0H ( Spacing of truss 15- CPC/CS/11/04/2018/TYPE - ITR/04/1,2,3
20)
Type plan of truss for span 20’.0"-30’.0" ( Spacing of truss
28
<15’) CPC/GS/11/04/2018/TYPE - ITR/01/1,2
29 Type plan of truss for span 30,.0,,-40,.0,* ( Spacing of truss CPC/CS/11/04/2018/TYPE - ITR/03/1,2
<15')
NOTE :-
1.No of Strands = 07
2.For detail of Fence Post
REFER DRW NO
CPC/CS/11 /04/2017/TYPE-ST/10
140mm
100
180
180
180
1700
300
150
2400
DETAIL DRAWING
NOTE :-
1.No of Strands = 10
2.For detail of Fence Post
REFER DRW NO
CPC/CS/11 /04/2018/TYPE-ST/11
140mm
100
2250
310
150
2400
DETAIL DRAWING
100
100
4R6
140
180
at 150mm c/c
with grade 25 concrete
SECTION X-X
180
180
1700
180
180
X X
480
150
150
DETAIL DRAWING
DEPUTY PROVINCIAL DIRECTOR (Eng. Services) PROVINCIAL DIRECTOR
BSR ITEM-G-016 PLANNING (ENGINEERING SERVICES)
CASTING & ERRECTING FENCE POST
140
4R6
180
180
180
SECTION X-X
2250
180
180
180
180
180
X X
490
150
150
DRAWN BY- NISHANI SCALE-NTS DRG. NO.-CPC/CS/ 11/ 04 /2018/TYPE-ST/11
DEPARTMENT OF ENGINEERING SERVICES TYPE PLAN DESIGNED BY- Eng. A.G.SAMARASINGHE DATE - 10-11-2018
CENTRAL PROVINCE, FOR CHECKED BY-
DETAIL DRAWING
DEPUTY PROVINCIAL DIRECTOR (Eng. Services) PROVINCIAL DIRECTOR
BSR ITEM- G-017 PLANNING (ENGINEERING SERVICES)
PERFARED PIPES BEHIND RETAINING WALL
working space
Water
proof with XYPEX
or equivalent
well compacted earth
Sander Chips
900 minimum
600
600
300
150
DEPARTMENT OF ENGINEERING SERVICES TYPE PLAN DESIGNED BY- Eng. A.G.SAMARASINGHE DATE - 01-11-2017
FOR CHECKED BY-
CENTRAL PROVINCE,
PERFARED PIPES IN
KANDY RETAINING WALL
DETAIL DRAWING
6"
LEVEL .
3"
6"
4"
GRADE 20 CT.
CONCRETE PAD
12"
DETAIL AT X
ALTERNATIVE RING FOUNDATION
TO SINK PIT IN LOOSE SOIL
10 mm Ø TOR
LIFTING HANDLES
"
0-9
4"
"
0-9
PLAN
G.L.
3"
6"
10'-0"
4"
GRADE 20 CT.
CONCRETE PAD
9"
2'-0"
SECTION DETAIL AT X
4"
3'-
9"
0'-
PLAN
6"
1:2:4 (3/4") CT. CON. PAD
12" GRADE 20
12"
3"
6"
4"
SECTION
GRADE 20 CT.
CONCRETE PAD
10"
12"
9"
R.C.C. CIRCULAR RING BEAM
R/F WITH 4 NOS. 12mm Ø TOR STEEL BARS DETAIL AT X
& 6mm Ø STIRRUPS AT 8" C/C.
10 mm Ø TOR
LIFTING HANDLES
0"
6'-
4"
"
0'-9 SECTION THRO LIFTING HANDLE
PLAN
3"
WATER UP TO "T.W.L. BEFORE BEING
X
G.L. PUT INTO USE.
G.L.
INTERNAL FACE OF SEPTIC TANK
TO BE RENDERED IN CEMENT
CT. CON. PAD
1'-2"
2"
GRADE 20 AS PER DETAIL . MORTAR IN TWO LAYERS
T.W.L. T.W.L. INTERNAL FACE OF SEPTIC TANK
TO BE RENDERED IN CEMENT MORTAR
1'-0"
EFFLUENT.
IN TWO LAYERS
6" dia. 1/2'' THK. EACH TWO COATS A WATER
6'-6"
PROOFING AGENT (THAROSEAL OR SMARTFLEX )
9" BRICK WORK
IN CT. MORTAR 1:5 . TO BE APPLIED ON THE FIRST LAYER
5'-0"
OF PLASTERING
4"
3" 3"
3" THICK LEAN B 6" THICK BASE SLAB 9" 9"
3"
3" 3"
9" 2 NO. SLABS ABOVE INLET
3"
9" L1 9"
L2
AND OUTLET TO BE WITH
DIMENSIONS OF SEPTIC TANKS
2 NO. 10mm Ø M.S. LIFTING
9"
DRAWN BY- Nilmini SCALE -4 FEET TO AN INCH DRG. NO.-CPC/CS/ 11/ 04 /2018/TYPE-SEPT/01-(i)
25mmx25mmx5mm
MS ANGLE IRON
50x50 swg 10
GI mesh
DETAIL at -A
40mm x 40mm x 5mm
MS Angle Iron frame
A 25mmx25mmx5mm
MS ANGLE IRON
GI sheet
LOCKING DEVICE
NOTE:
TYPE PLAN DRAWN BY- SHARLY SCALE-1:30 /1:100/1:250 DRG. NO.-CPC/CS/ 11/ 04 /2017/TYPE-ST/06
DEPARTMENT OF ENGINEERING SERVICES
FOR DESIGNED BY- Eng. A.G.SAMARASINGHE DATE - 01-11-2017
CENTRAL PROVINCE, SECURITY WELD CHECKED BY-
40 mmx 40 mmx 5 mm
Angle Iron Frame
T shape
30mmx5mm 30mmx5mm
flat iron flat iron 40mmx5mm
flat iron
30mmx5mm
flat iron
50mmx50mm
GI MESH 40mmx40mmx5mm
angle iron
30 flat iron
40 flat iron
DETAIL at -A NOTE:
TYPE PLAN DRAWN BY- SHARLY SCALE- NTS DRG. NO.-CPC/CS/ 11/ 04 /2017/TYPE-ST/07
DEPARTMENT OF ENGINEERING SERVICES FOR DESIGNED BY- Eng. A.G.SAMARASINGHE DATE - 01-11-2017
CENTRAL PROVINCE, SECURITY WELD CHECKED BY-
DETAIL DRAWING
PROVINCIAL DIRECTOR
BSR ITEM-J-030 DEPUTY PROVINCIAL DIRECTOR (Eng. Services)
PLANNING (ENGINEERING SERVICES)
SPECIAL SECURITY GRILL FIXED TO WINDOWS
1050mm
R 5.25mm
540mm
1200mm
120mm
105mm
NOTE:
4 2"
1
(TOP CHORD)
10mm THICK
M.S. GUZZLE PLATE WELDED
6"
6"
6mm THICK
12mm THICK BASE 50x50x5mm "L" angle
M.S. PLATE WELDED
PLATE WELDED
2 / 65x65x5"mm "L" ANGLE
"
5"
1'-3
(BOTTOM CHORD)
+
PVC }LY PVC PLY PVC ?LY
BOARD BOARD BOARD
l-.------{'{rt-_-.-l-.------.a'{'--2'a'-J F-316'--l-3'{'+3'6-
PVC PLY PVC PLY ?vc
BOARD BOARD PLY
BOAXD
GLASS GLASS
DOOR
OPENING
CLASS GI-ASS 3
PVC }LY PVC ?LY
BOARD BOARD
T
PVC PLY
BOARD
PVC PLY
BOARD
::<
4
ANNEX – 02
Approved Construction Material Price for
2021
CENTRAL PROVINCIAL PRICE COMMITTEE - 2021 FIRST HALF
D.C.S.(ENGINEERING) OFFICE
*All materials must be according to Sri Lanka standards. As for as possible
*All prices should be excluding VAT
2021
Item
Item. Unit. Approved
No
Rates
Labour:
Special skill labour (Aluminium Fabricator,
1 day 3,000.00
Tarman,Electrician,Plumber,Welder,Tiler…etc)
2 Skill labour day 2,500.00
3 Semi skill labour day 2,000.00
4 Unskill labour day 1,800.00
5 Scavenging Labour ( Cleaning) Day 2,000.00
6 Specialized Sanitory Labour Day 3,500.00
7 Plumber day 3,000.00
8 Tinker day 2,500.00
9 Welder day 3,000.00
10 Electrician day 3,000.00
11 Painter day 2,500.00
12 Bllow boy ( unskilled) day 1,800.00
13 Concreate mixer Operator day 2,000.00
14 Poker Operator day 2,000.00
31 Cu.m 2,350.00
Crusher Produced (37.5mm)graded (table 1701.5 for ABC)
32 Aggregate for seal coat 19mm (SSCM table 1701-8) Cu.m 2,800.00
33 Cu.m 3,500.00
Aggregate for seal coat 12.5mm (SSCM table 1701-8)
34 Cu.m 3,401.00
Aggregate for seal coat 9.5 mm (SSCM table 1701-8)
35 Approved soil type I & II for bases & shoulders Cu.m 415.00
Sand:
41 River sand m3 3,533.00
42 River sand for road surface (SSCM table 1701-9) Cu.m 3,885.00
43 Offshore sand ( Wash & Siebed) m3 3,427.00
44 Gravel m3 580.00
45 Soil m3 420.00
Bricks:
Bricks - Size (8 3/4'' x 4 1/2'' x 2 3/4'' Nominal )
46 1000 nrs 16,000.00
(225mmx112.5mmx70mm)
Bricks - ( Large Size Volume 1.5 larger than Engineering
47 1000 nrs 22,000.00
Bricks Nominal)
Cement /Lime
48 Cement 50 Kg 925.92
101 Ready mixed concrete (grade 20) Transport upto 15km m3 14,700.00
106 m3 750.00
Additional charge for pumping concrete (1m3)upto 15km
Additional Transport charge for pumping Car beyond
107 km 200.00
15km(per km)
Asbestos Items:
108 Asbestos roofing sheets (corragated) m2 730.56
109 Asbestos ridging close fit. (1100mm)long pair nr 782.41
110 Asbestos ceiling sheets. (1200mmx1200mm) nr 560.87
Zn/Al Products
111 Zn/Al Roofing sheet (0.47mm thick) (Trim Clad) m2 1,292.00
Zn/Al Roofing sheet (0.47mm thick) (Tile
112 m2 1,350.00
Profile)
113 Zn/Al Ridge cap,(0.47mm thick) m 554.00
115 nr 289.80
Zn / Al Down pipe bend 100 mmX 100 mm, 0.47mm thick
116 nr 1,549.00
Zn / Al Down pipe offset 100mm X 100 mm, 0.47mm thick
117 Zn / Al Down pipe Bracket nr 19.00
118 Zn / Al Nozzle nr 300.00
119 Zn / Al Gutter (470 mm Girth ) m 575.00
120 Zn / Al End Cap 0.47mm thick nr 136.00
121 Zn / Al Guter Bend 0.47mm thick nr 545.00
122 Zn / Al Guter Box 0.47mm thick nr 670.00
123 Zn / Al Guter bracket 0.47mm thick nr 52.00
124 Zn / Al Egde/Gable capping 0.47mm thick m 448.00
125 m 313.00
Zn / Al Corner capping for wall cladding 0.47mm thick
126 Zn / Al 0.47mm thick barge cap m 554.00
127 Zn / Al End capping 0.47mm thick m 313.00
128 Zn / Al Corner capping 0.47mm thick m 448.00
129 Zn / Al Bottom capping 0.47mm thick m 448.00
130 Zn / Al Top capping 0.47mm thick m 554.00
137 m 943.00
Lipped Channel Size 100mm x 50mm x 12mm (2mm tk.) GI
138 m 1,294.00
Lipped Channel Size 150mm x 65mm x 14mm (2mm tk.) GI
139 C -Purlin 100mm x 50mm (2mm tk.) m 690.00
140 75mm x75mm gauge 17 welded wire mesh m2 109.63
Laminated aluminium foil, 4mm thick double side double
141 m2 420.00
bubble insulation layer
Zn/Al Sandwich pannel Roofing- 30mm (Sheet thickness -
142 m2 4,800.00
Top 0.47mm, Bottom -0.35mm)
Zn/Al Sandwich pannel Roofing - 40mm (Sheet thickness -
143 m2 5,450.00
Top 0.47mm, Bottom -0.35mm)
Zn/Al Sandwich pannel Roofing - 50mm (Sheet thickness -
144 m2 5,850.00
Top 0.47mm, Bottom -0.35mm)
Zn/Al Sandwich pannel Roofing - 60mm (Sheet thickness -
145 m2 6,300.00
Top 0.47mm, Bottom -0.35mm)
Ceiling
146 PVC Ceiling pannels width 200mm m2 1,291.67
185 m 696.21
Timber 4"x2" cl.I (Nominal size ) Micro 4.2m<×<5.4m
Timber 4"x2"(100mmx50mm) cl.II (Nominal size )
186 m 451.86
bellow4m
187 Timber 4"x2"(100mmx50mm)cl.III (Nominal size) m 155.12
204 m2 3,041.97
Timber planks 3/4"(20mm)to 1"(25mm)cl.I (Nominal size )
205 m2 2,522.59
Timber planks 3/4" (20mm)to 1" (25mm)cl.II(Nominal size )
Timber planks 3/4" (20mm) tongued & grooved -
206 m2 968.00
''Lunumiddalla''. (Nominal size )
211 nr 265.00
JungleTimber props 3" (75mm) dia., 2.5m to 3.5m length
212 m 3,270.70
Kumbuk timber 6'' X 3'' (150mmx75mm) (Nominal size )
213 Beading 1 1/2"X 1/2" (37.5mmx12.5mm) m 32.80
214 Moulding 1 1/2"X 1 1/2" (37.5mmx37.5mm) (Midella) m 45.92
215 Beading 1/2" x 1/2" (12.5mmx12.5mm) m 9.00
216 Round Timber 3" (75mm) dia.upto 2.5m m 45.00
Timber round jungle-100mm minimum & 150 mm average
217 m 80.00
diameter (incl transport)
Timber round jungle-150mm minimum & 200 mm average
218 m 150.00
diameter (incl transport)
219 Firewood m3 1,400.00
220 Bamboo tree length greater than 8 meters nr 483.00
221 m 472.32
Ginisapu plank 9" x 3/4" (225mmx20mm) (Nominal size )
Jack timber 4" x 3"(100mmx75mm) (Nominal size ) ,below
222 m 1,452.45
5.6m,225mm wide
Jack timber 4" x 2" (100mmx75mm) (Nominal size ) ,below
223 m 952.48
5.6m,225mm wide
224 Mee timber 6'' X 3'' (150mmx75mm) (Nominal size ) m 961.25
226 Timber planks 1" thick & 8'' width classII m2 1,250.00
227 Timber planks 1" thick & 8'' width class III m2 875.00
Steel :
244 QT steel bars MT 150,000.00
Paint :
257 Enamel Paint (4ltr) nr 4,166.67
PVC
287 Bend P V C 1/2" (20mm) nr 31.48
Sanitury Fittings
444 Cromium plated Piller tap nr 3,750.00
445 nr 3,796.30
Cromium plated Piller tap ( Rocell Vero or equivalent )
446 nr 2,129.63
Cromium plated Bib tap ( Rocell SD9A126 or equivalent )
447 Chromium Plated Sawn neck Type Piller Tap nr 3,055.56
Chromium Plated Sawn neck Type Piller Tap (Rocell
448 nr 2,685.19
N091214 or equivalent)
449 Cromium plated Conseal Valve nr 2,731.48
Cromium plated Conseal Valve ( Rocell 4,074.07
450 nr
RB.TAB.OFA320.CB.PN or equivalent )
451 Urinal flush valve (Chromium Plated) nr 4,861.11
452 Urinal flush valve (Chromium Plated) -Rocell nr 6,851.85
453 Ceramic Closet Squatting - Medium nr 5,833.33
454 Rubber ring for sink nr 138.89
455 Plastic Low Level cistern nr 4,629.63
456 Ceramic Corner Wash Basin- nr 2,638.89
Ceramic Corner Wash Basin- (Rocell - Aqua
457 nr 8,518.52
RB.ACO.01G101.01.06 or equivalent)
458 Ceramic Wash basin 600x375x175 mm nr 7,870.37
Wash basin with pedestal Vitreous China 575 X 450 X
459 820mm ( Rocell urban D or equivalent) nr 13,148.15
507 Plastic Basin Piller 1/2" Quarter Turn Straight Handle nr 717.59
Plastic Sink Piller Tap 1/2" Quarter Turn Straight Handle nr
508 717.59
Plastic Garden Tap 1/2" Quarter Turn Straight Handle nr
509 398.15
Plastic Bidet Shower nr
510 921.30
Plastic Stop Tap 1. 1/2" Round Handle nr
511 361.11
" " " 2. 3/4" Round Handle nr
512 537.04
" " " 3. 1" Round Handle nr
513 703.70
Plastic Stop Tap 1. 1/2" Tee Handle nr
514 263.89
" " " 2. 3/4" Tee Handle nr
515 402.78
Aluminum
Anodized Aluminium architectural section No 100D 3105 or
521 m 1,687.18
similar sections.
Anodized Aluminium architectural section No SPR 106 or
522 m 774.74
similar sections.
Anodized Aluminium architectural section No 70S 1801 or
523 m 590.03
similar sections.
Anodized Aluminium architectural section No 70S 1202-1
524 m 488.60
or similar sections.
Anodized Aluminium architectural section No 100D - 103
525 m 1,777.06
or similar sections.
Anodized Aluminium architectural section No 100D - 101
526 m 1,697.57
or similar sections.
Anodized Aluminium architectural section No 100D - 201
527 m 1,637.75
or similar sections.
Anodized Aluminium architectural section No 100D - 301
528 m 1,952.14
or similar sections.
Anodized Aluminium architectural section No 100D - 401
529 m 2,161.82
or similar sections.
Anodized Aluminium architectural section No 100D - 501
530 m 231.19
or similar sections.
Anodized Aluminium architectural section No PT-5159 or
531 m 862.68
similar sections.
Anodized Aluminium architectural section No SPR-4521 or
532 m 578.05
similar sections.
Anodized Aluminium architectural section No CA-1009 or
533 m 745.30
similar sections.
Anodized Aluminium architectural section No CA-1010 or
534 m 982.85
similar sections.
Anodized Aluminium architectural section No CA-2005 or
535 m 953.25
similar sections.
Anodized Aluminium architectural section No 70S-1001-1
536 m 950.71
or similar sections.
Anodized Aluminium architectural section No 70S-1101-1
537 m 929.20
or similar sections.
Anodized Aluminium architectural section No 70S-1201-1
538 m 773.50
or similar sections.
Anodized Aluminium architectural section No 70S-1401 or
539 m 652.85
similar sections.
Anodized Aluminium architectural section No 70S-1501 or
540 m 853.70
similar sections.
Anodized Aluminium architectural section No 70S-1601 or
541 m 752.85
similar sections.
Anodized Aluminium architectural section No 70SM - 1011
542 m 922.08
or similar sections.
Contruction Chemicals
663 Baralastic 7.2 kg bag 3,600.00
669 Green seal 200mm (fd) Water bar 20m roll nr 19,500.00
General Hardware
671 Brass Barrel Bolt -4" with Screws nr 460.00
680 Brass Butt Hinges 4" x 2 1/2" with Screws pair 518.00
681 Iron Oxidized Butt Hinges 4" x 2 1/2" with Screws pair 200.00
682 Lock Mortice Double Hung nr 4,000.00
772 nr 140.00
Coir string for for fixing scaffolding (per 93 square meters)
Minor repairs parapets with cement sand and water (per 9.29
773 nr 600.00
sq.meters)
Fuel(For loosening road surface in manual breaking 50mm
774 nr 40.00
depth*307 sqm)
Roller Door
797 Zn/Al powder coated roller door m2 7,407.50
1310 Ceiling fan 1400mm diameter - Ring (Type 1) - SLS 814 nr 8,600.00
1313 Exhaust fan 200mm diameter with auto shutter (Type 1) nr 7,600.00
1314 Exhaust fan 300mm diameter with auto shutter (Type 1) nr 10,200.00
1315 Orbit fan (Type 1) nr 16,000.00
1316 Five step fan regulator (Type 1) nr 879.63
1320 Exhaust fan 300mm diameter with auto shutter (Type 2) nr 4,629.63
1321 Orbit fan (Type 2) nr 6,018.52
1322 Five step fan regulator (Type 2) nr 879.63
1323 Fan hook nr 138.89
2007 Tar Boiler (Heating with firewood) ( Without operator. ) Day 600.00
2008 Sand/chip spreader-propelled Day 25,000.00
2009 Sand/chip spreader-towed Day 2,500.00
2010 Emulsion sprayer self prop.(4000 litres) Day 26,495.56
2011 Concrete mixer with weigh batcher 114/10 * Day 7,256.00
2012 Hand held Breaker (Demolisher) (less operater) Day 506.65
2013 Bitumen sprayer (Less Operator) Day 4,000.00
2014 Water tank+50mm pump (Less Operator) Day 1,765.00
2015 Transport of premix by dump truck-Rate for 1 km MT/km 18.90
2016 Transport of Emulsion (100ltr) km 4.00
2017 Asphalt paver (crawler) hour 7,839.00
2018 Asphalt paver (Wheel) hour 8,724.90
2019 Tanker only (20000 litres) hour 311.00
2020 Baby dumper 0.75 cu.m (Less Operator) hour 1,260.00
2021 Prime mover old (for 20000 L tanker) hour 3,500.00
2022 Trolley emulsion (less operator) hour 114.70
2023 Sprayer emulsion hand cart hour 815.91
2024 Bitumen distributor 750 litres hour 1,700.00
2025 Tank truck bitumen 10000 Ltr hour 4,442.95
2026 Crusher stone 40t/h hour 11,493.26
2027 Track drill crawler hour 1,808.50
2028 Slurry sealing Machine hour 13,399.51
2029 Asphalt plant 60t/h hot mix hour 20,618.02
2030 Cold mix plant 15ton hour 10,651.02
2031 Lorry 17 ton Self Loading (wet) km 173.15
2032 Emulsion Tank Truck (8000litres) km 134.37
2033 Excavator Mobile hour 3,100.00
2034 Excavator 120 hour 3,500.00
2035 Mobile Crane 25T hour 8,341.80
2036 Mobile Crane 30T hour 10,549.76
2037 Pneumatic roller 8 -10 ton hour 4,142.00
2038 Smooth /Road Roller 8 - 10 ton static Day 14,660.00
2039 Vibrating Roller 0.5 - 1.0 ton Day 6,865.00
2040 Vibrating roller 6 - 7 ton tendum Day 22,160.00
2041 Vibrating roller10 ton smooth Day 27,488.00
2060 Lorry/Tipper/Dump truck (exceeding 10km) for 1km Rate Cu.m/km 28.95
2061 Lorry/Tipper/Dump truck Rate for up to 10km Cu.m/km 40.00
2062 Lorry/Tipper/Dump truck (3 T) Day 8,500.00
2063 Lorry 3 tons(2.5 cu.m)(beyond 10km) km 57.50
2064 Lorry 5 tons(3.5 cu.m)(beyond 10km) km 71.00
2065 Lorry 7 tons(4.5 cu.m)(beyond 10km) km 86.00
2066 Pick up 2WD/Car/Van(beyond 10km) km 41.00
2067 Pickup 4WD km 60.00
2068 Vibrating rammer (60kg)(Less Operator) Day 3,900.00
2069 Pickup truck 2WD km 60.00
Transport of materials 25m to 100m by any means ( Incl.
2070 Loading and Unloading) Cu.m 465.10
Transport 100m to 0.5km by any means (Excluding
2071 Loading) Cu.m 258.60
Transport 0.5km to 1.0km by any means (Excluding
2072 Loading) Cu.m 277.05
Transport of each subsequent 1.0km from 1.0 - 8.0km. By
2073 any means : (Excluding Loading) Cu.m 43.10
Transport of each subsequent 1.0km beyond 8km. By any
2074 means : (Excluding Loading) Cu.m 28.95
Transport of material in bulk excluding loading(for distance
2075 less than or equal 3km) Cu.m 89.15
Transport of material in bulk excluding loading(for distance
2076 from 3km upto 10km distance) Cu.m/km 29.70
Transport of material in bulk excluding loading(for distance
2077 more than 10km) Cu.m/km 26.20